NJDOT contract 25122 bid tabulation
Route 295 Noise Barrier. Let by New Jersey DOT on August 26, 2025, Mercer, C1. 10 bids received; low bid $11,528,000 by PKF-Mark III, Inc..
- Owner
- New Jersey DOT
- Letting
- 26 AUG 2025
- Pay items
- 134
- Data through
- 16 APR 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | PKF-Mark III, Inc. | $11,528,000 | Low |
| 2 | South State, Inc. | $13,558,884 | +18% |
| 3 | Iew Construction Group, Inc. | $13,851,455 | +20% |
| 4 | Ritacco Construction, Inc. | $14,110,000 | +22% |
| 5 | Joseph M. Sanzari, Inc. | $14,201,909 | +23% |
| 6 | Earle Asphalt Company | $15,165,713 | +32% |
| 7 | Anselmi & Decicco, Inc. | $15,531,775 | +35% |
| 8 | Black Rock Enterprises, LLC | $15,964,488 | +38% |
| 9 | Railroad Construction Company, Inc. | $16,324,587 | +42% |
| 10 | JPC Group, Inc. | $17,111,247 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. PKF-Mark III, Inc. | 2. South State, Inc. | 3. Iew Construction Group, Inc. | 4. Ritacco Construction, Inc. | 5. Joseph M. Sanzari, Inc. | 6. Earle Asphalt Company |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Performance bond and payment bond (151006M) | DOL | 1 | $69,521 | $60,000 | $61,639 | $70,000 | $112,000 | $35,000 |
| 0002 | Pollution liability insurance (152015P) | DOL | 1 | $10,000 | $1.00 | $0.01 | $20,000 | $13,000 | $0.01 |
| 0003 | Progress schedule (153003P) | LS | 1 | $15,000 | $100.00 | $5,000.00 | $10,500 | $10,000 | $7,500.00 |
| 0004 | Progress schedule update (153005M) | U | 3 | $1,000.00 | $500.00 | $500.00 | $2,000.00 | $500.00 | $1,000.00 |
| 0005 | Mobilization (154003P) | LS | 1 | $778,991 | $1,350,000 | $865,000 | $2,116,000 | $1,050,560 | $2,201,431 |
| 0006 | Field office type F set UP (155018M) | U | 1 | $28,393 | $40,000 | $38,411 | $20,000 | $45,000 | $40,000 |
| 0007 | Field office type F maintenance (155036M) | MO | 15 | $3,923.00 | $5,000.00 | $4,986.03 | $2,500.00 | $3,500.00 | $4,750.00 |
| 0008 | Monument (157006M) | U | 7 | $2,054.35 | $700.00 | $597.64 | $750.00 | $1,330.00 | $1,150.00 |
| 0009 | Heavy duty silt fence, orange (158009M) | LF | 5,475 | $12.83 | $7.00 | $8.12 | $8.00 | $9.00 | $6.00 |
| 0010 | Heavy duty silt fence, black (158012M) | LF | 9,389 | $12.83 | $7.00 | $8.08 | $9.00 | $7.00 | $6.00 |
| 0011 | Haybale (158015M) | U | 100 | $149.17 | $30.00 | $35.11 | $20.00 | $34.00 | $1.00 |
| 0012 | Inlet filter type 2, 2' X 4' (158030M) | U | 17 | $351.00 | $100.00 | $173.85 | $100.00 | $200.00 | $75.00 |
| 0013 | Inlet filter type 2, 4' X 4' (158033M) | U | 40 | $342.97 | $150.00 | $182.97 | $150.00 | $292.00 | $125.00 |
| 0014 | Sediment control bag (158054M) | SF | 100 | $74.07 | $30.00 | $62.52 | $15.00 | $16.00 | $0.01 |
| 0015 | Construction driveway (158060M) | T | 38 | $427.94 | $150.00 | $80.79 | $90.00 | $250.00 | $205.00 |
| 0016 | Concrete washout system (158063P) | LS | 1 | $32,750 | $10,000 | $25,538 | $10,500 | $8,160.00 | $2,500.00 |
| 0017 | Bioretention system (158068P) | SY | 5,166 | $151.95 | $125.00 | $159.68 | $125.00 | $180.00 | $120.00 |
| 0018 | Oil only emergency spill kit, type 1 (158072M) | U | 2 | $2,200.00 | $2,000.00 | $3,310.48 | $500.00 | $1,330.00 | $1,200.00 |
| 0019 | Erosion control sediment removal (158084M) | CY | 2,000 | $1.00 | $0.01 | $5.00 | $1.00 | $121.00 | $0.01 |
| 0020 | Tree protection (158090P) | LF | 2,970 | $6.25 | $20.00 | $6.77 | $4.00 | $12.00 | $0.01 |
| 0021 | Wood mats (158105M) | SY | 300 | $100.00 | $10.00 | $139.51 | $100.00 | $273.00 | $80.00 |
| 0022 | Breakaway barricade (159003M) | U | 15 | $167.93 | $1.00 | $0.01 | $20.00 | $180.00 | $0.01 |
| 0023 | Drum (159006M) | U | 140 | $67.17 | $1.00 | $0.01 | $10.00 | $75.00 | $0.01 |
| 0024 | Traffic cone (159009M) | U | 140 | $22.89 | $1.00 | $0.01 | $1.00 | $25.00 | $0.01 |
| 0025 | Construction signs (159012M) | SF | 919 | $18.90 | $17.00 | $19.32 | $17.00 | $20.00 | $0.01 |
| 0026 | Construction barrier curb (159021P) | LF | 7,700 | $39.92 | $100.00 | $72.08 | $50.00 | $90.00 | $45.00 |
| 0027 | Arrow board, 4' X 8' (159027M) | U | 2 | $7,272.66 | $1,500.00 | $608.06 | $500.00 | $3,500.00 | $5,000.00 |
| 0028 | Portable variable message sign (159030M) | U | 3 | $25,000 | $6,500.00 | $3,040.26 | $1,000.00 | $10,000 | $19,000 |
| 0029 | Temporary crash cushion, inertial barrier system, 16 modules (159060M) | U | 5 | $2,975.00 | $5,000.00 | $11,052 | $3,000.00 | $15,000 | $8,500.00 |
| 0030 | Traffic control truck with mounted crash cushion (159108M) | U | 5 | $35,406 | $100.00 | $608.05 | $2,000.00 | $20,000 | $25,000 |
| 0031 | Fuel price adjustment (160004M) | DOL | 1 | $33,200 | $33,200 | $33,200 | $33,200 | $33,200 | $33,200 |
| 0032 | Asphalt price adjustment (160007M) | DOL | 1 | $12,500 | $12,500 | $12,500 | $12,500 | $12,500 | $12,500 |
| 0033 | Steel price adjustment (160009M) | DOL | 1 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0034 | Final cleanup (161003P) | LS | 1 | $9,581.91 | $100.00 | $25,000 | $10,500 | $25,000 | $20,000 |
| 0035 | Clearing site (201003P) | LS | 1 | $145,000 | $150,000 | $134,374 | $150,000 | $150,000 | $150,000 |
| 0036 | Stripping (202003P) | ACRE | 3 | $9,158.13 | $500.00 | $16,397 | $7,500.00 | $75,000 | $15,500 |
| 0037 | Excavation, test pit (202006M) | CY | 50 | $195.97 | $300.00 | $938.13 | $100.00 | $750.00 | $250.00 |
| 0038 | Excavation, unclassified (202009P) | CY | 27,061 | $50.00 | $50.00 | $98.18 | $45.00 | $50.00 | $50.00 |
| 0039 | Removal of pavement (202021P) | SY | 1,478 | $29.21 | $10.00 | $45.10 | $75.00 | $40.00 | $15.00 |
| 0040 | Geogrid reinforcement (203043P) | SY | 108 | $128.35 | $8.00 | $38.33 | $55.00 | $53.00 | $75.00 |
| 0041 | Subbase (301006P) | CY | 454 | $59.75 | $75.00 | $129.67 | $150.00 | $100.00 | $125.00 |
| 0042 | Dense-graded aggregate base course, 6" thick (302036P) | SY | 436 | $36.56 | $30.00 | $23.99 | $44.00 | $24.00 | $16.50 |
| 0043 | Dense-graded aggregate base course, 10" thick (302045P) | SY | 1,042 | $60.68 | $40.00 | $39.92 | $46.00 | $25.00 | $19.00 |
| 0044 | Polymerized joint adhesive (401027M) | LF | 4,168 | $1.00 | $1.00 | $1.14 | $2.00 | $1.00 | $0.01 |
| 0045 | Tack coat (401030M) | GAL | 175 | $10.00 | $1.00 | $11.37 | $10.00 | $10.00 | $4.00 |
| 0046 | Prime coat (401036M) | GAL | 560 | $10.00 | $1.00 | $1.14 | $0.10 | $14.00 | $0.01 |
| 0047 | Hot mix asphalt 12.5 M E surface course (401061M) | T | 196 | $265.00 | $300.00 | $301.18 | $290.00 | $230.00 | $135.00 |
| 0048 | Hot mix asphalt 19 M E intermediate course (401091M) | T | 350 | $225.00 | $260.00 | $255.72 | $270.00 | $190.00 | $140.00 |
| 0049 | Temporary sheeting (501003P) | SF | 1,010 | $46.56 | $1.00 | $0.01 | $1.00 | $50.00 | $0.01 |
| 0050 | 15" reinforced concrete pipe (601122P) | LF | 2,040 | $120.98 | $175.00 | $119.19 | $110.00 | $150.00 | $100.00 |
| 0051 | 18" reinforced concrete pipe (601124P) | LF | 488 | $121.89 | $190.00 | $142.94 | $135.00 | $190.00 | $102.00 |
| 0052 | 24" reinforced concrete pipe (601128P) | LF | 29 | $134.38 | $260.00 | $331.79 | $180.00 | $562.00 | $204.00 |
| 0053 | 15" reinforced concrete pipe, class V (601194P) | LF | 400 | $127.47 | $200.00 | $127.55 | $230.00 | $158.00 | $105.00 |
| 0054 | 18" reinforced concrete pipe, class V (601196P) | LF | 76 | $130.51 | $250.00 | $154.31 | $310.00 | $286.00 | $105.00 |
| 0055 | 15" reinforced concrete end section (601370M) | U | 3 | $5,881.83 | $2,400.00 | $2,595.71 | $2,000.00 | $4,750.00 | $2,500.00 |
| 0056 | 24" reinforced concrete end section (601376M) | U | 1 | $5,979.48 | $2,800.00 | $3,683.01 | $3,000.00 | $6,780.00 | $2,915.00 |
| 0057 | Subbase outlet drain (601404P) | LF | 76 | $66.71 | $35.00 | $141.21 | $70.00 | $165.00 | $80.00 |
| 0058 | Underdrain, type F (601416P) | LF | 1,735 | $73.62 | $60.00 | $62.27 | $60.00 | $5.00 | $55.50 |
| 0059 | Cleaning existing pipe, 12" to 24" diameter (601670M) | LF | 1,012 | $12.00 | $8.00 | $13.88 | $10.00 | $18.00 | $14.50 |
| 0060 | Cleaning existing pipe, over 48" to 72" diameter (601674M) | LF | 307 | $20.00 | $20.00 | $45.76 | $60.00 | $45.00 | $85.00 |
| 0061 | 16" ductile iron pipe (601680M) | LF | 178 | $212.74 | $290.00 | $197.61 | $280.00 | $415.00 | $225.00 |
| 0062 | 24" ductile iron pipe (601682M) | LF | 36 | $336.64 | $425.00 | $438.43 | $380.00 | $728.00 | $475.00 |
| 0063 | Concrete headwall (602006P) | CY | 16 | $3,837.19 | $2,100.00 | $1,982.71 | $2,500.00 | $3,250.00 | $1,500.00 |
| 0064 | Inlet, type B (602012M) | U | 7 | $8,598.67 | $6,800.00 | $7,261.68 | $8,000.00 | $6,790.00 | $4,820.00 |
| 0065 | Inlet, type E (602018M) | U | 22 | $9,132.94 | $7,200.00 | $9,309.30 | $6,500.00 | $8,500.00 | $5,990.00 |
| 0066 | Inlet, type B-2 (602027M) | U | 3 | $7,538.44 | $8,900.00 | $8,042.23 | $6,500.00 | $8,220.00 | $7,860.00 |
| 0067 | Manhole, 4' diameter (602054M) | U | 8 | $8,300.31 | $8,700.00 | $10,055 | $5,000.00 | $7,620.00 | $6,200.00 |
| 0068 | Manhole, 5' diameter (602057M) | U | 1 | $10,095 | $18,000 | $13,487 | $6,500.00 | $10,800 | $12,225 |
| 0069 | Inlet converted to manhole (602096M) | U | 2 | $6,691.80 | $2,500.00 | $5,146.70 | $3,000.00 | $4,520.00 | $2,450.00 |
| 0070 | Reconstructed inlet, type B, using new casting (602153M) | U | 2 | $7,505.58 | $2,800.00 | $5,000.77 | $3,000.00 | $4,000.00 | $2,450.00 |
| 0071 | Reconstructed inlet, type E, using new casting (602159M) | U | 1 | $7,663.07 | $2,900.00 | $5,151.37 | $3,000.00 | $4,910.00 | $2,625.00 |
| 0072 | Reconstructed manhole, using new casting (602183M) | U | 1 | $6,980.58 | $3,300.00 | $6,306.49 | $3,000.00 | $4,730.00 | $900.00 |
| 0073 | Cleaning drainage structure (602216M) | U | 5 | $500.00 | $800.00 | $936.51 | $1,000.00 | $2,100.00 | $1,350.00 |
| 0074 | Outlet control structure (602223M) | U | 4 | $11,745 | $10,000 | $11,405 | $12,500 | $13,170 | $13,000 |
| 0075 | Junction chamber (602226M) | U | 4 | $11,745 | $16,000 | $14,456 | $11,500 | $11,540 | $15,000 |
| 0076 | Manufactured treatment device (602229M) | U | 2 | $54,995 | $160,000 | $59,237 | $70,000 | $100,000 | $102,000 |
| 0077 | Riprap stone slope protection, 18" thick (D50=9") (603021P) | SY | 111 | $180.06 | $100.00 | $321.64 | $100.00 | $176.00 | $185.00 |
| 0078 | Riprap stone channel protection, 12" thick (D50=6") (603036P) | SY | 169 | $114.03 | $80.00 | $299.90 | $60.00 | $140.00 | $250.00 |
| 0079 | Chain-link fence, PVC-coated steel, 6' high (605027P) | LF | 664 | $59.00 | $100.00 | $65.35 | $55.00 | $58.00 | $90.00 |
| 0080 | Chain-link fence, 5' high (605042P) | LF | 171 | $69.00 | $135.00 | $72.17 | $55.00 | $64.00 | $85.00 |
| 0081 | Gate, chain-link fence, PVC- coated steel, 14' wide (605114M) | U | 1 | $4,000.00 | $9,000.00 | $3,017.53 | $2,500.00 | $2,655.00 | $5,300.00 |
| 0082 | Concrete driveway, 6" thick (606051P) | SY | 44 | $447.17 | $225.00 | $218.22 | $140.00 | $273.00 | $180.00 |
| 0083 | 9" X 16" concrete vertical curb (607018P) | LF | 1,259 | $55.00 | $40.00 | $60.81 | $35.00 | $57.00 | $52.00 |
| 0084 | 9" X 14" concrete vertical curb (607034P) | LF | 334 | $55.00 | $45.00 | $64.21 | $40.00 | $59.00 | $40.00 |
| 0085 | Nonvegetative surface, hot mix asphalt (608003P) | SY | 3,341 | $50.00 | $50.00 | $61.37 | $55.00 | $54.00 | $63.75 |
| 0086 | Beam guide rail (609003M) | LF | 2,870 | $34.00 | $35.00 | $33.53 | $30.00 | $30.00 | $42.50 |
| 0087 | Modified thrie beam guide rail (609009M) | LF | 4,841 | $62.00 | $60.00 | $65.07 | $55.00 | $57.00 | $77.50 |
| 0088 | Modified thrie beam guide rail, dual faced (609012M) | LF | 299 | $93.00 | $95.00 | $108.54 | $90.00 | $95.00 | $116.25 |
| 0089 | Tangent guide rail terminal (609027M) | U | 2 | $3,450.00 | $3,500.00 | $4,375.71 | $3,500.00 | $3,850.00 | $4,312.50 |
| 0090 | Telescoping guide rail end terminal (609030M) | U | 1 | $6,800.00 | $6,800.00 | $7,387.56 | $6,500.00 | $6,500.00 | $8,500.00 |
| 0091 | Beam guide rail anchorage (609039M) | U | 3 | $1,450.00 | $1,500.00 | $1,420.68 | $1,250.00 | $1,250.00 | $1,812.50 |
| 0092 | Removal of beam guide rail (609075M) | LF | 3,884 | $1.00 | $1.00 | $1.14 | $1.00 | $1.00 | $1.00 |
| 0093 | Traffic stripes, 6" (610006M) | LF | 1,200 | $2.00 | $2.00 | $2.27 | $2.00 | $2.00 | $2.50 |
| 0094 | Relocate sign (612021M) | U | 1 | $2,424.35 | $350.00 | $1,136.55 | $750.00 | $1,000.00 | $625.00 |
| 0095 | Custom sign (612032P) | SF | 3 | $494.32 | $45.00 | $1,136.55 | $250.00 | $1,500.00 | $62.50 |
| 0096 | Modify existing load center (701375P) | LS | 1 | $948.94 | $4,800.00 | $4,842.83 | $12,500 | $4,261.00 | $6,337.50 |
| 0097 | Lighting standard aluminum (703003M) | U | 1 | $5,762.43 | $4,100.00 | $5,420.38 | $4,500.00 | $4,769.00 | $5,450.00 |
| 0098 | Lighting mast arm aluminum (703012M) | U | 2 | $4,223.47 | $1,800.00 | $2,514.68 | $2,000.00 | $2,212.00 | $2,325.00 |
| 0099 | Luminaire (703018M) | U | 7 | $3,545.50 | $2,100.00 | $1,169.14 | $1,500.00 | $1,028.00 | $2,862.50 |
| 0100 | Temporary highway lighting system (703033P) | LS | 1 | $50,000 | $100.00 | $21,662 | $50,000 | $19,000 | $52,100 |
| 0101 | Selective thinning (801003M) | ACRE | 2 | $23,500 | $10,000 | $38,188 | $35,000 | $33,600 | $21,175 |
| 0102 | Tree removal, over 18" to 24" diameter (802027M) | U | 5 | $1,000.00 | $2,000.00 | $1,591.17 | $1,400.00 | $1,400.00 | $1,000.00 |
| 0103 | Tree removal, over 24" to 30" diameter (802030M) | U | 3 | $1,000.00 | $2,500.00 | $2,216.27 | $1,900.00 | $1,950.00 | $1,375.00 |
| 0104 | Topsoil spreading __" thick 4" thick (804000P) | SY | 18,310 | $8.15 | $7.00 | $4.55 | $4.00 | $7.00 | $9.00 |
| 0105 | Plant pit soil (804014P) | CY | 20 | $195.00 | $70.00 | $73.88 | $65.00 | $65.00 | $156.25 |
| 0106 | Fertilizing and seeding, type A-3 (806006P) | SY | 12,102 | $1.95 | $1.50 | $1.88 | $1.50 | $2.00 | $3.75 |
| 0107 | Fertilizing and seeding, basin bottom (806029P) | SY | 8,533 | $1.95 | $1.50 | $4.32 | $3.50 | $4.00 | $5.00 |
| 0108 | Wildflower seeding (806030P) | SY | 369 | $5.69 | $8.00 | $5.68 | $5.00 | $5.00 | $15.00 |
| 0109 | Fertilizing and seeding, low maintenance (806033P) | SY | 3,311 | $1.95 | $1.50 | $1.93 | $1.50 | $2.00 | $5.00 |
| 0110 | Topsoil stabilization, type 2 mat (807006M) | SY | 7,866 | $2.70 | $5.00 | $5.11 | $4.50 | $5.00 | $4.50 |
| 0111 | Straw mulching (809003M) | SY | 8,902 | $0.54 | $1.00 | $1.14 | $1.00 | $1.00 | $1.25 |
| 0112 | Fiber mulching (809006M) | SY | 12,102 | $0.54 | $1.50 | $1.76 | $1.50 | $2.00 | $1.25 |
| 0113 | Wood mulching (809018M) | SY | 77 | $27.27 | $7.00 | $5.68 | $5.00 | $5.00 | $12.50 |
| 0114 | Large deciduous tree, 2-2 1/2" caliper, B&B (811006M) | U | 12 | $895.00 | $600.00 | $710.34 | $600.00 | $625.00 | $750.00 |
| 0115 | Small deciduous tree, 2-2 1/2" caliper, B&B (811024M) | U | 4 | $995.00 | $600.00 | $710.34 | $600.00 | $625.00 | $750.00 |
| 0116 | Small deciduous tree, 7-8' high, B&B (811031M) | U | 8 | $895.00 | $600.00 | $670.56 | $550.00 | $590.00 | $650.00 |
| 0117 | Evergreen tree, 7-8' high B&B (811037M) | U | 10 | $895.00 | $875.00 | $909.24 | $800.00 | $800.00 | $875.00 |
| 0118 | Deciduous shrub, 18-24" high, #3 container (811063M) | U | 48 | $85.00 | $65.00 | $68.19 | $60.00 | $60.00 | $206.00 |
| 0119 | Evergreen shrub, 18-24" high, #3 container (811078M) | U | 15 | $160.00 | $65.00 | $68.19 | $60.00 | $60.00 | $245.00 |
| 0120 | Plant establishment and maintenance period (811138M) | LS | 1 | $8,500.00 | $75,000 | $6,677.21 | $6,000.00 | $5,875.00 | $18,750 |
| 0121 | Watering (811165M) | MG | 7 | $1,250.00 | $400.00 | $397.79 | $350.00 | $350.00 | $625.00 |
| 0122 | Temporary sheeting (501003P) | SF | 790 | $1.00 | $1.00 | $0.01 | $1.00 | $40.00 | $75.00 |
| 0123 | Furnishing drilled shaft equipment (503003P) | LS | 1 | $500,000 | $255,000 | $15,912 | $169,522 | $50,700 | $505,000 |
| 0124 | Demonstration drilled shaft (503006M) | LF | 20 | $2,400.00 | $850.00 | $1,449.01 | $550.00 | $1,100.00 | $1,562.50 |
| 0125 | Crosshole sonic logging (503012M) | U | 5 | $1,200.00 | $3,300.00 | $3,409.64 | $4,000.00 | $3,418.00 | $3,125.00 |
| 0126 | Shaft coring (503015M) | LF | 100 | $50.50 | $450.00 | $113.65 | $200.00 | $480.00 | $125.00 |
| 0127 | Drilled shaft in soil 36" diameter (503018M) | LF | 3,261 | $191.29 | $675.00 | $593.85 | $350.00 | $732.00 | $1,000.00 |
| 0128 | Drilled shaft in soil, 42" diameter (503019M) | LF | 84 | $338.30 | $825.00 | $533.59 | $450.00 | $927.00 | $1,170.00 |
| 0129 | Obstruction removal (503048M) | LF | 20 | $2,900.00 | $100.00 | $909.24 | $1,500.00 | $2,990.00 | $1,250.00 |
| 0130 | Drilled shaft in rock, 30" diameter (503049M) | LF | 295 | $1,072.89 | $790.00 | $1,329.58 | $950.00 | $834.00 | $1,188.00 |
| 0131 | Tomography (503051M) | U | 5 | $1,200.00 | $2,100.00 | $1,136.55 | $2,000.00 | $2,200.00 | $3,125.00 |
| 0132 | Noise barrier, foundation (613002P) | U | 2 | $28,570 | $33,000 | $59,767 | $55,000 | $28,390 | $22,580 |
| 0133 | Noise barrier, roadway (613004P) | SY | 5,050 | $530.00 | $560.00 | $514.27 | $900.00 | $540.00 | $500.00 |
| 0134 | Noise barrier test posts and panels (613015P) | LS | 1 | $12,033 | $10,000 | $11,365 | $10,000 | $13,000 | $25,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NJDOT's tabulation for this contract. NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
Every contract let that day: NJDOT letting of August 26, 2025. Compiled by Mirage Metrics.