J. Fletcher Creamer & Son, Inc. submitted 59 bids on New Jersey DOT contracts in the data, from 14 SEP 2017 to 05 FEB 2026, and was the low bidder on 15 of them (25%). When it was not low, its total sat a median +22% above the low bid.

Owner
New Jersey DOT
Low bid volume
$113,042,772
Latest bid
05 FEB 2026
Data through
16 APR 2026
59Bids
15Low bids
25Win rate, percent
+22%Median gap to the low bid when not low, 44 bids

By year

YearBidsLow bidsWin rate
2017100%
20186233%
20198225%
202011436%
20215120%
20229222%
20237229%
2024600%
20255120%
202611100%
J. Fletcher Creamer & Son, Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
N114321%
N412867%
C41100%
S41000%
C16350%
S14125%
H4200%
J. Fletcher Creamer & Son, Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Concrete footing504015PCY8061 (76%)$400.00$785.00
Performance bond and payment bond151006MDOL5547 (85%)$17,357$32,468
Concrete pier column and cap, HPC504026PCY13644 (32%)$2,500.00$2,291.62
Excavation, unclassified202009PCY12937 (29%)$150.00$78.60
Tomography503051MU3635 (97%)$500.00$825.00
Force account109006MDOL3131 (100%)$1.00$1.00
Tangent guide rail terminal609027MU4530 (67%)$3,000.00$3,811.77
Telephone serviceMMG010MDOL2828 (100%)$1.00$1.00
Emergency mobilizationMMR006MU2727 (100%)$5,000.00$10,000
Field office equipmentMMG018MDOL2727 (100%)$1.00$1.00
Special mobilizationMMR005MU2727 (100%)$2,000.00$2,000.00
Inspection of unitsMMA001MU2727 (100%)$1,000.00$1,000.00
J. Fletcher Creamer & Son, Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

J. Fletcher Creamer & Son, Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 FEB 202625140S1Horizontal Curve Safety Sign Program, South Region1 of 2$1,332,783Low, 9.0% under the second
16 OCT 202526447S4MTN Beam Guide Rail & Attenuator South 20262 of 3$2,715,474+22%
14 OCT 202525135C1Horizontal Curve Sign Safety Program - Central Region2 of 2$2,889,069+19%
14 OCT 202526446C4MTN Beam Guide Rail & Attenuator Central 20262 of 3$2,887,976+8.0%
09 OCT 202526445N4MTN Beam Guide Rail & Attenuator North 20261 of 2$7,688,374Low, 2.0% under the second
22 JUL 202525118N1NJDOT Horizontal Curve Signs - North3 of 3$1,247,832+159%
26 NOV 202425433S4MTN STORMWATER FACILITY RES SOUTH 20252 of 2$9,807,045+38%
22 OCT 202425447S4MTN Beam Guide Rail & Attenuator South 20253 of 3$2,634,102+38%
17 OCT 202425446C4MTN Beam Guide Rail & Attenuator Central 20253 of 3$2,788,697+23%
10 OCT 202425445N4MTN Beam Guide Rail & Attenuator North 20252 of 3$7,147,532+3.0%
04 JUN 202423476C42nd Re-Adv MTN Guiderail ET&A, Central and South 20232 of 7$1,757,163+7.0%
21 MAY 202424457N4MTN Sign and Sign Structures Repair, North - 20244 of 4$1,567,331+44%
21 NOV 202324447S4MTN Beam Guide Rail n Attenuator South 20243 of 3$2,857,774+37%
16 NOV 202324446C4MTN Beam Guide Rail n Attenuator Central 20243 of 3$3,739,774+30%
14 NOV 202324445N4MTN Beam Guide Rail n Attenuator North 20241 of 2$6,297,400Low, 13% under the second
06 JUN 202323469C4Sign and Sign Structures Repair Contract, Central 20234 of 4$1,102,922+14%
16 FEB 202323447S4MTN Beam Guide Rail n Attenuator South 20234 of 4$2,997,044+26%
14 FEB 202323446C4MTN Beam Guide Rail n Attenuator Central 20232 of 2$3,491,692+2.0%
09 FEB 202323445N4MTN Beam Guide Rail n Attenuator North 20231 of 2$6,949,747Low, 25% under the second
02 JUN 202222464C4RE-ADV MTN Beam Guide Rail n Attenuator Central 20222 of 2$3,999,252+13%
26 MAY 202222125S1Guiderail Replacement South Contract 2019-32 of 3$6,996,471+56%
26 MAY 202222463N4RE-ADV MTN Beam Guide Rail n Attenuator North 20221 of 2$6,184,747Low, 33% under the second
24 MAY 202222128N1Guiderail Replacement North, Contract 2019-11 of 2$3,298,747Low, 20% under the second
12 MAY 202222123N1RT 208, WYCKOFF TWP., BERGEN COUNTY, CULVERT REPLACEMENT3 of 7$4,857,892+22%
21 APR 202222114S1R 76, Nicholson Rd, Advanced Utility Relocation, Contract 23 of 4$2,068,995+7.0%
J. Fletcher Creamer & Son, Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy