Power Concrete Co., Inc.: NJDOT bid record
Power Concrete Co., Inc. submitted 19 bids on New Jersey DOT contracts in the data, from 01 MAR 2018 to 19 FEB 2026, and was the low bidder on 8 of them (42%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $51,316,275
- Latest bid
- 19 FEB 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 3 | 60% |
| 2021 | 4 | 2 | 50% |
| 2023 | 3 | 2 | 67% |
| 2024 | 3 | 0 | 0% |
| 2025 | 3 | 1 | 33% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 9 | 5 | 56% |
| C1 | 4 | 1 | 25% |
| N1 | 3 | 0 | 0% |
| C4 | 1 | 1 | 100% |
| S4 | 1 | 0 | 0% |
| C4, N4 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Drum | 159006M | U | 18 | 14 (78%) | $1.00 | $1.00 |
| Traffic control truck with mounted crash cushion | 159108M | U | 17 | 14 (82%) | $500.00 | $7,000.00 |
| Construction signs | 159012M | SF | 19 | 13 (68%) | $1.00 | $15.00 |
| Breakaway barricade | 159003M | U | 18 | 13 (72%) | $1.00 | $1.00 |
| Bridge deck crack sealing | MMB088M | LF | 12 | 10 (83%) | $5.00 | $11.00 |
| Traffic cone | 159009M | U | 14 | 9 (64%) | $1.00 | $9.20 |
| Pollution liability insurance | 152015P | DOL | 13 | 9 (69%) | $6,100.00 | $8,500.00 |
| Pressure injection, concrete cracks | 552003M | LF | 12 | 9 (75%) | $27.50 | $138.00 |
| Deck joint reseal (rubber asphalt) | MMB090M | LF | 12 | 9 (75%) | $3.00 | $18.00 |
| Bridge header repair | MMB070M | LF | 12 | 9 (75%) | $115.00 | $184.00 |
| Repair concrete curb | MMB077M | LF | 12 | 9 (75%) | $60.00 | $100.00 |
| E-Z pass | MMG009M | DOL | 9 | 9 (100%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Berto Construction, Inc. | 17 | 7 of 17 |
| Joseph M. Sanzari, Inc. | 12 | 3 of 12 |
| Iew Construction Group, Inc. | 10 | 2 of 10 |
| Nagi Construction Company | 5 | 1 of 5 |
| Mount Construction Co., Inc. | 5 | 0 of 5 |
| Sparwick Contracting, Inc. | 5 | 1 of 5 |
| Midlantic Construction, LLC | 4 | 1 of 4 |
| Ritacco Construction, Inc. | 3 | 1 of 3 |
| Agate Construction Co., Inc. | 3 | 1 of 3 |
| Orchard Holdings, LLC | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 FEB 2026 | 24474 | H4 | MTN Pier Protection Contract 2024-1 | 3 of 4 | $3,924,924 | +48% |
| 15 APR 2025 | 25418 | H4 | Bridge Preventive MTN and Painting 2025-2 | 1 of 4 | $6,969,164 | Low, 4.0% under the second |
| 10 APR 2025 | 25415 | H4 | Bridge Preventive MTN and Painting 2025-1 | 2 of 5 | $10,724,469 | +28% |
| 28 JAN 2025 | 24153 | C1 | GROVE AVENUE, BRIDGE OVER PORT READING RAILROAD | 6 of 11 | $11,669,358 | +16% |
| 21 NOV 2024 | 23463 | H4 | Bridge Preventive Maintenance Contract 2023-2 | 2 of 7 | $9,246,169 | +17% |
| 03 OCT 2024 | 24130 | C1 | Rt. 9, Throckmorton Ln/Ticetown Rd to Poor Farm Rd/Hartle Ln | 2 of 2 | $4,369,572 | +12% |
| 15 FEB 2024 | 23159 | N1 | ADA Central, Contract 3 | 4 of 4 | $7,969,000 | +36% |
| 19 JAN 2023 | 22451 | H4 | Bridge Preventive MTN 2022-2 | 1 of 5 | $5,369,379 | Low, 8.0% under the second |
| 10 JAN 2023 | 21410 | H4 | Signature Bridge Preventive MTN 2021-1 | 2 of 4 | $8,718,169 | +6.0% |
| 10 JAN 2023 | 22450 | H4 | Bridge Preventive MTN 2022-1 | 1 of 6 | $5,966,032 | Low, 44% under the second |
| 16 MAR 2021 | 20467 | H4 | Bridge Preventive Maintenance Contract 2020-3 | 1 of 8 | $7,869,924 | Low, 2.0% under the second |
| 11 MAR 2021 | 20465 | H4 | Bridge Preventive Maintenance Contract 2020-1 | 1 of 6 | $7,598,174 | Low, 25% under the second |
| 28 JAN 2021 | 20140 | N1 | ADA North Contract 2 | 2 of 4 | $2,418,541 | +12% |
| 07 JAN 2021 | 20144 | N1 | ADA North, Contract 5; Rt 17 - Terrace Ave To W Saddle River | 5 of 9 | $3,099,629 | +33% |
| 06 DEC 2018 | 18467 | C1 | Bridge Preventive Maintenance Contract 2018-4 | 1 of 4 | $5,569,624 | Low, 16% under the second |
| 25 OCT 2018 | 18454 | C4, N4 | Orphan Bridge Preventive Maintenance Contract 2018-1 | 1 of 5 | $5,449,529 | Low, 6.0% under the second |
| 23 OCT 2018 | 18455 | S4 | Bridge Preventive Maintenance Contract 2018-1 | 5 of 6 | $3,469,050 | +51% |
| 16 OCT 2018 | 18456 | C4 | Bridge Preventive Maintenance Contract 2018-2 | 1 of 6 | $6,524,449 | Low, 26% under the second |
| 01 MAR 2018 | 18101 | C1 | ROUTE 1, BRIDGE OVER ROUTE 1B NB | 8 of 9 | $4,444,444 | +51% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.