PKF-Mark III, Inc.: NJDOT bid record
PKF-Mark III, Inc. submitted 44 bids on New Jersey DOT contracts in the data, from 08 FEB 2018 to 18 DEC 2025, and was the low bidder on 16 of them (36%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $193,905,194
- Latest bid
- 18 DEC 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 4 | 4 | 100% |
| 2019 | 6 | 1 | 17% |
| 2020 | 8 | 3 | 38% |
| 2021 | 5 | 2 | 40% |
| 2022 | 4 | 1 | 25% |
| 2023 | 3 | 1 | 33% |
| 2024 | 8 | 2 | 25% |
| 2025 | 6 | 2 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 11 | 3 | 27% |
| N1 | 8 | 2 | 25% |
| C4 | 7 | 3 | 43% |
| S4 | 6 | 2 | 33% |
| S1 | 5 | 2 | 40% |
| N4 | 4 | 1 | 25% |
| C1 | 3 | 3 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reinforcement steel, epoxy- coated | 504006P | LB | 97 | 50 (52%) | $2.50 | $2.52 |
| Crosshole sonic logging | 503012M | U | 46 | 32 (70%) | $1,100.00 | $2,500.00 |
| Concrete pier column and cap, HPC | 504026P | CY | 71 | 31 (44%) | $1,800.00 | $2,291.62 |
| Excavation, unclassified | 202009P | CY | 80 | 30 (38%) | $145.00 | $78.60 |
| Tomography | 503051M | U | 27 | 16 (59%) | $700.00 | $825.00 |
| Overtime differential (OD) | MMG025M | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Solid waste disposal | MMB173M | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Crew coordinator | MMB092M | HR | 15 | 15 (100%) | $140.00 | $135.00 |
| Disposal of regulated material, hazardous | MMG064M | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Telephone service | MMG010M | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Epoxy waterproofing | 504036P | SY | 28 | 13 (46%) | $88.90 | $72.50 |
| Substructure concrete repair | 555003M | SF | 19 | 13 (68%) | $295.00 | $325.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 24 | 14 of 24 |
| Agate Construction Co., Inc. | 15 | 4 of 15 |
| Mount Construction Co., Inc. | 14 | 6 of 14 |
| South State, Inc. | 10 | 3 of 10 |
| Midlantic Construction, LLC | 8 | 1 of 8 |
| Sparwick Contracting, Inc. | 8 | 7 of 8 |
| Joseph M. Sanzari, Inc. | 7 | 3 of 7 |
| Daidone Electric, Inc. | 5 | 5 of 5 |
| Berto Construction, Inc. | 5 | 3 of 5 |
| J. Fletcher Creamer & Son, Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 DEC 2025 | 26432 | C4 | MTN STORMWATER FACILITY RES CENTRAL 2026 | 4 of 4 | $10,246,100 | +20% |
| 13 NOV 2025 | 26435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2026 | 3 of 3 | $4,994,000 | +11% |
| 23 OCT 2025 | 25602 | N1 | Rt 80, White Meadow Road to Riverview Drive (CR 640), C#1 | 5 of 5 | $11,106,000 | +86% |
| 28 AUG 2025 | 25703 | N1 | Ferry Slip Reconstruction Liberty State Park Phase 1 | 1 of 2 | $10,654,000 | Low, 5.0% under the second |
| 26 AUG 2025 | 25122 | C1 | Route 295 Noise Barrier | 1 of 10 | $11,528,000 | Low, 18% under the second |
| 15 APR 2025 | 25600 | H4 | 2026 WORLD CUP ITS IMPROVEMENTS | 4 of 4 | $36,291,900 | +77% |
| 17 DEC 2024 | 25435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2025 | 1 of 4 | $6,995,990 | Low, 4.0% under the second |
| 21 NOV 2024 | 23463 | H4 | Bridge Preventive Maintenance Contract 2023-2 | 7 of 7 | $14,948,247 | +90% |
| 14 NOV 2024 | 24708 | N1 | Liberty State Park Ferry and Emergency Evacuation Terminal | 1 of 4 | $22,301,480 | Low, 24% under the second |
| 29 OCT 2024 | 25426 | C4 | MTN CONCRETE STRUC. REP. CENTRAL - 2025 | 3 of 4 | $9,765,340 | +14% |
| 06 JUN 2024 | 24119 | N1 | CR 583 (Princeton Pike), Bridge over Rt 295 & Ramps B & D | 9 of 9 | $27,066,081 | +37% |
| 23 APR 2024 | 24439 | S4 | MTN Infrastructure Repair South 2024 | 2 of 3 | $9,628,170 | +15% |
| 29 FEB 2024 | 22411 | H4 | MTN Route 29 Tunnel Lighting System Improvement | 3 of 3 | $5,733,714 | +23% |
| 22 FEB 2024 | 18450 | H4 | Maintenance Bridge Fender Replacement Contract 2018-1 | 4 of 5 | $26,432,470 | +45% |
| 05 DEC 2023 | 24436 | S4 | MTN TIMBER AND UNDERWATER, SOUTH - 2024 | 3 of 4 | $5,073,486 | +6.0% |
| 30 NOV 2023 | 24435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2024 | 1 of 3 | $6,744,356 | Low, 6.0% under the second |
| 28 NOV 2023 | 24434 | N4 | MTN TIMBER AND UNDERWATER, NORTH - 2024 | 2 of 4 | $16,861,542 | +29% |
| 15 DEC 2022 | 22135 | S1 | Route 130, Bridge over Big Timber Creek | 3 of 4 | $76,986,029 | +42% |
| 03 NOV 2022 | 23436 | S4 | MTN TIMBER AND UNDERWATER, SOUTH - 2023 | 2 of 3 | $5,690,934 | +4.0% |
| 01 NOV 2022 | 23435 | C4 | MTN TIMBER AND UNDERWATER, CENTRAL - 2023 | 1 of 3 | $9,398,980 | Low, 4.0% under the second |
| 27 OCT 2022 | 23434 | N4 | MTN TIMBER AND UNDERWATER, NORTH - 2023 | 3 of 4 | $14,862,360 | +30% |
| 16 DEC 2021 | 21475 | S4 | RE-ADV Signature Bridge Preventive Maintenance 2019-1 | 1 of 3 | $27,335,521 | Low, 0.0% under the second |
| 10 JUN 2021 | 20457 | H4 | Signature Bridge Preventive Maintenance 2020-1 | 1 of 5 | $11,760,780 | Low, 5.0% under the second |
| 03 JUN 2021 | 21456 | H4 | MTN RT 37 TUNNEY BRDG PILE RPR | 3 of 5 | $8,897,835 | +18% |
| 25 MAY 2021 | 21603 | S1 | Smart Moves 2020 South | 2 of 3 | $8,879,936 | +15% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.