Joseph M. Sanzari, Inc.: NJDOT bid record
Joseph M. Sanzari, Inc. submitted 159 bids on New Jersey DOT contracts in the data, from 22 JUN 2017 to 24 MAR 2026, and was the low bidder on 31 of them (19%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $304,567,086
- Latest bid
- 24 MAR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 2 | 1 | 50% |
| 2018 | 17 | 3 | 18% |
| 2019 | 12 | 3 | 25% |
| 2020 | 18 | 5 | 28% |
| 2021 | 34 | 8 | 24% |
| 2022 | 22 | 2 | 9% |
| 2023 | 22 | 3 | 14% |
| 2024 | 13 | 3 | 23% |
| 2025 | 16 | 3 | 19% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| C4 | 40 | 11 | 28% |
| N4 | 39 | 3 | 8% |
| H4 | 31 | 7 | 23% |
| S4 | 20 | 0 | 0% |
| N1 | 19 | 9 | 47% |
| C1 | 9 | 1 | 11% |
| C4, N4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Overtime differential (OD) | MMG025M | DOL | 80 | 80 (100%) | $1.00 | $1.00 |
| Solid waste disposal | MMB173M | DOL | 77 | 77 (100%) | $1.00 | $1.00 |
| Telephone service | MMG010M | DOL | 71 | 71 (100%) | $1.00 | $1.00 |
| Force account | 109006M | DOL | 67 | 67 (100%) | $1.00 | $1.00 |
| Crew coordinator | MMB092M | HR | 66 | 66 (100%) | $135.00 | $135.00 |
| Disposal of regulated material, hazardous | MMG064M | DOL | 63 | 63 (100%) | $1.00 | $1.00 |
| Lane closures | MMB172M | HR | 57 | 49 (86%) | $1.00 | $1.00 |
| Disposal of regulated material | MMG027M | DOL | 33 | 33 (100%) | $1.00 | $1.00 |
| Pollution liability insurance | 152015P | DOL | 54 | 31 (57%) | $9,207.50 | $8,500.00 |
| Traffic cone | 159009M | U | 44 | 26 (59%) | $1.00 | $9.20 |
| Fuel price adjustment | 160004M | DOL | 26 | 26 (100%) | $5,550.00 | $2,700.00 |
| Breakaway barricade | 159003M | U | 46 | 25 (54%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 130 | 95 of 130 |
| Mount Construction Co., Inc. | 95 | 45 of 95 |
| Berto Construction, Inc. | 35 | 15 of 35 |
| Sparwick Contracting, Inc. | 27 | 17 of 27 |
| Colonnelli Brothers, Inc. | 24 | 12 of 24 |
| Ritacco Construction, Inc. | 18 | 10 of 18 |
| Konkus Corporation | 17 | 8 of 17 |
| Ferreira Construction Co., Inc. | 16 | 3 of 16 |
| Midlantic Construction, LLC | 14 | 3 of 14 |
| Anselmi & Decicco, Inc. | 12 | 4 of 12 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 MAR 2026 | 26438 | C4 | MTN Infrastructure Repair Central - 2026 | 3 of 4 | $7,506,401 | +9.0% |
| 19 MAR 2026 | 26437 | N4 | MTN Infrastructure Repair North - 2026 | 3 of 3 | $8,999,000 | +17% |
| 12 FEB 2026 | 25139 | C1 | Route 36, Bridge over Troutman's Creek | 4 of 9 | $9,989,937 | +26% |
| 18 DEC 2025 | 26432 | C4 | MTN STORMWATER FACILITY RES CENTRAL 2026 | 3 of 4 | $9,237,000 | +8.0% |
| 16 DEC 2025 | 26431 | N4 | MTN STORMWATER FACILITY RES NORTH 2026 | 3 of 3 | $13,625,000 | +23% |
| 09 DEC 2025 | 26463 | H4 | MTN Anit-Theft Junction Box Lid Replacement 2026 | 3 of 4 | $1,141,420 | +131% |
| 28 OCT 2025 | 26429 | C4 | MTN STEEL & ALUMINUM REP. CENTRAL- 2026 | 3 of 3 | $7,696,860 | +9.0% |
| 16 OCT 2025 | 26428 | N4 | MTN STEEL & ALUMINUM REP. NORTH- 2026 | 3 of 3 | $10,566,990 | +13% |
| 14 OCT 2025 | 26426 | C4 | MTN CONCRETE STRUC. REP. CENTRAL - 2026 | 3 of 4 | $7,654,375 | +9.0% |
| 09 OCT 2025 | 26425 | N4 | MTN CONCRETE STRUC. REP. NORTH - 2026 | 3 of 3 | $13,911,505 | +13% |
| 26 AUG 2025 | 25122 | C1 | Route 295 Noise Barrier | 5 of 10 | $14,201,909 | +23% |
| 12 AUG 2025 | 25121 | N1 | CR 507 (MAPLE AVE) BRIDGE OVER RT 208 | 1 of 4 | $10,385,375 | Low, 3.0% under the second |
| 29 MAY 2025 | 25108 | C1 | ROUTE 78 WB, BRIDGE OVER TRIBUTARY OF DEAD RIVER | 2 of 8 | $6,998,613 | +14% |
| 01 MAY 2025 | 25102 | N1 | Rt 46 Bridge over Paulins Kill | 2 of 10 | $22,217,000 | +3.0% |
| 15 APR 2025 | 25418 | H4 | Bridge Preventive MTN and Painting 2025-2 | 2 of 4 | $7,231,000 | +4.0% |
| 10 APR 2025 | 25415 | H4 | Bridge Preventive MTN and Painting 2025-1 | 1 of 5 | $8,398,000 | Low, 28% under the second |
| 18 MAR 2025 | 25438 | C4 | MTN Infrastructure Repair Central - 2025 | 1 of 7 | $5,976,000 | Low, 3.0% under the second |
| 13 MAR 2025 | 25437 | N4 | MTN Infrastructure Repair North - 2025 | 3 of 4 | $12,982,000 | +12% |
| 28 JAN 2025 | 24153 | C1 | GROVE AVENUE, BRIDGE OVER PORT READING RAILROAD | 4 of 11 | $11,221,000 | +12% |
| 21 NOV 2024 | 23463 | H4 | Bridge Preventive Maintenance Contract 2023-2 | 4 of 7 | $10,281,000 | +30% |
| 14 NOV 2024 | 25431 | N4 | MTN STORMWATER FACILITY RES NORTH 2025 | 2 of 2 | $19,540,700 | +24% |
| 07 NOV 2024 | 25429 | C4 | MTN STEEL & ALUMINUM REP. CENTRAL- 2025 | 3 of 3 | $10,727,050 | +19% |
| 31 OCT 2024 | 24127 | N1 | NEVI Electric Vehicle Infrastru Deployment Alternative Fuel | 1 of 2 | $20,964,219 | Low, 111% under the second |
| 17 OCT 2024 | 24144 | N1 | Rt 280 EB, Bridges over Passaic River | 2 of 7 | $13,490,676 | +13% |
| 17 SEP 2024 | 25455 | C4 | MTN ORPHAN BRIDGE REP. CENTRAL-2025 | 5 of 5 | $3,108,700 | +63% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.