Mount Construction Co., Inc.: NJDOT bid record
Mount Construction Co., Inc. submitted 166 bids on New Jersey DOT contracts in the data, from 22 JUN 2017 to 08 JUN 2023, and was the low bidder on 32 of them (19%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $185,915,128
- Latest bid
- 08 JUN 2023
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 2 | 0 | 0% |
| 2018 | 30 | 10 | 33% |
| 2019 | 21 | 6 | 29% |
| 2020 | 29 | 8 | 28% |
| 2021 | 37 | 5 | 14% |
| 2022 | 27 | 0 | 0% |
| 2023 | 20 | 3 | 15% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 44 | 9 | 20% |
| S4 | 36 | 12 | 33% |
| N4 | 35 | 5 | 14% |
| C4 | 34 | 5 | 15% |
| N1 | 7 | 0 | 0% |
| S1 | 6 | 0 | 0% |
| C1 | 4 | 1 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Force account | 109006M | DOL | 96 | 96 (100%) | $1.00 | $1.00 |
| Overtime differential (OD) | MMG025M | DOL | 95 | 95 (100%) | $1.00 | $1.00 |
| Solid waste disposal | MMB173M | DOL | 88 | 88 (100%) | $1.00 | $1.00 |
| Telephone service | MMG010M | DOL | 85 | 85 (100%) | $1.00 | $1.00 |
| Crew coordinator | MMB092M | HR | 72 | 72 (100%) | $135.00 | $135.00 |
| Disposal of regulated material, hazardous | MMG064M | DOL | 57 | 57 (100%) | $1.00 | $1.00 |
| Performance bond and payment bond | 151006M | DOL | 32 | 26 (81%) | $10,000 | $32,468 |
| Breakaway barricade | 159003M | U | 34 | 24 (71%) | $1.00 | $1.00 |
| Lane closures | MMB172M | HR | 53 | 23 (43%) | $40.00 | $1.00 |
| Drum | 159006M | U | 31 | 20 (65%) | $1.00 | $1.00 |
| Traffic cone | 159009M | U | 28 | 20 (71%) | $1.00 | $9.20 |
| Fuel price adjustment | 160004M | DOL | 16 | 16 (100%) | $1,800.00 | $2,700.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 132 | 97 of 132 |
| Joseph M. Sanzari, Inc. | 95 | 50 of 95 |
| Berto Construction, Inc. | 20 | 10 of 20 |
| Agate Construction Co., Inc. | 19 | 7 of 19 |
| PKF-Mark III, Inc. | 14 | 8 of 14 |
| Midlantic Construction, LLC | 13 | 1 of 13 |
| Sparwick Contracting, Inc. | 12 | 8 of 12 |
| Ferreira Construction Co., Inc. | 11 | 7 of 11 |
| Colonnelli Brothers, Inc. | 11 | 4 of 11 |
| South State, Inc. | 10 | 9 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 JUN 2023 | 23104 | C1 | Forest Resource Edu. Center Access Rd Bridge over Toms River | 5 of 5 | $4,468,431 | +71% |
| 08 JUN 2023 | 23120 | C1 | CR 571 (WASHINGTON ROAD) BRIDGE OVER D&R CANAL | 1 of 3 | $9,447,487 | Low, 14% under the second |
| 06 JUN 2023 | 23452 | C4 | MTN JOC Infrastructure Repairs, Central-2023 | 3 of 3 | $10,634,112 | +17% |
| 06 JUN 2023 | 23469 | C4 | Sign and Sign Structures Repair Contract, Central 2023 | 3 of 4 | $1,055,432 | +9.0% |
| 01 JUN 2023 | 23453 | S4 | MTN JOC Infrastructure Repairs, South-2023 | 3 of 3 | $5,789,205 | +12% |
| 01 JUN 2023 | 23470 | S4 | Sign and Sign Structures Repair Contract, South 2023 | 2 of 2 | $797,431 | +9.0% |
| 25 MAY 2023 | 23451 | N4 | MTN JOC Infrastructure Repairs, North-2023 | 3 of 3 | $7,403,335 | +20% |
| 25 MAY 2023 | 23467 | S4 | MTN ORPHAN BRIDGE REP. SOUTH-2023 | 2 of 3 | $1,255,852 | +12% |
| 25 MAY 2023 | 23468 | N4 | Sign and Sign Structures Repair Contract, North 2023 | 3 of 3 | $1,175,431 | +10% |
| 23 MAY 2023 | 23466 | C4 | MTN ORPHAN BRIDGE REP. CENTRAL-2023 | 6 of 6 | $1,899,431 | +17% |
| 18 MAY 2023 | 23465 | N4 | MTN ORPHAN BRIDGE REP. NORTH-2023 | 6 of 7 | $1,999,431 | +37% |
| 11 MAY 2023 | 23454 | N4 | Drainage Restoration Contract, North-2023 | 3 of 3 | $9,199,431 | +110% |
| 04 MAY 2023 | 23455 | C4 | Drainage Restoration Contract, Central-2023 | 1 of 3 | $6,474,431 | Low, 4.0% under the second |
| 27 APR 2023 | 23456 | S4 | Drainage Restoration Contract, South-2023 | 1 of 2 | $6,089,431 | Low, 1.0% under the second |
| 30 MAR 2023 | 23440 | H4 | MTN MVB & TUNNEL REP 2023 | 2 of 2 | $16,997,431 | +11% |
| 02 MAR 2023 | 22445 | H4 | MTN JOC Bridge Repairs, Statewide 2022 | 3 of 3 | $4,737,000 | +6.0% |
| 24 JAN 2023 | 22452 | H4 | Bridge Preventive MTN 2022-3 | 2 of 5 | $9,723,431 | +9.0% |
| 19 JAN 2023 | 22451 | H4 | Bridge Preventive MTN 2022-2 | 5 of 5 | $7,777,431 | +45% |
| 10 JAN 2023 | 21410 | H4 | Signature Bridge Preventive MTN 2021-1 | 4 of 4 | $11,681,177 | +41% |
| 10 JAN 2023 | 22450 | H4 | Bridge Preventive MTN 2022-1 | 3 of 6 | $8,945,876 | +50% |
| 15 DEC 2022 | 23430 | S4 | MTN Infrastructure Rep Gloucester Salem 2023 | 2 of 2 | $3,297,377 | +10% |
| 13 DEC 2022 | 23429 | C4 | MTN Infrastructure Rep Mercer Middlesex Somerset 2023 | 4 of 5 | $3,178,627 | +21% |
| 08 DEC 2022 | 23428 | N4 | MTN Infrastructure Repair Sussex Warren-2023 | 2 of 4 | $3,131,127 | +26% |
| 17 NOV 2022 | 23433 | S4 | MTN STORMWATER FACILITY RES SOUTH 2023 | 2 of 3 | $7,439,002 | +1.0% |
| 15 NOV 2022 | 23432 | C4 | MTN STORMWATER FACILITY RES CENTRAL 2023 | 2 of 4 | $13,529,077 | +16% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.