Power Concrete Co., Inc.: NJDOT bid record

Power Concrete Co., Inc. submitted 19 bids on New Jersey DOT contracts in the data, from 01 MAR 2018 to 19 FEB 2026, and was the low bidder on 8 of them (42%). When it was not low, its total sat a median +28% above the low bid.

Owner
New Jersey DOT
Low bid volume
$51,316,275
Latest bid
19 FEB 2026
Data through
16 APR 2026
19Bids
8Low bids
42Win rate, percent
+28%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
20185360%
20214250%
20233267%
2024300%
20253133%
2026100%
Power Concrete Co., Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
H49556%
C14125%
N1300%
C411100%
S4100%
C4, N411100%
Power Concrete Co., Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Drum159006MU1814 (78%)$1.00$1.00
Traffic control truck with mounted crash cushion159108MU1714 (82%)$500.00$7,000.00
Construction signs159012MSF1913 (68%)$1.00$15.00
Breakaway barricade159003MU1813 (72%)$1.00$1.00
Bridge deck crack sealingMMB088MLF1210 (83%)$5.00$11.00
Traffic cone159009MU149 (64%)$1.00$9.20
Pollution liability insurance152015PDOL139 (69%)$6,100.00$8,500.00
Pressure injection, concrete cracks552003MLF129 (75%)$27.50$138.00
Deck joint reseal (rubber asphalt)MMB090MLF129 (75%)$3.00$18.00
Bridge header repairMMB070MLF129 (75%)$115.00$184.00
Repair concrete curbMMB077MLF129 (75%)$60.00$100.00
E-Z passMMG009MDOL99 (100%)$1.00$1.00
Power Concrete Co., Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Power Concrete Co., Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
19 FEB 202624474H4MTN Pier Protection Contract 2024-13 of 4$3,924,924+48%
15 APR 202525418H4Bridge Preventive MTN and Painting 2025-21 of 4$6,969,164Low, 4.0% under the second
10 APR 202525415H4Bridge Preventive MTN and Painting 2025-12 of 5$10,724,469+28%
28 JAN 202524153C1GROVE AVENUE, BRIDGE OVER PORT READING RAILROAD6 of 11$11,669,358+16%
21 NOV 202423463H4Bridge Preventive Maintenance Contract 2023-22 of 7$9,246,169+17%
03 OCT 202424130C1Rt. 9, Throckmorton Ln/Ticetown Rd to Poor Farm Rd/Hartle Ln2 of 2$4,369,572+12%
15 FEB 202423159N1ADA Central, Contract 34 of 4$7,969,000+36%
19 JAN 202322451H4Bridge Preventive MTN 2022-21 of 5$5,369,379Low, 8.0% under the second
10 JAN 202321410H4Signature Bridge Preventive MTN 2021-12 of 4$8,718,169+6.0%
10 JAN 202322450H4Bridge Preventive MTN 2022-11 of 6$5,966,032Low, 44% under the second
16 MAR 202120467H4Bridge Preventive Maintenance Contract 2020-31 of 8$7,869,924Low, 2.0% under the second
11 MAR 202120465H4Bridge Preventive Maintenance Contract 2020-11 of 6$7,598,174Low, 25% under the second
28 JAN 202120140N1ADA North Contract 22 of 4$2,418,541+12%
07 JAN 202120144N1ADA North, Contract 5; Rt 17 - Terrace Ave To W Saddle River5 of 9$3,099,629+33%
06 DEC 201818467C1Bridge Preventive Maintenance Contract 2018-41 of 4$5,569,624Low, 16% under the second
25 OCT 201818454C4, N4Orphan Bridge Preventive Maintenance Contract 2018-11 of 5$5,449,529Low, 6.0% under the second
23 OCT 201818455S4Bridge Preventive Maintenance Contract 2018-15 of 6$3,469,050+51%
16 OCT 201818456C4Bridge Preventive Maintenance Contract 2018-21 of 6$6,524,449Low, 26% under the second
01 MAR 201818101C1ROUTE 1, BRIDGE OVER ROUTE 1B NB8 of 9$4,444,444+51%
Power Concrete Co., Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy