Orchard Holdings, LLC: NJDOT bid record

Orchard Holdings, LLC submitted 69 bids on New Jersey DOT contracts in the data, from 07 DEC 2017 to 14 APR 2026, and was the low bidder on 45 of them (65%). When it was not low, its total sat a median +11% above the low bid.

Owner
New Jersey DOT
Low bid volume
$108,609,902
Latest bid
14 APR 2026
Data through
16 APR 2026
69Bids
45Low bids
65Win rate, percent
+11%Median gap to the low bid when not low, 24 bids

By year

YearBidsLow bidsWin rate
201711100%
20187571%
20198450%
20207457%
2021141071%
20227457%
20237686%
20248450%
20255240%
202655100%
Orchard Holdings, LLC, NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
H4352880%
N114429%
S112650%
N444100%
C12150%
H111100%
N1, N411100%
Orchard Holdings, LLC, NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Force account109006MDOL3232 (100%)$1.00$1.00
1 1/2" rigid metallic conduit701012PLF3430 (88%)$20.00$55.00
Turf pavers606095PSY3026 (87%)$192.75$250.00
Foundation, type SFT701123MU3625 (69%)$2,030.00$2,400.00
12" X 10" X 8" metal junction box701108MU2925 (86%)$720.00$1,700.00
Foundation, type SPF701135MU2821 (75%)$1,482.50$1,800.00
Foundation, type SFK701144MU2620 (77%)$2,410.00$2,600.00
Ground wire, no. 8 AWG701192PLF4219 (45%)$3.08$2.60
3" rigid metallic conduit701021PLF3919 (49%)$86.25$65.00
18" X 36" junction box701102MU3019 (63%)$2,387.50$2,520.00
Multiple lighting wire, no. 4 AWG701196PLF2419 (79%)$1.00$4.80
Multiple lighting wire, no. 8 AWG701201PLF3618 (50%)$3.50$3.00
Orchard Holdings, LLC, NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Daidone Electric, Inc.5211 of 52
HBC Company, Inc.173 of 17
Berto Construction, Inc.117 of 11
Iew Construction Group, Inc.41 of 4
PKF-Mark III, Inc.41 of 4
New Prince Concrete Construction Co., Inc.31 of 3
Joseph M. Sanzari, Inc.31 of 3
South State, Inc.31 of 3
Power Concrete Co., Inc.30 of 3
Diehl Electric Company, Inc.32 of 3
Orchard Holdings, LLC, NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
14 APR 202626444H4TRAFFIC SIGNAL RELAMPING SOUTH 20261 of 2$760,183Low, 69% under the second
09 APR 202626443H4TRAFFIC SIGNAL RELAMPING NORTH - 20261 of 2$654,221Low, 83% under the second
31 MAR 202626442H4Electrical Underground Structures South 20261 of 2$817,393Low, 12% under the second
26 MAR 202626441H4Electrical Underground Structures North 20261 of 2$826,918Low, 32% under the second
17 FEB 202625138N1Rt 17, CR 130 Orient Way to Rt 80 & Rt 120, CR 503 to Rt 171 of 4$1,884,664Low, 26% under the second
25 NOV 202525603S1Rt 73, Pinehurst Drive to Haddonfield Rd (CR644)1 of 2$10,997,262Low, 20% under the second
30 OCT 202525601N1Smart Moves 2021 North2 of 4$17,156,859+17%
23 OCT 202525602N1Rt 80, White Meadow Road to Riverview Drive (CR 640), C#14 of 5$8,944,767+50%
11 MAR 202525444H4TRAFFIC SIGNAL RELAMPING SOUTH 20252 of 3$1,986,067+13%
06 MAR 202525443H4TRAFFIC SIGNAL RELAMPING NORTH - 20251 of 2$2,366,626Low, 5.0% under the second
17 OCT 202424149N1Rt 23, Rt 80 to CR 694 (Paterson Hamburg Turnpike), ATS C#13 of 3$21,245,636+15%
10 SEP 202424471H4RE-ADV Electrical Underground Structures South 20241 of 1$1,498,104Low
05 SEP 202424470H4RE-ADV Electrical Underground Structures North 20241 of 2$1,425,549Low, 25% under the second
30 MAY 202424106C1Rt 18 Naricon Pl to Knightsbridge R/Rt 287 SB Ramp ATS C#21 of 3$9,932,737Low, 14% under the second
26 MAR 202424444H4TRAFFIC SIGNAL RELAMPING SOUTH 20242 of 2$1,177,737+7.0%
21 MAR 202424443H4TRAFFIC SIGNAL RELAMPING NORTH - 20241 of 1$1,085,936Low
29 FEB 202422411H4MTN Route 29 Tunnel Lighting System Improvement2 of 3$5,396,660+16%
15 FEB 202423159N1ADA Central, Contract 33 of 4$7,540,706+28%
06 JUN 202323123N1Route 46, Main St./Woodstone Rd. (CR 644) to Rt. 287, ITS1 of 3$21,372,186Low, 6.0% under the second
11 MAY 202323601H4ITS Maintenance Job Order Contract Statewide - 20231 of 3$6,208,091Low, 12% under the second
20 APR 202323600S1Route 38 ATS C#1, Part A, MP 0.64 to MP 5.752 of 2$6,797,508+7.0%
21 MAR 202323442H4Electrical Underground Structures South 20231 of 2$1,094,583Low, 27% under the second
16 MAR 202323441H4Electrical Underground Structures North 20231 of 2$1,398,165Low, 51% under the second
14 MAR 202323444H4TRAFFIC SIGNAL RELAMPING SOUTH 20231 of 3$1,281,907Low, 5.0% under the second
09 MAR 202323443H4TRAFFIC SIGNAL RELAMPING NORTH - 20231 of 2$1,195,422Low, 134% under the second
Orchard Holdings, LLC: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way