NJDOT contract 26432 bid tabulation

MTN STORMWATER FACILITY RES CENTRAL 2026. Let by New Jersey DOT on December 18, 2025, Hunterdon, Mercer, Middlesex, Monmouth, Ocean,, C4. 4 bids received; low bid $8,558,502 by Sparwick Contracting, Inc..

Owner
New Jersey DOT
Letting
18 DEC 2025
Pay items
12
Data through
16 APR 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sparwick Contracting, Inc.$8,558,502Low
2Iew Construction Group, Inc.$8,877,597+4.0%
3Joseph M. Sanzari, Inc.$9,237,000+8.0%
4PKF-Mark III, Inc.$10,246,100+20%
NJDOT contract 26432: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sparwick Contracting, Inc.2. Iew Construction Group, Inc.3. Joseph M. Sanzari, Inc.4. PKF-Mark III, Inc.
0001Performance bond and payment bond (151006M)DOL1$1.00$0.01$72,000$40,059
0002Pollution liability insurance (152015P)DOL1$1.00$2.00$7,500.00$1.00
0003Telephone service (MMG010M)DOL2,000$1.00$1.00$1.00$1.00
0004Lane closures (MMB172M)HR4,000$230.00$29.98$1.00$0.01
0005Solid waste disposal (MMB173M)DOL150,000$1.00$1.00$1.00$1.00
0006Disposal of regulated material (MMG027M)DOL5,000$1.00$1.00$1.00$1.00
0007Disposal of regulated material, hazardous (MMG064M)DOL5,000$1.00$1.00$1.00$1.00
0008Adjustment factor , (force account) (MMG095M)PCT3,500,000$1.00$1.00$1.05$1.05
0009Labor crew , stormwater (MMB186M)HR4,000$616.00$810.00$746.00$966.00
0010Labor crew , video inspection and cleaning (MMB186M)HR2,500$512.00$649.27$840.00$909.00
0011Crew coordinator (MMB092M)HR100$125.00$125.00$125.00$125.00
0012Overtime differential (OD) (MMG025M)DOL220,000$1.00$1.00$1.00$1.00
NJDOT contract 26432: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NJDOT's tabulation for this contract. NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

Every contract let that day: NJDOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy