Ferreira Construction Co., Inc.: NJDOT bid record
Ferreira Construction Co., Inc. submitted 40 bids on New Jersey DOT contracts in the data, from 08 AUG 2017 to 29 MAY 2025, and was the low bidder on 5 of them (13%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $53,316,900
- Latest bid
- 29 MAY 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 2 | 0 | 0% |
| 2018 | 3 | 0 | 0% |
| 2019 | 7 | 1 | 14% |
| 2020 | 8 | 0 | 0% |
| 2021 | 7 | 2 | 29% |
| 2022 | 1 | 0 | 0% |
| 2023 | 3 | 0 | 0% |
| 2024 | 4 | 2 | 50% |
| 2025 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 19 | 4 | 21% |
| C1 | 7 | 1 | 14% |
| C4 | 5 | 0 | 0% |
| N4 | 4 | 0 | 0% |
| H4 | 3 | 0 | 0% |
| S1 | 1 | 0 | 0% |
| S4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 25 | 25 (100%) | $2,700.00 | $2,700.00 |
| Asphalt price adjustment | 160007M | DOL | 22 | 22 (100%) | $6,500.00 | $10,200 |
| Temporary sheeting | 501003P | SF | 61 | 21 (34%) | $50.00 | $18.06 |
| Reinforcement steel, epoxy- coated | 504006P | LB | 69 | 20 (29%) | $3.32 | $2.52 |
| Concrete pier column and cap, HPC | 504026P | CY | 46 | 17 (37%) | $1,800.00 | $2,291.62 |
| Crosshole sonic logging | 503012M | U | 31 | 11 (35%) | $3,152.00 | $2,500.00 |
| Overtime differential (OD) | MMG025M | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Solid waste disposal | MMB173M | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Crew coordinator | MMB092M | HR | 11 | 11 (100%) | $125.00 | $135.00 |
| Telephone service | MMG010M | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Straw mulching | 809003M | SY | 25 | 9 (36%) | $1.15 | $1.00 |
| Drilled shaft for sign structure foundation | 503055M | LF | 9 | 9 (100%) | $1,200.00 | $1,037.54 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 28 | 20 of 28 |
| Joseph M. Sanzari, Inc. | 16 | 13 of 16 |
| Anselmi & Decicco, Inc. | 13 | 7 of 13 |
| Mount Construction Co., Inc. | 11 | 4 of 11 |
| Ritacco Construction, Inc. | 11 | 7 of 11 |
| Union Paving & Construction Co., Inc. | 10 | 8 of 10 |
| Sparwick Contracting, Inc. | 10 | 6 of 10 |
| Midlantic Construction, LLC | 9 | 5 of 9 |
| Berto Construction, Inc. | 9 | 5 of 9 |
| Konkus Corporation | 8 | 6 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 MAY 2025 | 25108 | C1 | ROUTE 78 WB, BRIDGE OVER TRIBUTARY OF DEAD RIVER | 7 of 8 | $8,899,472 | +45% |
| 20 MAR 2025 | 25439 | S4 | MTN Infrastructure Repair South - 2025 | 4 of 4 | $4,886,235 | +19% |
| 18 MAR 2025 | 25438 | C4 | MTN Infrastructure Repair Central - 2025 | 5 of 7 | $6,854,648 | +15% |
| 13 MAR 2025 | 25437 | N4 | MTN Infrastructure Repair North - 2025 | 4 of 4 | $14,923,472 | +29% |
| 28 JAN 2025 | 24153 | C1 | GROVE AVENUE, BRIDGE OVER PORT READING RAILROAD | 11 of 11 | $14,472,825 | +44% |
| 17 OCT 2024 | 24144 | N1 | Rt 280 EB, Bridges over Passaic River | 1 of 7 | $11,957,472 | Low, 13% under the second |
| 10 SEP 2024 | 24134 | N1 | North Munn Ave, Bridge Over Rt. 280 | 1 of 6 | $20,338,472 | Low, 5.0% under the second |
| 06 JUN 2024 | 24119 | N1 | CR 583 (Princeton Pike), Bridge over Rt 295 & Ramps B & D | 4 of 9 | $22,054,472 | +12% |
| 11 APR 2024 | 24103 | N1 | Rt 15 Corridor, Rockfall Mitigation, Contract A | 2 of 7 | $10,100,778 | +3.0% |
| 12 OCT 2023 | 23132 | N1 | Route 23 NB Bridge Over Pequannock River Bridge Improvements | 5 of 5 | $9,472,849 | +29% |
| 12 OCT 2023 | 23148 | N1 | Sign Structure Replacement Contract 2016-3 | 4 of 4 | $17,411,472 | +40% |
| 08 JUN 2023 | 23115 | N1 | Squirrelwood Road Bridge over Route 80 | 3 of 3 | $13,330,898 | +9.0% |
| 07 JUN 2022 | 22119 | C1 | Somerville Road Bridges Over Route 78 | 3 of 5 | $8,781,781 | +41% |
| 27 MAY 2021 | 21109 | N1 | Pulaski Contract 9A | 3 of 3 | $84,287,210 | +11% |
| 27 MAY 2021 | 21121 | N1 | Rt 22 Rockfall Mitigation, Phillipsburg | 1 of 6 | $4,997,691 | Low, 23% under the second |
| 06 APR 2021 | 21103 | N1 | Sign Structure Replacement Contract 2021-1 | 5 of 5 | $13,803,000 | +48% |
| 18 MAR 2021 | 21105 | N1 | Route 280 Rockfall Mitigation, West Orange Township | 4 of 7 | $6,823,823 | +22% |
| 23 FEB 2021 | 20147 | C1 | Rt 78 WB, Bridge over North Branch of Raritan River | 1 of 10 | $6,947,188 | Low, 0.0% under the second |
| 14 JAN 2021 | 21443 | N4 | MTN Infrastructure Repair Sussex and Warren-2021 | 5 of 5 | $2,989,997 | +9.0% |
| 12 JAN 2021 | 21442 | C4 | MTN Infrastructure Repair Middlesex-2021 | 3 of 5 | $3,351,451 | +21% |
| 08 DEC 2020 | 21419 | C4 | MTN CONCRETE STRUC. REP. CENTRAL 2021 | 3 of 6 | $8,995,701 | +9.0% |
| 03 DEC 2020 | 21418 | N4 | MTN CONCRETE STRUC. REP. NORTH - 2021 | 4 of 7 | $19,326,001 | +7.0% |
| 12 NOV 2020 | 20133 | N1 | I-80 Rockfall Mitigation | 4 of 6 | $3,823,431 | +19% |
| 27 OCT 2020 | 21413 | C4 | MTN STRUC. STEEL & ALUMNM REP. CENTRAL - 2021 | 3 of 4 | $3,549,126 | +15% |
| 22 OCT 2020 | 21412 | N4 | MTN STRUC. STEEL & ALUMNM REP. NORTH - 2021 | 4 of 4 | $8,243,501 | +18% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.