Berto Construction, Inc.: NJDOT bid record
Berto Construction, Inc. submitted 91 bids on New Jersey DOT contracts in the data, from 05 OCT 2017 to 19 FEB 2026, and was the low bidder on 27 of them (30%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $142,646,970
- Latest bid
- 19 FEB 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 2 | 0 | 0% |
| 2018 | 8 | 1 | 13% |
| 2019 | 5 | 2 | 40% |
| 2020 | 16 | 3 | 19% |
| 2021 | 18 | 4 | 22% |
| 2022 | 13 | 7 | 54% |
| 2023 | 11 | 3 | 27% |
| 2024 | 11 | 5 | 45% |
| 2025 | 5 | 1 | 20% |
| 2026 | 2 | 1 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 29 | 11 | 38% |
| C1 | 22 | 7 | 32% |
| H4 | 16 | 5 | 31% |
| C4 | 10 | 1 | 10% |
| S1 | 8 | 3 | 38% |
| N4 | 3 | 0 | 0% |
| S4 | 2 | 0 | 0% |
| C4, N4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 51 | 51 (100%) | $2,300.00 | $2,700.00 |
| Asphalt price adjustment | 160007M | DOL | 41 | 41 (100%) | $7,500.00 | $10,200 |
| Construction signs | 159012M | SF | 70 | 30 (43%) | $16.00 | $15.00 |
| Traffic stripes, 4" | 610003M | LF | 69 | 29 (42%) | $0.90 | $0.50 |
| Excavation, unclassified | 202009P | CY | 108 | 27 (25%) | $90.00 | $78.60 |
| Drum | 159006M | U | 41 | 25 (61%) | $1.00 | $1.00 |
| Regulatory and warning sign | 612003P | SF | 44 | 24 (55%) | $42.00 | $45.00 |
| Removal of beam guide rail | 609075M | LF | 38 | 24 (63%) | $1.00 | $2.00 |
| Breakaway barricade | 159003M | U | 43 | 22 (51%) | $19.00 | $1.00 |
| Traffic cone | 159009M | U | 35 | 22 (63%) | $1.00 | $9.20 |
| Polymerized joint adhesive | 401027M | LF | 52 | 21 (40%) | $1.00 | $0.52 |
| Inlet filter type 2, 2' X 4' | 158030M | U | 44 | 21 (48%) | $110.00 | $120.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 35 | 17 of 35 |
| Joseph M. Sanzari, Inc. | 35 | 20 of 35 |
| Mount Construction Co., Inc. | 20 | 10 of 20 |
| Power Concrete Co., Inc. | 17 | 10 of 17 |
| Sparwick Contracting, Inc. | 17 | 6 of 17 |
| Green Construction, Inc. | 14 | 6 of 14 |
| Ritacco Construction, Inc. | 14 | 4 of 14 |
| South State, Inc. | 13 | 7 of 13 |
| Black Rock Enterprises, LLC | 13 | 4 of 13 |
| Crisdel Group, Inc. | 13 | 4 of 13 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 FEB 2026 | 24474 | H4 | MTN Pier Protection Contract 2024-1 | 1 of 4 | $2,650,533 | Low, 45% under the second |
| 27 JAN 2026 | 25129 | C1 | ADA Central, Contract 1 | 4 of 4 | $24,899,322 | +12% |
| 30 OCT 2025 | 25601 | N1 | Smart Moves 2021 North | 4 of 4 | $18,597,670 | +26% |
| 07 OCT 2025 | 25126 | C1 | RT 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS | 4 of 4 | $14,889,000 | +31% |
| 24 JUN 2025 | 25117 | N1 | Passaic Avenue, Ward Avenue | 1 of 2 | $1,978,864 | Low, 4.0% under the second |
| 15 APR 2025 | 25418 | H4 | Bridge Preventive MTN and Painting 2025-2 | 3 of 4 | $7,884,188 | +13% |
| 10 APR 2025 | 25415 | H4 | Bridge Preventive MTN and Painting 2025-1 | 4 of 5 | $13,227,973 | +58% |
| 21 NOV 2024 | 23463 | H4 | Bridge Preventive Maintenance Contract 2023-2 | 1 of 7 | $7,884,258 | Low, 17% under the second |
| 31 OCT 2024 | 24151 | S1 | ADA South, Contract 1 with ROW Cost Estimate | 2 of 2 | $4,627,327 | +16% |
| 17 OCT 2024 | 24141 | C1 | Route 31 SB CR 523 (Walter Foran Blvd) to Wescott Dr(CR 600) | 1 of 4 | $3,657,483 | Low, 12% under the second |
| 17 OCT 2024 | 24144 | N1 | Rt 280 EB, Bridges over Passaic River | 5 of 7 | $15,421,250 | +29% |
| 03 OCT 2024 | 24130 | C1 | Rt. 9, Throckmorton Ln/Ticetown Rd to Poor Farm Rd/Hartle Ln | 1 of 2 | $3,895,814 | Low, 12% under the second |
| 17 SEP 2024 | 25455 | C4 | MTN ORPHAN BRIDGE REP. CENTRAL-2025 | 4 of 5 | $2,172,720 | +14% |
| 12 SEP 2024 | 25454 | N4 | MTN ORPHAN BRIDGE REP. NORTH-2025 | 3 of 4 | $2,487,410 | +30% |
| 05 SEP 2024 | 25456 | S4 | MTN ORPHAN BRIDGE REP. SOUTH-2025 | 2 of 2 | $2,769,340 | +35% |
| 04 JUN 2024 | 23476 | C4 | 2nd Re-Adv MTN Guiderail ET&A, Central and South 2023 | 4 of 7 | $1,788,727 | +9.0% |
| 21 MAY 2024 | 24109 | C1 | Route 36, Thompson Ave (CR 36) | 1 of 2 | $1,553,987 | Low, 22% under the second |
| 15 FEB 2024 | 23159 | N1 | ADA Central, Contract 3 | 1 of 4 | $5,878,274 | Low, 24% under the second |
| 13 JUN 2023 | 23122 | N1 | Route 7, Mill St. (CR 672) to Park Ave. (CR 646) | 6 of 7 | $24,447,369 | +23% |
| 08 JUN 2023 | 23115 | N1 | Squirrelwood Road Bridge over Route 80 | 1 of 3 | $12,241,808 | Low, 1.0% under the second |
| 01 JUN 2023 | 23121 | C1 | Route 34 Bridge over Former Brick Yard Road | 2 of 6 | $1,849,309 | +12% |
| 23 MAY 2023 | 23466 | C4 | MTN ORPHAN BRIDGE REP. CENTRAL-2023 | 5 of 6 | $1,827,114 | +12% |
| 18 MAY 2023 | 23465 | N4 | MTN ORPHAN BRIDGE REP. NORTH-2023 | 5 of 7 | $1,918,714 | +31% |
| 09 MAY 2023 | 23114 | C1 | Route 130, Westfield Ave. to Main Street | 5 of 5 | $21,303,048 | +14% |
| 02 MAY 2023 | 23112 | N1 | Rt 53 Pondview Rd to Hall Ave | 1 of 4 | $5,341,560 | Low, 10% under the second |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.