Union Paving & Construction Co., Inc.: NJDOT bid record
Union Paving & Construction Co., Inc. submitted 54 bids on New Jersey DOT contracts in the data, from 05 OCT 2017 to 18 NOV 2025, and was the low bidder on 16 of them (30%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $718,864,779
- Latest bid
- 18 NOV 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 2 | 1 | 50% |
| 2018 | 2 | 0 | 0% |
| 2019 | 8 | 2 | 25% |
| 2020 | 4 | 1 | 25% |
| 2021 | 5 | 1 | 20% |
| 2022 | 11 | 3 | 27% |
| 2023 | 10 | 4 | 40% |
| 2024 | 6 | 3 | 50% |
| 2025 | 6 | 1 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 41 | 12 | 29% |
| C1 | 8 | 1 | 13% |
| H4 | 4 | 3 | 75% |
| H1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 50 | 50 (100%) | $18,150 | $2,700.00 |
| Reinforcement steel, epoxy- coated | 504006P | LB | 139 | 49 (35%) | $2.10 | $2.52 |
| Asphalt price adjustment | 160007M | DOL | 47 | 47 (100%) | $35,500 | $10,200 |
| Excavation, unclassified | 202009P | CY | 115 | 38 (33%) | $70.00 | $78.60 |
| Prime coat | 401036M | GAL | 37 | 37 (100%) | $0.01 | $0.01 |
| 3" rigid metallic conduit | 701021P | LF | 82 | 33 (40%) | $55.00 | $65.00 |
| Concrete bridge parapet, HPC | 507039P | LF | 58 | 28 (48%) | $315.00 | $350.00 |
| 9" X 16" concrete vertical curb | 607018P | LF | 46 | 25 (54%) | $40.00 | $60.00 |
| Pollution liability insurance | 152015P | DOL | 50 | 20 (40%) | $15,000 | $8,500.00 |
| Epoxy waterproofing | 504036P | SY | 44 | 20 (45%) | $57.50 | $72.50 |
| 2" rigid metallic conduit | 701015P | LF | 41 | 20 (49%) | $55.00 | $50.57 |
| Concrete footing | 504015P | CY | 74 | 18 (24%) | $750.00 | $785.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anselmi & Decicco, Inc. | 22 | 9 of 22 |
| Iew Construction Group, Inc. | 20 | 7 of 20 |
| Crisdel Group, Inc. | 14 | 2 of 14 |
| Carbro Constructors Corp. | 13 | 5 of 13 |
| Ferreira Construction Co., Inc. | 10 | 2 of 10 |
| Ritacco Construction, Inc. | 10 | 7 of 10 |
| Berto Construction, Inc. | 9 | 5 of 9 |
| B Anthony Construction Corp J/V A. Servidone Inc | 8 | 0 of 8 |
| Joseph M. Sanzari, Inc. | 8 | 5 of 8 |
| New Prince Concrete Construction Co., Inc. | 7 | 4 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 NOV 2025 | 25128 | N1 | Route 4 Hackensack River Bridge | 3 of 7 | $181,887,759 | +18% |
| 30 OCT 2025 | 25130 | N1 | Rt 15 NB, Bridge over Abandoned Mount Hope Mineral Railroad | 1 of 4 | $23,239,369 | Low, 29% under the second |
| 07 OCT 2025 | 25126 | C1 | RT 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS | 2 of 4 | $11,757,205 | +3.0% |
| 29 MAY 2025 | 25108 | C1 | ROUTE 78 WB, BRIDGE OVER TRIBUTARY OF DEAD RIVER | 4 of 8 | $7,962,994 | +30% |
| 01 MAY 2025 | 25102 | N1 | Rt 46 Bridge over Paulins Kill | 5 of 10 | $25,559,012 | +19% |
| 28 JAN 2025 | 24153 | C1 | GROVE AVENUE, BRIDGE OVER PORT READING RAILROAD | 3 of 11 | $10,428,221 | +4.0% |
| 24 OCT 2024 | 24133 | N1 | Route U.S. 1&9 (Pulaski Skyway) Contract 6A | 1 of 4 | $197,670,784 | Low, 9.0% under the second |
| 17 OCT 2024 | 24144 | N1 | Rt 280 EB, Bridges over Passaic River | 4 of 7 | $14,652,779 | +23% |
| 14 MAY 2024 | 24463 | H4 | Construct Taxiway (Phase 2) | 3 of 3 | $1,770,000 | +43% |
| 11 APR 2024 | 24103 | N1 | Rt 15 Corridor, Rockfall Mitigation, Contract A | 1 of 7 | $9,830,211 | Low, 3.0% under the second |
| 04 APR 2024 | 24101 | N1 | Readvertisement - Route 7 Kearny, Drainage Improvement | 2 of 3 | $96,633,131 | +1.0% |
| 04 APR 2024 | 24462 | H4 | TRANSIENT APRON RECONSTRUCTION (PHASE 2) | 1 of 2 | $739,655 | Low, 21% under the second |
| 26 OCT 2023 | 23126 | N1 | PORTWAY, FISH HOUSE RD PENNSYLVANIA AVE CR 659 IMPROVEMENTS | 1 of 4 | $82,402,707 | Low, 9.0% under the second |
| 07 SEP 2023 | 23131 | N1 | Route 23, Bridge over Pequannock River / Hamburg Turnpike | 6 of 6 | $93,049,466 | +19% |
| 10 AUG 2023 | 23129 | N1 | Route 80 Bridges Over Howard Blvd. (CR 615) | 1 of 3 | $65,462,201 | Low, 5.0% under the second |
| 13 JUN 2023 | 23122 | N1 | Route 7, Mill St. (CR 672) to Park Ave. (CR 646) | 2 of 7 | $21,925,225 | +10% |
| 06 JUN 2023 | 23111 | N1 | RT 1&9T/New Rd, St. Paul's Ave to Van Keuren Ave Contract #2 | 2 of 4 | $77,938,531 | +2.0% |
| 02 MAY 2023 | 23113 | N1 | Route 46, Route 80 to Walnut Road | 2 of 4 | $15,914,616 | +10% |
| 04 APR 2023 | 22153 | N1 | Route 23, Alexander Road to Maple Lake Road | 4 of 6 | $16,055,465 | +17% |
| 02 MAR 2023 | 22469 | H4 | TRANSIENT APRON RECONSTRUCTION (PHASE 1) | 1 of 4 | $724,990 | Low, 1.0% under the second |
| 02 MAR 2023 | 22470 | H4 | Construct Taxiway (Phase 1) | 1 of 3 | $1,903,170 | Low, 27% under the second |
| 23 FEB 2023 | 22158 | N1 | RT 280 WB RAMP OVER 1ST & ORANGE ST, SUBWAY & NJ TRANSIT | 3 of 5 | $36,192,927 | +14% |
| 03 NOV 2022 | 22141 | N1 | RT 46, RT 287 TO RT 23 (POMPTON AVENUE), ITS (CENTRAL) | 3 of 3 | $23,862,757 | +11% |
| 01 NOV 2022 | 22148 | N1 | Route 46, Route 23 (Pompton Ave.) to Route 20, ITS | 2 of 4 | $13,181,225 | +3.0% |
| 20 OCT 2022 | 22152 | N1 | Rt 57-182-46 Hackettstown Mobility Improvements | 3 of 4 | $2,871,201 | +15% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.