Iew Construction Group, Inc.: NJDOT bid record
Iew Construction Group, Inc. submitted 305 bids on New Jersey DOT contracts in the data, from 13 JUL 2017 to 16 APR 2026, and was the low bidder on 125 of them (41%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $1,088,367,334
- Latest bid
- 16 APR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 9 | 0 | 0% |
| 2018 | 53 | 15 | 28% |
| 2019 | 33 | 12 | 36% |
| 2020 | 34 | 12 | 35% |
| 2021 | 41 | 18 | 44% |
| 2022 | 30 | 17 | 57% |
| 2023 | 37 | 21 | 57% |
| 2024 | 33 | 15 | 45% |
| 2025 | 28 | 12 | 43% |
| 2026 | 7 | 3 | 43% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| C4 | 61 | 23 | 38% |
| S4 | 61 | 37 | 61% |
| N4 | 61 | 39 | 64% |
| H4 | 48 | 20 | 42% |
| N1 | 40 | 6 | 15% |
| C1 | 18 | 0 | 0% |
| S1 | 13 | 0 | 0% |
| N1, N4 | 1 | 0 | 0% |
| C4, N4 | 1 | 0 | 0% |
| H1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Overtime differential (OD) | MMG025M | DOL | 149 | 149 (100%) | $1.00 | $1.00 |
| Solid waste disposal | MMB173M | DOL | 136 | 136 (100%) | $1.00 | $1.00 |
| Telephone service | MMG010M | DOL | 134 | 134 (100%) | $1.00 | $1.00 |
| Force account | 109006M | DOL | 125 | 125 (100%) | $1.00 | $1.00 |
| Crew coordinator | MMB092M | HR | 120 | 120 (100%) | $135.00 | $135.00 |
| Disposal of regulated material, hazardous | MMG064M | DOL | 105 | 105 (100%) | $1.00 | $1.00 |
| Fuel price adjustment | 160004M | DOL | 64 | 64 (100%) | $2,700.00 | $2,700.00 |
| Performance bond and payment bond | 151006M | DOL | 144 | 59 (41%) | $35,000 | $32,468 |
| Disposal of regulated material | MMG027M | DOL | 56 | 56 (100%) | $1.00 | $1.00 |
| Asphalt price adjustment | 160007M | DOL | 48 | 48 (100%) | $7,850.00 | $10,200 |
| Worker, type "A" | MMG054M | HR | 75 | 43 (57%) | $88.12 | $100.00 |
| Temporary sheeting | 501003P | SF | 160 | 42 (26%) | $48.71 | $18.06 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mount Construction Co., Inc. | 132 | 35 of 132 |
| Joseph M. Sanzari, Inc. | 130 | 35 of 130 |
| Sparwick Contracting, Inc. | 42 | 24 of 42 |
| Anselmi & Decicco, Inc. | 38 | 23 of 38 |
| South State, Inc. | 35 | 26 of 35 |
| Berto Construction, Inc. | 35 | 18 of 35 |
| Midlantic Construction, LLC | 35 | 11 of 35 |
| Colonnelli Brothers, Inc. | 32 | 19 of 32 |
| Konkus Corporation | 30 | 24 of 30 |
| Ritacco Construction, Inc. | 30 | 22 of 30 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 APR 2026 | 26453 | S4 | MTN JOC Infrastructure South 2026 | 1 of 3 | $1,149,955 | Low, 15% under the second |
| 14 APR 2026 | 26424 | H4 | MTN MVB & TUNNEL REP 2026 | 1 of 1 | $9,620,849 | Low |
| 14 APR 2026 | 26452 | C4 | MTN JOC Infrastructure Central 2026 | 3 of 3 | $1,469,318 | +27% |
| 09 APR 2026 | 26451 | N4 | MTN JOC Infrastructure North 2026 | 2 of 2 | $1,416,136 | +46% |
| 26 MAR 2026 | 26439 | S4 | MTN Infrastructure Repair South - 2026 | 1 of 3 | $5,999,305 | Low, 6.0% under the second |
| 24 MAR 2026 | 26438 | C4 | MTN Infrastructure Repair Central - 2026 | 2 of 4 | $7,352,263 | +7.0% |
| 19 MAR 2026 | 26437 | N4 | MTN Infrastructure Repair North - 2026 | 2 of 3 | $8,429,231 | +10% |
| 23 DEC 2025 | 26433 | S4 | MTN STORMWATER FACILITY RES SOUTH 2026 | 2 of 2 | $5,330,302 | +3.0% |
| 18 DEC 2025 | 26432 | C4 | MTN STORMWATER FACILITY RES CENTRAL 2026 | 2 of 4 | $8,877,597 | +4.0% |
| 16 DEC 2025 | 26431 | N4 | MTN STORMWATER FACILITY RES NORTH 2026 | 1 of 3 | $11,097,631 | Low, 2.0% under the second |
| 09 DEC 2025 | 26463 | H4 | MTN Anit-Theft Junction Box Lid Replacement 2026 | 2 of 4 | $843,571 | +71% |
| 20 NOV 2025 | 25422 | H4 | MTN JOC Basin Restoration Contract, Statewide 2025 | 2 of 3 | $3,355,985 | +30% |
| 18 NOV 2025 | 25128 | N1 | Route 4 Hackensack River Bridge | 1 of 7 | $154,367,605 | Low, 7.0% under the second |
| 18 NOV 2025 | 26436 | S4 | MTN TIMBER AND UNDERWATER, SOUTH - 2026 | 1 of 2 | $3,515,811 | Low, 7.0% under the second |
| 13 NOV 2025 | 26435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2026 | 1 of 3 | $4,517,855 | Low, 3.0% under the second |
| 06 NOV 2025 | 26434 | N4 | MTN TIMBER AND UNDERWATER, NORTH - 2026 | 1 of 2 | $8,731,863 | Low, 1.0% under the second |
| 28 OCT 2025 | 26429 | C4 | MTN STEEL & ALUMINUM REP. CENTRAL- 2026 | 1 of 3 | $7,079,180 | Low, 1.0% under the second |
| 23 OCT 2025 | 26430 | S4 | MTN STEEL & ALUMINUM REP. SOUTH - 2026 | 1 of 2 | $3,417,435 | Low, 5.0% under the second |
| 16 OCT 2025 | 26427 | S4 | MTN CONCRETE STRUC. REP. SOUTH - 2026 | 2 of 2 | $3,830,491 | +10% |
| 16 OCT 2025 | 26428 | N4 | MTN STEEL & ALUMINUM REP. NORTH- 2026 | 1 of 3 | $9,326,971 | Low, 2.0% under the second |
| 14 OCT 2025 | 26426 | C4 | MTN CONCRETE STRUC. REP. CENTRAL - 2026 | 4 of 4 | $7,782,775 | +11% |
| 09 OCT 2025 | 26425 | N4 | MTN CONCRETE STRUC. REP. NORTH - 2026 | 1 of 3 | $12,264,153 | Low, 2.0% under the second |
| 26 AUG 2025 | 25122 | C1 | Route 295 Noise Barrier | 3 of 10 | $13,851,455 | +20% |
| 12 AUG 2025 | 25121 | N1 | CR 507 (MAPLE AVE) BRIDGE OVER RT 208 | 4 of 4 | $12,619,238 | +22% |
| 12 JUN 2025 | 25424 | H4 | MTN MVB & TUNNEL REP 2025 | 1 of 1 | $12,502,811 | Low |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.