Konkus Corporation: NJDOT bid record

Konkus Corporation submitted 36 bids on New Jersey DOT contracts in the data, from 21 SEP 2017 to 29 MAY 2025, and was the low bidder on 13 of them (36%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
New Jersey DOT
Low bid volume
$169,530,801
Latest bid
29 MAY 2025
Data through
16 APR 2026
36Bids
13Low bids
36Win rate, percent
+7.0%Median gap to the low bid when not low, 23 bids

By year

YearBidsLow bidsWin rate
201733100%
201922100%
20204250%
20217229%
2022300%
20233133%
202412217%
20252150%
Konkus Corporation, NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
N110660%
C48225%
C16350%
N4600%
H46233%
Konkus Corporation, NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Excavation, unclassified202009PCY3017 (57%)$33.50$78.60
Reinforcement steel, epoxy- coated504006PLB1715 (88%)$1.70$2.52
Fuel price adjustment160004MDOL1414 (100%)$4,600.00$2,700.00
Construction barrier curb159021PLF1613 (81%)$35.00$85.00
Epoxy waterproofing504036PSY1912 (63%)$40.00$72.50
Asphalt price adjustment160007MDOL1111 (100%)$12,200$10,200
Prime coat401036MGAL1010 (100%)$0.01$0.01
Strip seal expansion joint assembly507015PLF168 (50%)$385.50$507.00
Removal of pavement202021PSY138 (62%)$15.00$35.00
Construction layout157004MDOL128 (67%)$27,500$40,000
I-9 soil aggregate203009PCY177 (41%)$55.00$85.00
Subbase301006PCY147 (50%)$55.00$80.00
Konkus Corporation, NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Konkus Corporation, NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
29 MAY 202525108C1ROUTE 78 WB, BRIDGE OVER TRIBUTARY OF DEAD RIVER5 of 8$8,323,923+36%
07 JAN 202524472H4MTN JOC Bridge Repair, Statewide-20241 of 4$4,490,909Low, 8.0% under the second
19 DEC 202424440H4MTN JOC Basin Restoration Contract, Statewide 20242 of 4$3,386,000+4.0%
21 NOV 202423463H4Bridge Preventive Maintenance Contract 2023-25 of 7$10,879,364+38%
06 JUN 202424119N1CR 583 (Princeton Pike), Bridge over Rt 295 & Ramps B & D3 of 9$21,013,263+7.0%
04 JUN 202423476C42nd Re-Adv MTN Guiderail ET&A, Central and South 20235 of 7$1,824,130+11%
04 JUN 202424452C4MTN JOC Infrastructure Repairs, Central-20241 of 3$2,435,940Low, 9.0% under the second
30 MAY 202424451N4MTN JOC Infrastructure Repairs, North-20242 of 4$3,392,792+2.0%
23 MAY 202424458C4MTN Sign and Sign Structures Repair, Central - 20242 of 4$1,062,108+1.0%
21 MAY 202424457N4MTN Sign and Sign Structures Repair, North - 20242 of 4$1,120,448+3.0%
02 MAY 202424437N4MTN Infrastructure Repair North 20242 of 3$18,477,800+1.0%
18 APR 202424438C4MTN Infrastructure Repair Central 20242 of 4$11,123,252+15%
11 APR 202424103N1Rt 15 Corridor, Rockfall Mitigation, Contract A3 of 7$10,512,927+7.0%
11 APR 202424104N1Rt 202, West County Dr (CR 646) to Robbins Rd1 of 4$2,638,733Low, 8.0% under the second
02 NOV 202324426C4MTN CONCRETE STRUC. REP. CENTRAL - 20243 of 4$9,115,090+5.0%
31 OCT 202323157N1Rt. 80, Exit 55, Culvert3 of 5$2,224,928+50%
10 AUG 202323457H4MTN JOC Basin Restoration Contract, Statewide 20231 of 4$2,982,720Low, 2.0% under the second
23 JUN 202222444H4MTN JOC Basin Restoration Contract, Statewide 20225 of 5$1,289,400+13%
24 MAY 202222442C4MTN JOC Infrastructure Repairs, Central-20223 of 4$9,570,000+3.0%
10 MAR 202222446H4Maintenance Orphan Bridge Repair Contract 2022-12 of 3$4,197,360+8.0%
16 DEC 202122418N4MTN Infrastructure Repair Morris-20222 of 3$2,766,725+2.0%
16 SEP 202121136C1BROADWAY AVE. (CR 516), OVER ROUTE 351 of 4$4,990,852Low, 0.0% under the second
10 JUN 202121125C1River Road (CR 622) Bridge over Route 2872 of 5$14,861,767+10%
25 MAY 202121451C4MTN JOC Infrastructure Repairs, Central-20211 of 6$7,018,000Low, 1.0% under the second
20 MAY 202121450N4MTN JOC Infrastructure Repairs, North-20212 of 5$7,257,250+14%
Konkus Corporation: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy