M.L. Ruberton Construction Co., Inc.: NJDOT bid record
M.L. Ruberton Construction Co., Inc. submitted 34 bids on New Jersey DOT contracts in the data, from 14 SEP 2017 to 16 OCT 2025, and was the low bidder on 18 of them (53%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $55,841,074
- Latest bid
- 16 OCT 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 0 | 0% |
| 2018 | 3 | 2 | 67% |
| 2019 | 3 | 2 | 67% |
| 2020 | 3 | 2 | 67% |
| 2021 | 3 | 2 | 67% |
| 2022 | 6 | 3 | 50% |
| 2023 | 7 | 3 | 43% |
| 2024 | 4 | 2 | 50% |
| 2025 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| C4 | 10 | 8 | 80% |
| N4 | 9 | 0 | 0% |
| S4 | 9 | 9 | 100% |
| N1 | 3 | 0 | 0% |
| C1 | 2 | 1 | 50% |
| S1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Force account | 109006M | DOL | 27 | 27 (100%) | $1.00 | $1.00 |
| Telephone service | MMG010M | DOL | 27 | 27 (100%) | $1.00 | $1.00 |
| Emergency mobilization | MMR006M | U | 27 | 27 (100%) | $5,000.00 | $10,000 |
| Field office equipment | MMG018M | DOL | 27 | 27 (100%) | $1.00 | $1.00 |
| Special mobilization | MMR005M | U | 27 | 27 (100%) | $2,000.00 | $2,000.00 |
| Inspection of units | MMA001M | U | 27 | 27 (100%) | $1,000.00 | $1,000.00 |
| Beam guide rail | 609003M | LF | 32 | 21 (66%) | $48.00 | $35.00 |
| Nonvegetative surface, porous hot mix asphalt, 6" thick | 608005P | SY | 26 | 19 (73%) | $45.00 | $60.00 |
| Nonvegetative surface, hot mix asphalt | 608003P | SY | 29 | 18 (62%) | $48.00 | $50.00 |
| Flared guide rail terminal | 609024M | U | 27 | 16 (59%) | $2,500.00 | $2,750.00 |
| Modified thrie beam guide rail | 609009M | LF | 28 | 15 (54%) | $50.00 | $70.00 |
| 9" X 14" concrete vertical curb | 607034P | LF | 25 | 15 (60%) | $40.00 | $53.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| J. Fletcher Creamer & Son, Inc. | 33 | 12 of 33 |
| South State, Inc. | 10 | 4 of 10 |
| Iew Construction Group, Inc. | 7 | 1 of 7 |
| Road Safety Systems, LLC | 4 | 1 of 4 |
| Green Construction, Inc. | 1 | 0 of 1 |
| Berto Construction, Inc. | 1 | 0 of 1 |
| Konkus Corporation | 1 | 0 of 1 |
| LC Equipment, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2025 | 26447 | S4 | MTN Beam Guide Rail & Attenuator South 2026 | 1 of 3 | $2,230,742 | Low, 22% under the second |
| 14 OCT 2025 | 26446 | C4 | MTN Beam Guide Rail & Attenuator Central 2026 | 1 of 3 | $2,664,661 | Low, 8.0% under the second |
| 09 OCT 2025 | 26445 | N4 | MTN Beam Guide Rail & Attenuator North 2026 | 2 of 2 | $7,848,908 | +2.0% |
| 22 JUL 2025 | 25118 | N1 | NJDOT Horizontal Curve Signs - North | 2 of 3 | $1,157,513 | +140% |
| 22 OCT 2024 | 25447 | S4 | MTN Beam Guide Rail & Attenuator South 2025 | 1 of 3 | $1,903,732 | Low, 1.0% under the second |
| 17 OCT 2024 | 25446 | C4 | MTN Beam Guide Rail & Attenuator Central 2025 | 2 of 3 | $2,613,224 | +16% |
| 10 OCT 2024 | 25445 | N4 | MTN Beam Guide Rail & Attenuator North 2025 | 3 of 3 | $8,364,315 | +20% |
| 04 JUN 2024 | 23476 | C4 | 2nd Re-Adv MTN Guiderail ET&A, Central and South 2023 | 1 of 7 | $1,642,670 | Low, 7.0% under the second |
| 21 NOV 2023 | 24447 | S4 | MTN Beam Guide Rail n Attenuator South 2024 | 1 of 3 | $2,079,156 | Low, 20% under the second |
| 16 NOV 2023 | 24446 | C4 | MTN Beam Guide Rail n Attenuator Central 2024 | 2 of 3 | $3,144,156 | +9.0% |
| 14 NOV 2023 | 24445 | N4 | MTN Beam Guide Rail n Attenuator North 2024 | 2 of 2 | $7,147,014 | +13% |
| 18 MAY 2023 | 23418 | N1 | MTN GR End Treatment and Attenuator Project, North - 2023 | 2 of 3 | $2,066,707 | +29% |
| 16 FEB 2023 | 23447 | S4 | MTN Beam Guide Rail n Attenuator South 2023 | 1 of 4 | $2,372,779 | Low, 13% under the second |
| 14 FEB 2023 | 23446 | C4 | MTN Beam Guide Rail n Attenuator Central 2023 | 1 of 2 | $3,429,833 | Low, 2.0% under the second |
| 09 FEB 2023 | 23445 | N4 | MTN Beam Guide Rail n Attenuator North 2023 | 2 of 2 | $8,659,383 | +25% |
| 02 JUN 2022 | 22464 | C4 | RE-ADV MTN Beam Guide Rail n Attenuator Central 2022 | 1 of 2 | $3,546,242 | Low, 13% under the second |
| 26 MAY 2022 | 22125 | S1 | Guiderail Replacement South Contract 2019-3 | 3 of 3 | $7,140,883 | +60% |
| 26 MAY 2022 | 22463 | N4 | RE-ADV MTN Beam Guide Rail n Attenuator North 2022 | 2 of 2 | $8,248,147 | +33% |
| 24 MAY 2022 | 22128 | N1 | Guiderail Replacement North, Contract 2019-1 | 2 of 2 | $3,953,791 | +20% |
| 07 APR 2022 | 22108 | C1 | Guiderail Replacement Central, Contract 2019-1 | 1 of 4 | $3,285,964 | Low, 19% under the second |
| 03 FEB 2022 | 22423 | S4 | MTN Beam Guide Rail n Attenuator South 2022 | 1 of 3 | $2,280,034 | Low, 32% under the second |
| 09 FEB 2021 | 21425 | C4 | MTN Beam Guide Rail n Attenuator Central 2021 | 1 of 2 | $4,210,120 | Low, 13% under the second |
| 04 FEB 2021 | 21426 | S4 | MTN Beam Guide Rail n Attenuator South 2021 | 1 of 2 | $3,361,344 | Low, 33% under the second |
| 28 JAN 2021 | 21424 | N4 | MTN Beam Guide Rail n Attenuator North 2021 | 2 of 2 | $7,911,604 | +21% |
| 28 JAN 2020 | 20418 | S4 | MTN Beam Guide Rail n Attenuator South 2020 | 1 of 2 | $4,344,052 | Low, 47% under the second |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.