Mount Construction Co., Inc.: NJDOT bid record

Mount Construction Co., Inc. submitted 166 bids on New Jersey DOT contracts in the data, from 22 JUN 2017 to 08 JUN 2023, and was the low bidder on 32 of them (19%). When it was not low, its total sat a median +13% above the low bid.

Owner
New Jersey DOT
Low bid volume
$185,915,128
Latest bid
08 JUN 2023
Data through
16 APR 2026
166Bids
32Low bids
19Win rate, percent
+13%Median gap to the low bid when not low, 134 bids

By year

YearBidsLow bidsWin rate
2017200%
2018301033%
201921629%
202029828%
202137514%
20222700%
202320315%
Mount Construction Co., Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
H444920%
S4361233%
N435514%
C434515%
N1700%
S1600%
C14125%
Mount Construction Co., Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Force account109006MDOL9696 (100%)$1.00$1.00
Overtime differential (OD)MMG025MDOL9595 (100%)$1.00$1.00
Solid waste disposalMMB173MDOL8888 (100%)$1.00$1.00
Telephone serviceMMG010MDOL8585 (100%)$1.00$1.00
Crew coordinatorMMB092MHR7272 (100%)$135.00$135.00
Disposal of regulated material, hazardousMMG064MDOL5757 (100%)$1.00$1.00
Performance bond and payment bond151006MDOL3226 (81%)$10,000$32,468
Breakaway barricade159003MU3424 (71%)$1.00$1.00
Lane closuresMMB172MHR5323 (43%)$40.00$1.00
Drum159006MU3120 (65%)$1.00$1.00
Traffic cone159009MU2820 (71%)$1.00$9.20
Fuel price adjustment160004MDOL1616 (100%)$1,800.00$2,700.00
Mount Construction Co., Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Mount Construction Co., Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
08 JUN 202323104C1Forest Resource Edu. Center Access Rd Bridge over Toms River5 of 5$4,468,431+71%
08 JUN 202323120C1CR 571 (WASHINGTON ROAD) BRIDGE OVER D&R CANAL1 of 3$9,447,487Low, 14% under the second
06 JUN 202323452C4MTN JOC Infrastructure Repairs, Central-20233 of 3$10,634,112+17%
06 JUN 202323469C4Sign and Sign Structures Repair Contract, Central 20233 of 4$1,055,432+9.0%
01 JUN 202323453S4MTN JOC Infrastructure Repairs, South-20233 of 3$5,789,205+12%
01 JUN 202323470S4Sign and Sign Structures Repair Contract, South 20232 of 2$797,431+9.0%
25 MAY 202323451N4MTN JOC Infrastructure Repairs, North-20233 of 3$7,403,335+20%
25 MAY 202323467S4MTN ORPHAN BRIDGE REP. SOUTH-20232 of 3$1,255,852+12%
25 MAY 202323468N4Sign and Sign Structures Repair Contract, North 20233 of 3$1,175,431+10%
23 MAY 202323466C4MTN ORPHAN BRIDGE REP. CENTRAL-20236 of 6$1,899,431+17%
18 MAY 202323465N4MTN ORPHAN BRIDGE REP. NORTH-20236 of 7$1,999,431+37%
11 MAY 202323454N4Drainage Restoration Contract, North-20233 of 3$9,199,431+110%
04 MAY 202323455C4Drainage Restoration Contract, Central-20231 of 3$6,474,431Low, 4.0% under the second
27 APR 202323456S4Drainage Restoration Contract, South-20231 of 2$6,089,431Low, 1.0% under the second
30 MAR 202323440H4MTN MVB & TUNNEL REP 20232 of 2$16,997,431+11%
02 MAR 202322445H4MTN JOC Bridge Repairs, Statewide 20223 of 3$4,737,000+6.0%
24 JAN 202322452H4Bridge Preventive MTN 2022-32 of 5$9,723,431+9.0%
19 JAN 202322451H4Bridge Preventive MTN 2022-25 of 5$7,777,431+45%
10 JAN 202321410H4Signature Bridge Preventive MTN 2021-14 of 4$11,681,177+41%
10 JAN 202322450H4Bridge Preventive MTN 2022-13 of 6$8,945,876+50%
15 DEC 202223430S4MTN Infrastructure Rep Gloucester Salem 20232 of 2$3,297,377+10%
13 DEC 202223429C4MTN Infrastructure Rep Mercer Middlesex Somerset 20234 of 5$3,178,627+21%
08 DEC 202223428N4MTN Infrastructure Repair Sussex Warren-20232 of 4$3,131,127+26%
17 NOV 202223433S4MTN STORMWATER FACILITY RES SOUTH 20232 of 3$7,439,002+1.0%
15 NOV 202223432C4MTN STORMWATER FACILITY RES CENTRAL 20232 of 4$13,529,077+16%
Mount Construction Co., Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy