Daidone Electric, Inc. submitted 57 bids on New Jersey DOT contracts in the data, from 07 DEC 2017 to 14 APR 2026, and was the low bidder on 11 of them (19%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $81,727,758
- Latest bid
- 14 APR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 0 | 0% |
| 2018 | 7 | 2 | 29% |
| 2019 | 6 | 2 | 33% |
| 2020 | 4 | 1 | 25% |
| 2021 | 11 | 2 | 18% |
| 2022 | 6 | 1 | 17% |
| 2023 | 6 | 0 | 0% |
| 2024 | 5 | 1 | 20% |
| 2025 | 6 | 2 | 33% |
| 2026 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| H4 | 33 | 5 | 15% |
| N1 | 12 | 5 | 42% |
| S1 | 4 | 1 | 25% |
| N4 | 4 | 0 | 0% |
| H1 | 2 | 0 | 0% |
| N1, N4 | 1 | 0 | 0% |
| C1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Performance bond and payment bond | 151006M | DOL | 47 | 38 (81%) | $18,800 | $32,468 |
| Force account | 109006M | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Excavation, test pit | 202006M | CY | 22 | 16 (73%) | $100.00 | $200.00 |
| Temporary sheeting | 501003P | SF | 26 | 14 (54%) | $16.00 | $18.06 |
| Tomography | 503051M | U | 20 | 14 (70%) | $650.00 | $825.00 |
| Obstruction removal | 503048M | LF | 21 | 12 (57%) | $400.00 | $430.00 |
| Traffic control truck with mounted crash cushion | 159108M | U | 13 | 12 (92%) | $5,000.00 | $7,000.00 |
| Foundation, type 2M | 701156M | U | 14 | 11 (79%) | $400.00 | $1,300.00 |
| 2" rigid metallic conduit | 701015P | LF | 29 | 10 (34%) | $65.00 | $50.57 |
| Shaft coring | 503015M | LF | 21 | 10 (48%) | $80.00 | $100.00 |
| Highway lighting relamping | MME024M | U | 16 | 10 (63%) | $221.00 | $268.00 |
| 9" X 16" concrete vertical curb | 607018P | LF | 23 | 9 (39%) | $80.00 | $60.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Orchard Holdings, LLC | 52 | 41 of 52 |
| HBC Company, Inc. | 16 | 5 of 16 |
| PKF-Mark III, Inc. | 5 | 0 of 5 |
| Iew Construction Group, Inc. | 4 | 1 of 4 |
| Joseph M. Sanzari, Inc. | 4 | 4 of 4 |
| Berto Construction, Inc. | 3 | 2 of 3 |
| Tiffany Electric, Inc. | 3 | 2 of 3 |
| Allan Briteway Electrical Utility Contractors, Inc. | 2 | 1 of 2 |
| Union Paving & Construction Co., Inc. | 2 | 1 of 2 |
| Nagi Construction Company | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 APR 2026 | 26444 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2026 | 2 of 2 | $1,282,000 | +69% |
| 09 APR 2026 | 26443 | H4 | TRAFFIC SIGNAL RELAMPING NORTH - 2026 | 2 of 2 | $1,198,000 | +83% |
| 31 MAR 2026 | 26442 | H4 | Electrical Underground Structures South 2026 | 2 of 2 | $914,000 | +12% |
| 26 MAR 2026 | 26441 | H4 | Electrical Underground Structures North 2026 | 2 of 2 | $1,088,000 | +32% |
| 17 FEB 2026 | 25138 | N1 | Rt 17, CR 130 Orient Way to Rt 80 & Rt 120, CR 503 to Rt 17 | 3 of 4 | $2,886,000 | +53% |
| 09 DEC 2025 | 26463 | H4 | MTN Anit-Theft Junction Box Lid Replacement 2026 | 4 of 4 | $1,498,000 | +203% |
| 30 OCT 2025 | 25601 | N1 | Smart Moves 2021 North | 1 of 4 | $14,718,000 | Low, 17% under the second |
| 23 OCT 2025 | 25602 | N1 | Rt 80, White Meadow Road to Riverview Drive (CR 640), C#1 | 1 of 5 | $5,958,000 | Low, 11% under the second |
| 15 APR 2025 | 25600 | H4 | 2026 WORLD CUP ITS IMPROVEMENTS | 2 of 4 | $27,878,000 | +36% |
| 11 MAR 2025 | 25444 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2025 | 3 of 3 | $2,068,000 | +18% |
| 06 MAR 2025 | 25443 | H4 | TRAFFIC SIGNAL RELAMPING NORTH - 2025 | 2 of 2 | $2,486,000 | +5.0% |
| 31 OCT 2024 | 24127 | N1 | NEVI Electric Vehicle Infrastru Deployment Alternative Fuel | 2 of 2 | $44,156,000 | +111% |
| 17 OCT 2024 | 24149 | N1 | Rt 23, Rt 80 to CR 694 (Paterson Hamburg Turnpike), ATS C#1 | 2 of 3 | $19,398,000 | +5.0% |
| 05 SEP 2024 | 24470 | H4 | RE-ADV Electrical Underground Structures North 2024 | 2 of 2 | $1,784,000 | +25% |
| 30 MAY 2024 | 24106 | C1 | Rt 18 Naricon Pl to Knightsbridge R/Rt 287 SB Ramp ATS C#2 | 2 of 3 | $11,368,000 | +14% |
| 29 FEB 2024 | 22411 | H4 | MTN Route 29 Tunnel Lighting System Improvement | 1 of 3 | $4,658,000 | Low, 16% under the second |
| 06 JUN 2023 | 23123 | N1 | Route 46, Main St./Woodstone Rd. (CR 644) to Rt. 287, ITS | 3 of 3 | $24,398,000 | +14% |
| 11 MAY 2023 | 23601 | H4 | ITS Maintenance Job Order Contract Statewide - 2023 | 3 of 3 | $8,770,869 | +41% |
| 21 MAR 2023 | 23442 | H4 | Electrical Underground Structures South 2023 | 2 of 2 | $1,388,000 | +27% |
| 16 MAR 2023 | 23441 | H4 | Electrical Underground Structures North 2023 | 2 of 2 | $2,116,000 | +51% |
| 14 MAR 2023 | 23444 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2023 | 3 of 3 | $2,500,000 | +95% |
| 09 MAR 2023 | 23443 | H4 | TRAFFIC SIGNAL RELAMPING NORTH - 2023 | 2 of 2 | $2,798,000 | +134% |
| 03 NOV 2022 | 22141 | N1 | RT 46, RT 287 TO RT 23 (POMPTON AVENUE), ITS (CENTRAL) | 1 of 3 | $21,460,000 | Low, 2.0% under the second |
| 01 NOV 2022 | 22148 | N1 | Route 46, Route 23 (Pompton Ave.) to Route 20, ITS | 4 of 4 | $13,874,000 | +8.0% |
| 15 MAR 2022 | 22430 | H4 | TRAFFIC SIGNAL RELAMPING SOUTH 2022 | 2 of 2 | $1,698,000 | +13% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.