Agate Construction Co., Inc.: NJDOT bid record
Agate Construction Co., Inc. submitted 44 bids on New Jersey DOT contracts in the data, from 13 JUL 2017 to 28 AUG 2025, and was the low bidder on 8 of them (18%). When it was not low, its total sat a median +30% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $85,824,372
- Latest bid
- 28 AUG 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 2 | 1 | 50% |
| 2018 | 3 | 0 | 0% |
| 2019 | 7 | 0 | 0% |
| 2020 | 10 | 2 | 20% |
| 2021 | 7 | 0 | 0% |
| 2022 | 1 | 1 | 100% |
| 2023 | 5 | 1 | 20% |
| 2024 | 6 | 1 | 17% |
| 2025 | 3 | 2 | 67% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 16 | 3 | 19% |
| N1 | 9 | 3 | 33% |
| C1 | 5 | 0 | 0% |
| S1 | 4 | 1 | 25% |
| N4 | 4 | 0 | 0% |
| S4 | 4 | 1 | 25% |
| C4 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sheeting | 501003P | SF | 16 | 14 (88%) | $1.00 | $18.06 |
| Traffic stripes, 4" | 610003M | LF | 21 | 13 (62%) | $1.00 | $0.50 |
| Substructure concrete repair | 555003M | SF | 22 | 12 (55%) | $325.00 | $325.00 |
| Fuel price adjustment | 160004M | DOL | 12 | 12 (100%) | $700.00 | $2,700.00 |
| Performance bond and payment bond | 151006M | DOL | 27 | 11 (41%) | $40,000 | $32,468 |
| E-Z pass | MMG009M | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Railroad services | MMB188M | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Traffic control truck with mounted crash cushion | 159108M | U | 21 | 9 (43%) | $10,000 | $7,000.00 |
| Field office type E maintenance | 155033M | MO | 17 | 9 (53%) | $3,000.00 | $3,500.00 |
| Construction signs | 159012M | SF | 26 | 8 (31%) | $15.00 | $15.00 |
| Reinforcement steel, epoxy- coated | 504006P | LB | 25 | 8 (32%) | $1.65 | $2.52 |
| Concrete sidewalk, 4" thick | 606012P | SY | 16 | 8 (50%) | $99.50 | $126.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 29 | 13 of 29 |
| Mount Construction Co., Inc. | 19 | 12 of 19 |
| PKF-Mark III, Inc. | 15 | 11 of 15 |
| South State, Inc. | 9 | 3 of 9 |
| Midlantic Construction, LLC | 7 | 3 of 7 |
| Joseph M. Sanzari, Inc. | 7 | 7 of 7 |
| Berto Construction, Inc. | 6 | 5 of 6 |
| JPC Group, Inc. | 6 | 1 of 6 |
| Anselmi & Decicco, Inc. | 6 | 2 of 6 |
| Richard E. Pierson Construction Co., Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2025 | 25703 | N1 | Ferry Slip Reconstruction Liberty State Park Phase 1 | 2 of 2 | $11,237,323 | +5.0% |
| 11 FEB 2025 | 24473 | H4 | RE-ADV Drawbridge Preventive Maintenance 2023-1 | 1 of 2 | $22,975,953 | Low, 15% under the second |
| 11 FEB 2025 | 25416 | N1 | NJ7 MOVABLE BRIDGE ELEVATOR REPLACEMENT 2025-1 | 1 of 1 | $3,984,700 | Low |
| 14 NOV 2024 | 24708 | N1 | Liberty State Park Ferry and Emergency Evacuation Terminal | 2 of 4 | $27,575,446 | +24% |
| 07 NOV 2024 | 22468 | S4 | Maintenance Bridge Fender Installation 2022-1 | 2 of 3 | $3,767,476 | +42% |
| 24 OCT 2024 | 23459 | H4 | DRAWBRIDGE PREVENTIVE MAINTENANCE 2023-2 | 2 of 2 | $25,330,000 | +24% |
| 11 JUN 2024 | 23460 | H4 | Drawbridge Preventive Maintenance Contract 2023-3 | 2 of 3 | $16,867,707 | +3.0% |
| 27 FEB 2024 | 23414 | S4 | Maintenance NJ-44 Mantua Creek Bulkhead Repair Contract | 1 of 2 | $3,756,824 | Low, 17% under the second |
| 22 FEB 2024 | 18450 | H4 | Maintenance Bridge Fender Replacement Contract 2018-1 | 3 of 5 | $21,753,514 | +19% |
| 05 DEC 2023 | 24436 | S4 | MTN TIMBER AND UNDERWATER, SOUTH - 2024 | 2 of 4 | $4,920,030 | +3.0% |
| 30 NOV 2023 | 24435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2024 | 3 of 3 | $7,335,740 | +9.0% |
| 28 NOV 2023 | 24434 | N4 | MTN TIMBER AND UNDERWATER, NORTH - 2024 | 3 of 4 | $17,037,500 | +30% |
| 26 SEP 2023 | 22472 | N1 | US 1&9T Pas & Hac Mov Bridge Elevator Rep Contract 2022-1 | 1 of 3 | $13,567,300 | Low, 15% under the second |
| 24 JAN 2023 | 22452 | H4 | Bridge Preventive MTN 2022-3 | 4 of 5 | $12,455,771 | +40% |
| 31 MAR 2022 | 22461 | N1 | RE-ADV WILLIAM A. STICKEL BRIDGE ELEVATOR REPLACEMENT | 1 of 4 | $6,679,400 | Low, 3.0% under the second |
| 28 OCT 2021 | 22434 | N4 | MTN TIMBER AND UNDERWATER, NORTH - 2022 | 3 of 3 | $18,136,050 | +137% |
| 10 JUN 2021 | 20457 | H4 | Signature Bridge Preventive Maintenance 2020-1 | 4 of 5 | $18,849,260 | +60% |
| 10 JUN 2021 | 21131 | S1 | Route 42 Bridges Over Blackwood Railroad Trail | 9 of 10 | $32,161,566 | +51% |
| 03 JUN 2021 | 21456 | H4 | MTN RT 37 TUNNEY BRDG PILE RPR | 2 of 5 | $8,075,000 | +7.0% |
| 27 MAY 2021 | 21121 | N1 | Rt 22 Rockfall Mitigation, Phillipsburg | 5 of 6 | $7,837,717 | +57% |
| 16 MAR 2021 | 20467 | H4 | Bridge Preventive Maintenance Contract 2020-3 | 7 of 8 | $10,499,640 | +33% |
| 11 MAR 2021 | 20465 | H4 | Bridge Preventive Maintenance Contract 2020-1 | 6 of 6 | $14,714,800 | +94% |
| 10 NOV 2020 | 20134 | S1 | Route 30 over Beach Thorofare | 2 of 6 | $25,227,555 | +29% |
| 16 JUL 2020 | 20461 | H4 | Maintenance Fire Standpipe Passaic River Bridge Route 1&9T | 2 of 4 | $2,512,815 | +40% |
| 02 JUL 2020 | 20122 | N1 | Route 78 Rockfall Mitigation | 6 of 14 | $34,150,673 | +53% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.