Sparwick Contracting, Inc.: NJDOT bid record
Sparwick Contracting, Inc. submitted 51 bids on New Jersey DOT contracts in the data, from 01 NOV 2018 to 16 APR 2026, and was the low bidder on 17 of them (33%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $118,927,778
- Latest bid
- 16 APR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 0 | 0% |
| 2019 | 1 | 1 | 100% |
| 2020 | 3 | 1 | 33% |
| 2021 | 8 | 2 | 25% |
| 2022 | 3 | 1 | 33% |
| 2023 | 9 | 3 | 33% |
| 2024 | 7 | 3 | 43% |
| 2025 | 13 | 5 | 38% |
| 2026 | 5 | 1 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| C4 | 13 | 5 | 38% |
| N4 | 13 | 5 | 38% |
| N1 | 10 | 5 | 50% |
| H4 | 8 | 1 | 13% |
| S4 | 4 | 0 | 0% |
| C1 | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Excavation, unclassified | 202009P | CY | 66 | 42 (64%) | $70.00 | $78.60 |
| Concrete pier column and cap, HPC | 504026P | CY | 43 | 40 (93%) | $1,115.00 | $2,291.62 |
| Overtime differential (OD) | MMG025M | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Solid waste disposal | MMB173M | DOL | 25 | 25 (100%) | $1.00 | $1.00 |
| Crew coordinator | MMB092M | HR | 25 | 25 (100%) | $125.00 | $135.00 |
| Disposal of regulated material, hazardous | MMG064M | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Telephone service | MMG010M | DOL | 22 | 22 (100%) | $1.00 | $1.00 |
| Disposal of regulated material | MMG027M | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Force account | 109006M | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Tomography | 503051M | U | 18 | 15 (83%) | $500.00 | $825.00 |
| Epoxy waterproofing | 504036P | SY | 31 | 14 (45%) | $50.00 | $72.50 |
| Fuel price adjustment | 160004M | DOL | 13 | 13 (100%) | $1,000.00 | $2,700.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 42 | 18 of 42 |
| Joseph M. Sanzari, Inc. | 27 | 10 of 27 |
| Berto Construction, Inc. | 17 | 11 of 17 |
| Mount Construction Co., Inc. | 12 | 4 of 12 |
| Ritacco Construction, Inc. | 10 | 2 of 10 |
| Ferreira Construction Co., Inc. | 10 | 4 of 10 |
| Konkus Corporation | 9 | 3 of 9 |
| PKF-Mark III, Inc. | 8 | 1 of 8 |
| Colonnelli Brothers, Inc. | 6 | 2 of 6 |
| Anselmi & Decicco, Inc. | 5 | 0 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 APR 2026 | 26453 | S4 | MTN JOC Infrastructure South 2026 | 3 of 3 | $1,418,182 | +23% |
| 14 APR 2026 | 26452 | C4 | MTN JOC Infrastructure Central 2026 | 2 of 3 | $1,200,000 | +4.0% |
| 26 MAR 2026 | 26439 | S4 | MTN Infrastructure Repair South - 2026 | 2 of 3 | $6,386,668 | +6.0% |
| 19 MAR 2026 | 26437 | N4 | MTN Infrastructure Repair North - 2026 | 1 of 3 | $7,665,518 | Low, 10% under the second |
| 19 FEB 2026 | 24474 | H4 | MTN Pier Protection Contract 2024-1 | 4 of 4 | $4,866,644 | +84% |
| 18 DEC 2025 | 26432 | C4 | MTN STORMWATER FACILITY RES CENTRAL 2026 | 1 of 4 | $8,558,502 | Low, 4.0% under the second |
| 16 DEC 2025 | 26431 | N4 | MTN STORMWATER FACILITY RES NORTH 2026 | 2 of 3 | $11,326,002 | +2.0% |
| 09 DEC 2025 | 26463 | H4 | MTN Anit-Theft Junction Box Lid Replacement 2026 | 1 of 4 | $494,006 | Low, 71% under the second |
| 18 NOV 2025 | 26436 | S4 | MTN TIMBER AND UNDERWATER, SOUTH - 2026 | 2 of 2 | $3,753,777 | +7.0% |
| 13 NOV 2025 | 26435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2026 | 2 of 3 | $4,667,032 | +3.0% |
| 06 NOV 2025 | 26434 | N4 | MTN TIMBER AND UNDERWATER, NORTH - 2026 | 2 of 2 | $8,840,242 | +1.0% |
| 28 OCT 2025 | 26429 | C4 | MTN STEEL & ALUMINUM REP. CENTRAL- 2026 | 2 of 3 | $7,163,492 | +1.0% |
| 23 OCT 2025 | 26430 | S4 | MTN STEEL & ALUMINUM REP. SOUTH - 2026 | 2 of 2 | $3,594,752 | +5.0% |
| 16 OCT 2025 | 26428 | N4 | MTN STEEL & ALUMINUM REP. NORTH- 2026 | 2 of 3 | $9,535,002 | +2.0% |
| 01 MAY 2025 | 25102 | N1 | Rt 46 Bridge over Paulins Kill | 1 of 10 | $21,512,826 | Low, 3.0% under the second |
| 13 MAR 2025 | 25437 | N4 | MTN Infrastructure Repair North - 2025 | 1 of 4 | $11,594,746 | Low, 2.0% under the second |
| 28 JAN 2025 | 24153 | C1 | GROVE AVENUE, BRIDGE OVER PORT READING RAILROAD | 1 of 11 | $10,027,724 | Low, 4.0% under the second |
| 07 JAN 2025 | 24472 | H4 | MTN JOC Bridge Repair, Statewide-2024 | 2 of 4 | $4,872,182 | +8.0% |
| 17 DEC 2024 | 25435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2025 | 2 of 4 | $7,276,292 | +4.0% |
| 21 NOV 2024 | 23463 | H4 | Bridge Preventive Maintenance Contract 2023-2 | 6 of 7 | $11,246,638 | +43% |
| 29 OCT 2024 | 25426 | C4 | MTN CONCRETE STRUC. REP. CENTRAL - 2025 | 1 of 4 | $8,536,002 | Low, 4.0% under the second |
| 24 OCT 2024 | 25425 | N4 | MTN CONCRETE STRUC. REP. NORTH - 2025 | 2 of 3 | $16,985,002 | +4.0% |
| 17 OCT 2024 | 24144 | N1 | Rt 280 EB, Bridges over Passaic River | 7 of 7 | $18,250,729 | +53% |
| 23 MAY 2024 | 24458 | C4 | MTN Sign and Sign Structures Repair, Central - 2024 | 1 of 4 | $1,053,852 | Low, 1.0% under the second |
| 21 MAY 2024 | 24457 | N4 | MTN Sign and Sign Structures Repair, North - 2024 | 1 of 4 | $1,086,382 | Low, 3.0% under the second |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.