J. Fletcher Creamer & Son, Inc.: NJDOT bid record
J. Fletcher Creamer & Son, Inc. submitted 59 bids on New Jersey DOT contracts in the data, from 14 SEP 2017 to 05 FEB 2026, and was the low bidder on 15 of them (25%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $113,042,772
- Latest bid
- 05 FEB 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 0 | 0% |
| 2018 | 6 | 2 | 33% |
| 2019 | 8 | 2 | 25% |
| 2020 | 11 | 4 | 36% |
| 2021 | 5 | 1 | 20% |
| 2022 | 9 | 2 | 22% |
| 2023 | 7 | 2 | 29% |
| 2024 | 6 | 0 | 0% |
| 2025 | 5 | 1 | 20% |
| 2026 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 14 | 3 | 21% |
| N4 | 12 | 8 | 67% |
| C4 | 11 | 0 | 0% |
| S4 | 10 | 0 | 0% |
| C1 | 6 | 3 | 50% |
| S1 | 4 | 1 | 25% |
| H4 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete footing | 504015P | CY | 80 | 61 (76%) | $400.00 | $785.00 |
| Performance bond and payment bond | 151006M | DOL | 55 | 47 (85%) | $17,357 | $32,468 |
| Concrete pier column and cap, HPC | 504026P | CY | 136 | 44 (32%) | $2,500.00 | $2,291.62 |
| Excavation, unclassified | 202009P | CY | 129 | 37 (29%) | $150.00 | $78.60 |
| Tomography | 503051M | U | 36 | 35 (97%) | $500.00 | $825.00 |
| Force account | 109006M | DOL | 31 | 31 (100%) | $1.00 | $1.00 |
| Tangent guide rail terminal | 609027M | U | 45 | 30 (67%) | $3,000.00 | $3,811.77 |
| Telephone service | MMG010M | DOL | 28 | 28 (100%) | $1.00 | $1.00 |
| Emergency mobilization | MMR006M | U | 27 | 27 (100%) | $5,000.00 | $10,000 |
| Field office equipment | MMG018M | DOL | 27 | 27 (100%) | $1.00 | $1.00 |
| Special mobilization | MMR005M | U | 27 | 27 (100%) | $2,000.00 | $2,000.00 |
| Inspection of units | MMA001M | U | 27 | 27 (100%) | $1,000.00 | $1,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M.L. Ruberton Construction Co., Inc. | 33 | 21 of 33 |
| Iew Construction Group, Inc. | 18 | 8 of 18 |
| South State, Inc. | 15 | 9 of 15 |
| Mount Construction Co., Inc. | 7 | 5 of 7 |
| Union Paving & Construction Co., Inc. | 6 | 4 of 6 |
| Berto Construction, Inc. | 6 | 3 of 6 |
| Anselmi & Decicco, Inc. | 5 | 4 of 5 |
| Sparwick Contracting, Inc. | 5 | 4 of 5 |
| PKF-Mark III, Inc. | 4 | 2 of 4 |
| Ferreira Construction Co., Inc. | 4 | 4 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 FEB 2026 | 25140 | S1 | Horizontal Curve Safety Sign Program, South Region | 1 of 2 | $1,332,783 | Low, 9.0% under the second |
| 16 OCT 2025 | 26447 | S4 | MTN Beam Guide Rail & Attenuator South 2026 | 2 of 3 | $2,715,474 | +22% |
| 14 OCT 2025 | 25135 | C1 | Horizontal Curve Sign Safety Program - Central Region | 2 of 2 | $2,889,069 | +19% |
| 14 OCT 2025 | 26446 | C4 | MTN Beam Guide Rail & Attenuator Central 2026 | 2 of 3 | $2,887,976 | +8.0% |
| 09 OCT 2025 | 26445 | N4 | MTN Beam Guide Rail & Attenuator North 2026 | 1 of 2 | $7,688,374 | Low, 2.0% under the second |
| 22 JUL 2025 | 25118 | N1 | NJDOT Horizontal Curve Signs - North | 3 of 3 | $1,247,832 | +159% |
| 26 NOV 2024 | 25433 | S4 | MTN STORMWATER FACILITY RES SOUTH 2025 | 2 of 2 | $9,807,045 | +38% |
| 22 OCT 2024 | 25447 | S4 | MTN Beam Guide Rail & Attenuator South 2025 | 3 of 3 | $2,634,102 | +38% |
| 17 OCT 2024 | 25446 | C4 | MTN Beam Guide Rail & Attenuator Central 2025 | 3 of 3 | $2,788,697 | +23% |
| 10 OCT 2024 | 25445 | N4 | MTN Beam Guide Rail & Attenuator North 2025 | 2 of 3 | $7,147,532 | +3.0% |
| 04 JUN 2024 | 23476 | C4 | 2nd Re-Adv MTN Guiderail ET&A, Central and South 2023 | 2 of 7 | $1,757,163 | +7.0% |
| 21 MAY 2024 | 24457 | N4 | MTN Sign and Sign Structures Repair, North - 2024 | 4 of 4 | $1,567,331 | +44% |
| 21 NOV 2023 | 24447 | S4 | MTN Beam Guide Rail n Attenuator South 2024 | 3 of 3 | $2,857,774 | +37% |
| 16 NOV 2023 | 24446 | C4 | MTN Beam Guide Rail n Attenuator Central 2024 | 3 of 3 | $3,739,774 | +30% |
| 14 NOV 2023 | 24445 | N4 | MTN Beam Guide Rail n Attenuator North 2024 | 1 of 2 | $6,297,400 | Low, 13% under the second |
| 06 JUN 2023 | 23469 | C4 | Sign and Sign Structures Repair Contract, Central 2023 | 4 of 4 | $1,102,922 | +14% |
| 16 FEB 2023 | 23447 | S4 | MTN Beam Guide Rail n Attenuator South 2023 | 4 of 4 | $2,997,044 | +26% |
| 14 FEB 2023 | 23446 | C4 | MTN Beam Guide Rail n Attenuator Central 2023 | 2 of 2 | $3,491,692 | +2.0% |
| 09 FEB 2023 | 23445 | N4 | MTN Beam Guide Rail n Attenuator North 2023 | 1 of 2 | $6,949,747 | Low, 25% under the second |
| 02 JUN 2022 | 22464 | C4 | RE-ADV MTN Beam Guide Rail n Attenuator Central 2022 | 2 of 2 | $3,999,252 | +13% |
| 26 MAY 2022 | 22125 | S1 | Guiderail Replacement South Contract 2019-3 | 2 of 3 | $6,996,471 | +56% |
| 26 MAY 2022 | 22463 | N4 | RE-ADV MTN Beam Guide Rail n Attenuator North 2022 | 1 of 2 | $6,184,747 | Low, 33% under the second |
| 24 MAY 2022 | 22128 | N1 | Guiderail Replacement North, Contract 2019-1 | 1 of 2 | $3,298,747 | Low, 20% under the second |
| 12 MAY 2022 | 22123 | N1 | RT 208, WYCKOFF TWP., BERGEN COUNTY, CULVERT REPLACEMENT | 3 of 7 | $4,857,892 | +22% |
| 21 APR 2022 | 22114 | S1 | R 76, Nicholson Rd, Advanced Utility Relocation, Contract 2 | 3 of 4 | $2,068,995 | +7.0% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.