Orchard Holdings, LLC: NJDOT bid record
Orchard Holdings, LLC submitted 69 bids on New Jersey DOT contracts in the data, from 07 DEC 2017 to 14 APR 2026, and was the low bidder on 45 of them (65%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $108,609,902
- Latest bid
- 14 APR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 1 | 100% |
| 2018 | 7 | 5 | 71% |
| 2019 | 8 | 4 | 50% |
| 2020 | 7 | 4 | 57% |
| 2021 | 14 | 10 | 71% |
| 2022 | 7 | 4 | 57% |
| 2023 | 7 | 6 | 86% |
| 2024 | 8 | 4 | 50% |
| 2025 | 5 | 2 | 40% |
| 2026 | 5 | 5 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 35 | 28 | 80% |
| N1 | 14 | 4 | 29% |
| S1 | 12 | 6 | 50% |
| N4 | 4 | 4 | 100% |
| C1 | 2 | 1 | 50% |
| H1 | 1 | 1 | 100% |
| N1, N4 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Force account | 109006M | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| 1 1/2" rigid metallic conduit | 701012P | LF | 34 | 30 (88%) | $20.00 | $55.00 |
| Turf pavers | 606095P | SY | 30 | 26 (87%) | $192.75 | $250.00 |
| Foundation, type SFT | 701123M | U | 36 | 25 (69%) | $2,030.00 | $2,400.00 |
| 12" X 10" X 8" metal junction box | 701108M | U | 29 | 25 (86%) | $720.00 | $1,700.00 |
| Foundation, type SPF | 701135M | U | 28 | 21 (75%) | $1,482.50 | $1,800.00 |
| Foundation, type SFK | 701144M | U | 26 | 20 (77%) | $2,410.00 | $2,600.00 |
| Ground wire, no. 8 AWG | 701192P | LF | 42 | 19 (45%) | $3.08 | $2.60 |
| 3" rigid metallic conduit | 701021P | LF | 39 | 19 (49%) | $86.25 | $65.00 |
| 18" X 36" junction box | 701102M | U | 30 | 19 (63%) | $2,387.50 | $2,520.00 |
| Multiple lighting wire, no. 4 AWG | 701196P | LF | 24 | 19 (79%) | $1.00 | $4.80 |
| Multiple lighting wire, no. 8 AWG | 701201P | LF | 36 | 18 (50%) | $3.50 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Daidone Electric, Inc. | 52 | 11 of 52 |
| HBC Company, Inc. | 17 | 3 of 17 |
| Berto Construction, Inc. | 11 | 7 of 11 |
| Iew Construction Group, Inc. | 4 | 1 of 4 |
| PKF-Mark III, Inc. | 4 | 1 of 4 |
| New Prince Concrete Construction Co., Inc. | 3 | 1 of 3 |
| Joseph M. Sanzari, Inc. | 3 | 1 of 3 |
| South State, Inc. | 3 | 1 of 3 |
| Power Concrete Co., Inc. | 3 | 0 of 3 |
| Diehl Electric Company, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 APR 2026 | 26444 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2026 | 1 of 2 | $760,183 | Low, 69% under the second |
| 09 APR 2026 | 26443 | H4 | TRAFFIC SIGNAL RELAMPING NORTH - 2026 | 1 of 2 | $654,221 | Low, 83% under the second |
| 31 MAR 2026 | 26442 | H4 | Electrical Underground Structures South 2026 | 1 of 2 | $817,393 | Low, 12% under the second |
| 26 MAR 2026 | 26441 | H4 | Electrical Underground Structures North 2026 | 1 of 2 | $826,918 | Low, 32% under the second |
| 17 FEB 2026 | 25138 | N1 | Rt 17, CR 130 Orient Way to Rt 80 & Rt 120, CR 503 to Rt 17 | 1 of 4 | $1,884,664 | Low, 26% under the second |
| 25 NOV 2025 | 25603 | S1 | Rt 73, Pinehurst Drive to Haddonfield Rd (CR644) | 1 of 2 | $10,997,262 | Low, 20% under the second |
| 30 OCT 2025 | 25601 | N1 | Smart Moves 2021 North | 2 of 4 | $17,156,859 | +17% |
| 23 OCT 2025 | 25602 | N1 | Rt 80, White Meadow Road to Riverview Drive (CR 640), C#1 | 4 of 5 | $8,944,767 | +50% |
| 11 MAR 2025 | 25444 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2025 | 2 of 3 | $1,986,067 | +13% |
| 06 MAR 2025 | 25443 | H4 | TRAFFIC SIGNAL RELAMPING NORTH - 2025 | 1 of 2 | $2,366,626 | Low, 5.0% under the second |
| 17 OCT 2024 | 24149 | N1 | Rt 23, Rt 80 to CR 694 (Paterson Hamburg Turnpike), ATS C#1 | 3 of 3 | $21,245,636 | +15% |
| 10 SEP 2024 | 24471 | H4 | RE-ADV Electrical Underground Structures South 2024 | 1 of 1 | $1,498,104 | Low |
| 05 SEP 2024 | 24470 | H4 | RE-ADV Electrical Underground Structures North 2024 | 1 of 2 | $1,425,549 | Low, 25% under the second |
| 30 MAY 2024 | 24106 | C1 | Rt 18 Naricon Pl to Knightsbridge R/Rt 287 SB Ramp ATS C#2 | 1 of 3 | $9,932,737 | Low, 14% under the second |
| 26 MAR 2024 | 24444 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2024 | 2 of 2 | $1,177,737 | +7.0% |
| 21 MAR 2024 | 24443 | H4 | TRAFFIC SIGNAL RELAMPING NORTH - 2024 | 1 of 1 | $1,085,936 | Low |
| 29 FEB 2024 | 22411 | H4 | MTN Route 29 Tunnel Lighting System Improvement | 2 of 3 | $5,396,660 | +16% |
| 15 FEB 2024 | 23159 | N1 | ADA Central, Contract 3 | 3 of 4 | $7,540,706 | +28% |
| 06 JUN 2023 | 23123 | N1 | Route 46, Main St./Woodstone Rd. (CR 644) to Rt. 287, ITS | 1 of 3 | $21,372,186 | Low, 6.0% under the second |
| 11 MAY 2023 | 23601 | H4 | ITS Maintenance Job Order Contract Statewide - 2023 | 1 of 3 | $6,208,091 | Low, 12% under the second |
| 20 APR 2023 | 23600 | S1 | Route 38 ATS C#1, Part A, MP 0.64 to MP 5.75 | 2 of 2 | $6,797,508 | +7.0% |
| 21 MAR 2023 | 23442 | H4 | Electrical Underground Structures South 2023 | 1 of 2 | $1,094,583 | Low, 27% under the second |
| 16 MAR 2023 | 23441 | H4 | Electrical Underground Structures North 2023 | 1 of 2 | $1,398,165 | Low, 51% under the second |
| 14 MAR 2023 | 23444 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2023 | 1 of 3 | $1,281,907 | Low, 5.0% under the second |
| 09 MAR 2023 | 23443 | H4 | TRAFFIC SIGNAL RELAMPING NORTH - 2023 | 1 of 2 | $1,195,422 | Low, 134% under the second |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.