Konkus Corporation: NJDOT bid record
Konkus Corporation submitted 36 bids on New Jersey DOT contracts in the data, from 21 SEP 2017 to 29 MAY 2025, and was the low bidder on 13 of them (36%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $169,530,801
- Latest bid
- 29 MAY 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 3 | 3 | 100% |
| 2019 | 2 | 2 | 100% |
| 2020 | 4 | 2 | 50% |
| 2021 | 7 | 2 | 29% |
| 2022 | 3 | 0 | 0% |
| 2023 | 3 | 1 | 33% |
| 2024 | 12 | 2 | 17% |
| 2025 | 2 | 1 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 10 | 6 | 60% |
| C4 | 8 | 2 | 25% |
| C1 | 6 | 3 | 50% |
| N4 | 6 | 0 | 0% |
| H4 | 6 | 2 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Excavation, unclassified | 202009P | CY | 30 | 17 (57%) | $33.50 | $78.60 |
| Reinforcement steel, epoxy- coated | 504006P | LB | 17 | 15 (88%) | $1.70 | $2.52 |
| Fuel price adjustment | 160004M | DOL | 14 | 14 (100%) | $4,600.00 | $2,700.00 |
| Construction barrier curb | 159021P | LF | 16 | 13 (81%) | $35.00 | $85.00 |
| Epoxy waterproofing | 504036P | SY | 19 | 12 (63%) | $40.00 | $72.50 |
| Asphalt price adjustment | 160007M | DOL | 11 | 11 (100%) | $12,200 | $10,200 |
| Prime coat | 401036M | GAL | 10 | 10 (100%) | $0.01 | $0.01 |
| Strip seal expansion joint assembly | 507015P | LF | 16 | 8 (50%) | $385.50 | $507.00 |
| Removal of pavement | 202021P | SY | 13 | 8 (62%) | $15.00 | $35.00 |
| Construction layout | 157004M | DOL | 12 | 8 (67%) | $27,500 | $40,000 |
| I-9 soil aggregate | 203009P | CY | 17 | 7 (41%) | $55.00 | $85.00 |
| Subbase | 301006P | CY | 14 | 7 (50%) | $55.00 | $80.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 30 | 6 of 30 |
| Joseph M. Sanzari, Inc. | 17 | 9 of 17 |
| Anselmi & Decicco, Inc. | 9 | 2 of 9 |
| Sparwick Contracting, Inc. | 9 | 6 of 9 |
| Ferreira Construction Co., Inc. | 8 | 2 of 8 |
| Colonnelli Brothers, Inc. | 8 | 4 of 8 |
| Ritacco Construction, Inc. | 7 | 2 of 7 |
| Carbro Constructors Corp. | 7 | 0 of 7 |
| Crisdel Group, Inc. | 7 | 0 of 7 |
| Mount Construction Co., Inc. | 7 | 1 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 MAY 2025 | 25108 | C1 | ROUTE 78 WB, BRIDGE OVER TRIBUTARY OF DEAD RIVER | 5 of 8 | $8,323,923 | +36% |
| 07 JAN 2025 | 24472 | H4 | MTN JOC Bridge Repair, Statewide-2024 | 1 of 4 | $4,490,909 | Low, 8.0% under the second |
| 19 DEC 2024 | 24440 | H4 | MTN JOC Basin Restoration Contract, Statewide 2024 | 2 of 4 | $3,386,000 | +4.0% |
| 21 NOV 2024 | 23463 | H4 | Bridge Preventive Maintenance Contract 2023-2 | 5 of 7 | $10,879,364 | +38% |
| 06 JUN 2024 | 24119 | N1 | CR 583 (Princeton Pike), Bridge over Rt 295 & Ramps B & D | 3 of 9 | $21,013,263 | +7.0% |
| 04 JUN 2024 | 23476 | C4 | 2nd Re-Adv MTN Guiderail ET&A, Central and South 2023 | 5 of 7 | $1,824,130 | +11% |
| 04 JUN 2024 | 24452 | C4 | MTN JOC Infrastructure Repairs, Central-2024 | 1 of 3 | $2,435,940 | Low, 9.0% under the second |
| 30 MAY 2024 | 24451 | N4 | MTN JOC Infrastructure Repairs, North-2024 | 2 of 4 | $3,392,792 | +2.0% |
| 23 MAY 2024 | 24458 | C4 | MTN Sign and Sign Structures Repair, Central - 2024 | 2 of 4 | $1,062,108 | +1.0% |
| 21 MAY 2024 | 24457 | N4 | MTN Sign and Sign Structures Repair, North - 2024 | 2 of 4 | $1,120,448 | +3.0% |
| 02 MAY 2024 | 24437 | N4 | MTN Infrastructure Repair North 2024 | 2 of 3 | $18,477,800 | +1.0% |
| 18 APR 2024 | 24438 | C4 | MTN Infrastructure Repair Central 2024 | 2 of 4 | $11,123,252 | +15% |
| 11 APR 2024 | 24103 | N1 | Rt 15 Corridor, Rockfall Mitigation, Contract A | 3 of 7 | $10,512,927 | +7.0% |
| 11 APR 2024 | 24104 | N1 | Rt 202, West County Dr (CR 646) to Robbins Rd | 1 of 4 | $2,638,733 | Low, 8.0% under the second |
| 02 NOV 2023 | 24426 | C4 | MTN CONCRETE STRUC. REP. CENTRAL - 2024 | 3 of 4 | $9,115,090 | +5.0% |
| 31 OCT 2023 | 23157 | N1 | Rt. 80, Exit 55, Culvert | 3 of 5 | $2,224,928 | +50% |
| 10 AUG 2023 | 23457 | H4 | MTN JOC Basin Restoration Contract, Statewide 2023 | 1 of 4 | $2,982,720 | Low, 2.0% under the second |
| 23 JUN 2022 | 22444 | H4 | MTN JOC Basin Restoration Contract, Statewide 2022 | 5 of 5 | $1,289,400 | +13% |
| 24 MAY 2022 | 22442 | C4 | MTN JOC Infrastructure Repairs, Central-2022 | 3 of 4 | $9,570,000 | +3.0% |
| 10 MAR 2022 | 22446 | H4 | Maintenance Orphan Bridge Repair Contract 2022-1 | 2 of 3 | $4,197,360 | +8.0% |
| 16 DEC 2021 | 22418 | N4 | MTN Infrastructure Repair Morris-2022 | 2 of 3 | $2,766,725 | +2.0% |
| 16 SEP 2021 | 21136 | C1 | BROADWAY AVE. (CR 516), OVER ROUTE 35 | 1 of 4 | $4,990,852 | Low, 0.0% under the second |
| 10 JUN 2021 | 21125 | C1 | River Road (CR 622) Bridge over Route 287 | 2 of 5 | $14,861,767 | +10% |
| 25 MAY 2021 | 21451 | C4 | MTN JOC Infrastructure Repairs, Central-2021 | 1 of 6 | $7,018,000 | Low, 1.0% under the second |
| 20 MAY 2021 | 21450 | N4 | MTN JOC Infrastructure Repairs, North-2021 | 2 of 5 | $7,257,250 | +14% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.