New Prince Concrete Construction Co., Inc.: NJDOT bid record
New Prince Concrete Construction Co., Inc. submitted 24 bids on New Jersey DOT contracts in the data, from 30 NOV 2017 to 07 OCT 2025, and was the low bidder on 6 of them (25%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $87,492,049
- Latest bid
- 07 OCT 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 2 | 1 | 50% |
| 2018 | 1 | 0 | 0% |
| 2019 | 6 | 1 | 17% |
| 2020 | 2 | 0 | 0% |
| 2021 | 6 | 1 | 17% |
| 2022 | 2 | 2 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 15 | 4 | 27% |
| C1 | 8 | 2 | 25% |
| S1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 22 | 22 (100%) | $12,300 | $2,700.00 |
| Asphalt price adjustment | 160007M | DOL | 21 | 21 (100%) | $21,900 | $10,200 |
| Prime coat | 401036M | GAL | 16 | 15 (94%) | $0.01 | $0.01 |
| Trainees | 153011M | HR | 15 | 14 (93%) | $1.00 | $1.00 |
| HMA milling, 3" or less | 401009P | SY | 27 | 11 (41%) | $7.00 | $6.85 |
| Hot mix asphalt 25 M 64 base course | 401099M | T | 18 | 11 (61%) | $93.50 | $125.00 |
| Hot mix asphalt driveway, 6" thick | 606039P | SY | 12 | 10 (83%) | $43.50 | $80.00 |
| Excavation, unclassified | 202009P | CY | 38 | 8 (21%) | $45.00 | $78.60 |
| Inlet filter type 2, 2' X 4' | 158030M | U | 20 | 8 (40%) | $100.00 | $120.00 |
| Hot mix asphalt 12.5 M 64 surface course | 401054M | T | 15 | 8 (53%) | $105.00 | $120.00 |
| Nonvegetative surface, hot mix asphalt | 608003P | SY | 11 | 8 (73%) | $39.00 | $50.00 |
| Drum | 159006M | U | 22 | 7 (32%) | $75.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Berto Construction, Inc. | 10 | 4 of 10 |
| Green Construction, Inc. | 8 | 3 of 8 |
| Union Paving & Construction Co., Inc. | 7 | 3 of 7 |
| Crisdel Group, Inc. | 7 | 2 of 7 |
| Anselmi & Decicco, Inc. | 6 | 2 of 6 |
| Joseph M. Sanzari, Inc. | 6 | 4 of 6 |
| Earle Asphalt Company | 5 | 4 of 5 |
| Carbro Constructors Corp. | 4 | 2 of 4 |
| Iew Construction Group, Inc. | 4 | 1 of 4 |
| Black Rock Enterprises, LLC | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2025 | 25126 | C1 | RT 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS | 1 of 4 | $11,398,293 | Low, 3.0% under the second |
| 24 JUN 2025 | 25117 | N1 | Passaic Avenue, Ward Avenue | 2 of 2 | $2,065,703 | +4.0% |
| 10 APR 2025 | 25105 | N1 | Re-advertisement of Route 15, Bridge over Paulins Kill | 3 of 3 | $6,184,338 | +33% |
| 04 JUN 2024 | 24107 | C1 | Route 66, Jumping Brook Road to Bowne Road / Wayside Road | 5 of 8 | $49,592,630 | +27% |
| 31 OCT 2023 | 23157 | N1 | Rt. 80, Exit 55, Culvert | 4 of 5 | $2,226,584 | +50% |
| 24 MAY 2022 | 22117 | N1 | Route 20 Paterson Cost Estimate | 1 of 3 | $48,474,528 | Low, 0.0% under the second |
| 12 MAY 2022 | 22123 | N1 | RT 208, WYCKOFF TWP., BERGEN COUNTY, CULVERT REPLACEMENT | 1 of 7 | $3,985,135 | Low, 7.0% under the second |
| 19 OCT 2021 | 21135 | N1 | ROUTE 23 HARDYSTON TOWNSHIP IMPROVEMENTS | 2 of 3 | $9,754,691 | 0.0% |
| 14 OCT 2021 | 21137 | S1 | ADA North, Contract 1; Route 46 ADA Ramps | 3 of 4 | $2,792,009 | +43% |
| 03 JUN 2021 | 21120 | N1 | ADA NORTH, CONTRACT 4 | 2 of 3 | $5,244,204 | +1.0% |
| 20 MAY 2021 | 21119 | C1 | Route 46, Bergen Blvd to Main St | 2 of 3 | $7,851,660 | +5.0% |
| 29 APR 2021 | 21110 | N1 | Route 4, River Drive to Tunbridge Road | 2 of 3 | $9,257,212 | +6.0% |
| 07 JAN 2021 | 20144 | N1 | ADA North, Contract 5; Rt 17 - Terrace Ave To W Saddle River | 1 of 9 | $2,332,505 | Low, 5.0% under the second |
| 15 OCT 2020 | 20131 | N1 | Route 206 Doctors Way to Valley Road | 6 of 9 | $52,716,712 | +26% |
| 09 JUL 2020 | 20127 | N1 | NJ Route 19 - Colfax Avenue (CR 609) to Marshall Street | 6 of 7 | $9,170,093 | +16% |
| 14 NOV 2019 | 19142 | N1 | RT 22 BLOY STREET TO LIBERTY AVENUE | 3 of 4 | $11,509,896 | +7.0% |
| 29 AUG 2019 | 19134 | N1 | Route 10 WB, Route 287 to Jefferson Road | 3 of 5 | $6,142,795 | +37% |
| 20 JUN 2019 | 19130 | C1 | ROUTE 34, BRIDGE OVER FORMER FREEHOLD AND JAMESBURG RAILROAD | 4 of 8 | $12,539,556 | +30% |
| 30 MAY 2019 | 19117 | N1 | Old Newark Pompton Turnpike (CR 683) over Route 202 | 3 of 5 | $7,315,948 | +15% |
| 16 MAY 2019 | 19127 | C1 | Route 27 ADA Ramps, Evergreen St to Elizabeth River | 3 of 5 | $9,557,956 | +12% |
| 02 MAY 2019 | 19108 | N1 | Route 22 Westbound Vicinity of Vauxhall Road | 1 of 7 | $2,164,826 | Low, 10% under the second |
| 09 JAN 2018 | 17139 | C1 | ROUTE 1 SOUTHBOUND FROM NASSAU PARK BOULVEVARD | 4 of 5 | $17,262,469 | +23% |
| 14 DEC 2017 | 17151 | C1 | RE-ADVERTISEMENT OF ROUTE 71,MAIN AVE TO CEDAR AVE, PAVEMENT | 1 of 3 | $19,136,763 | Low, 2.0% under the second |
| 30 NOV 2017 | 17144 | C1 | ROUTE US 206 BYPASS - CONTRACT B SEC 14A & 15A | 10 of 13 | $48,201,647 | +32% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.