| 0001 | Performance bond and payment bond (151006M) | DOL | 1 | $16,000 | $18,000 |
| 0002 | Pollution liability insurance (152015P) | DOL | 1 | $11,000 | $12,000 |
| 0003 | Progress schedule (153003P) | LS | 1 | $5,000.00 | $15,000 |
| 0004 | Progress schedule update (153005M) | U | 4 | $500.00 | $500.00 |
| 0005 | Trainees (153011M) | HR | 2,420 | $0.01 | $1.00 |
| 0006 | Mobilization (154003P) | LS | 1 | $279,000 | $300,000 |
| 0007 | Field office type F set UP (155018M) | U | 1 | $30,000 | $60,000 |
| 0008 | Field office type F maintenance (155036M) | MO | 9 | $3,500.00 | $4,000.00 |
| 0009 | Heavy duty silt fence, orange (158009M) | LF | 2,020 | $0.01 | $8.00 |
| 0010 | Inlet filter type 2, 2' X 4' (158030M) | U | 4 | $100.00 | $125.00 |
| 0011 | Concrete washout system (158063P) | LS | 1 | $5,000.00 | $5,000.00 |
| 0012 | Oil only emergency spill kit, type 1 (158072M) | U | 1 | $1,000.00 | $2,000.00 |
| 0013 | Erosion control sediment removal (158084M) | CY | 200 | $0.01 | $0.01 |
| 0014 | Breakaway barricade (159003M) | U | 50 | $0.01 | $1.00 |
| 0015 | Drum (159006M) | U | 150 | $0.01 | $1.00 |
| 0016 | Emergency traffic control (159007M) | DOL | 1 | $1.00 | $5,000.00 |
| 0017 | Construction signs (159012M) | SF | 807 | $16.00 | $20.00 |
| 0018 | Construction identification sign, 4' X 8' (159015M) | U | 2 | $950.00 | $1,500.00 |
| 0019 | Construction barrier curb (159021P) | LF | 750 | $0.01 | $85.00 |
| 0020 | Arrow board, 4' X 8' (159027M) | U | 2 | $0.01 | $5,000.00 |
| 0021 | Portable variable message sign (159030M) | U | 2 | $0.01 | $15,000 |
| 0022 | Traffic control truck with mounted crash cushion (159108M) | U | 4 | $0.01 | $1,000.00 |
| 0023 | HMA patch (159138M) | T | 1 | $1,000.00 | $300.00 |
| 0024 | Traffic director, flagger (159141M) | HR | 100 | $0.01 | $135.00 |
| 0025 | Emergency towing service (159144M) | U | 1 | $0.01 | $1.00 |
| 0026 | Temporary crash cushion, compressive barrier, type 2, width narrow (159200M) | U | 1 | $0.01 | $15,000 |
| 0027 | Construction identification sign, iija 6' X 4' (159260M) | U | 2 | $900.00 | $1,500.00 |
| 0028 | Fuel price adjustment (160004M) | DOL | 1 | $1,300.00 | $1,300.00 |
| 0029 | Asphalt price adjustment (160007M) | DOL | 1 | $2,700.00 | $2,700.00 |
| 0030 | Steel price adjustment (160009M) | DOL | 1 | $100.00 | $100.00 |
| 0031 | Final cleanup (161003P) | LS | 1 | $25,000 | $10,000 |
| 0032 | Clearing site (201003P) | LS | 1 | $50,000 | $50,000 |
| 0033 | Stripping (202003P) | ACRE | 0.30 | $30,000 | $1.00 |
| 0034 | Excavation, test pit (202006M) | CY | 5 | $550.00 | $200.00 |
| 0035 | Excavation, unclassified (202009P) | CY | 952 | $105.00 | $43.00 |
| 0036 | I-14 soil aggregate (203021P) | CY | 91 | $200.00 | $1.00 |
| 0037 | Geotextile, roadway stabilization (203041P) | SY | 573 | $7.00 | $4.00 |
| 0038 | Dense-graded aggregate base course, 10" thick (302045P) | SY | 440 | $46.00 | $15.00 |
| 0039 | Dense-graded aggregate base course, 12" thick (302048P) | SY | 224 | $49.00 | $20.00 |
| 0040 | HMA milling, 3" or less (401009P) | SY | 10,915 | $7.75 | $7.00 |
| 0041 | Polymerized joint adhesive (401027M) | LF | 13,125 | $1.65 | $0.75 |
| 0042 | Tack coat (401030M) | GAL | 1,400 | $5.00 | $0.01 |
| 0043 | Hot mix asphalt 9.5 M E surface course (401049M) | T | 976 | $160.00 | $146.00 |
| 0044 | Hot mix asphalt 9.5 M 64 intermediate course (401066M) | T | 976 | $155.00 | $140.00 |
| 0045 | Hot mix asphalt 25 M 64 base course (401099M) | T | 300 | $230.00 | $135.00 |
| 0046 | Core samples, hot mix asphalt (401108M) | U | 20 | $325.00 | $250.00 |
| 0047 | Full depth concrete pavement repair, HMA (453006M) | SY | 1 | $1,000.00 | $500.00 |
| 0048 | 18" reinforced concrete pipe (601124P) | LF | 108 | $165.00 | $120.00 |
| 0049 | Inlet, type B (602012M) | U | 2 | $9,200.00 | $6,000.00 |
| 0050 | Reset existing casting (602099M) | U | 2 | $750.00 | $1,000.00 |
| 0051 | Chain-link fence, aluminum- coated steel, 4' high (605003P) | LF | 395 | $75.00 | $58.00 |
| 0052 | Hot mix asphalt sidewalk, 5" thick (606006P) | SY | 9 | $140.00 | $75.00 |
| 0053 | Concrete sidewalk, 4" thick (606012P) | SY | 1,175 | $138.00 | $135.00 |
| 0054 | Concrete island, 4" thick (606075P) | SY | 131 | $191.00 | $135.00 |
| 0055 | Detectable warning surface (606084P) | SY | 22 | $225.00 | $300.00 |
| 0056 | 9" X 16" concrete vertical curb (607018P) | LF | 2,101 | $55.00 | $80.00 |
| 0057 | 9" X variable height concrete vertical curb (607069P) | LF | 154 | $60.00 | $80.00 |
| 0058 | Sawcut vertical curb (607120P) | LF | 500 | $0.01 | $1.00 |
| 0059 | Nonvegetative surface, hot mix asphalt (608003P) | SY | 88 | $70.00 | $60.00 |
| 0060 | Beam guide rail (609003M) | LF | 600 | $32.00 | $36.00 |
| 0061 | Beam guide rail anchorage (609039M) | U | 5 | $3,000.00 | $3,400.00 |
| 0062 | Traffic stripes, 4" (610003M) | LF | 7,227 | $0.60 | $0.70 |
| 0063 | Traffic stripes, 8" (610007M) | LF | 1,456 | $1.10 | $1.30 |
| 0064 | Traffic marking lines, 8" (610014M) | LF | 865 | $1.75 | $2.00 |
| 0065 | Traffic marking lines, 12" (610016M) | LF | 215 | $2.65 | $3.00 |
| 0066 | Traffic marking lines, 24" (610017M) | LF | 1,212 | $5.25 | $6.00 |
| 0067 | Traffic markings symbols (610060M) | SF | 764 | $9.00 | $10.00 |
| 0068 | Regulatory and warning sign (612003P) | SF | 314.55 | $42.00 | $54.00 |
| 0069 | Relocate sign (612021M) | U | 32 | $150.00 | $300.00 |
| 0070 | Reset water valve box (651255M) | U | 10 | $40.00 | $50.00 |
| 0071 | Reset gas valve box (653084M) | U | 10 | $40.00 | $50.00 |
| 0072 | 3" rigid metallic conduit (701021P) | LF | 626 | $85.00 | $86.00 |
| 0073 | 18" X 36" junction box (701102M) | U | 6 | $3,750.00 | $3,450.00 |
| 0074 | Foundation, type SFT (701123M) | U | 1 | $3,600.00 | $3,700.00 |
| 0075 | Foundation, type P-MC modified (701128M) | U | 1 | $6,550.00 | $5,800.00 |
| 0076 | Foundation, type SPF (701135M) | U | 4 | $2,400.00 | $3,450.00 |
| 0077 | Foundation, type STF (701138M) | U | 1 | $12,000 | $12,700 |
| 0078 | Foundation, type SFK (701144M) | U | 2 | $3,750.00 | $4,600.00 |
| 0079 | Meter cabinet, type TL (701171M) | U | 1 | $7,000.00 | $3,750.00 |
| 0080 | Ground wire, no. 8 AWG (701192P) | LF | 514 | $0.01 | $3.00 |
| 0081 | Service wire, no. 6 AWG (701213P) | LF | 324 | $0.01 | $4.00 |
| 0082 | Controller, 8 phase (702009M) | U | 1 | $30,000 | $27,000 |
| 0083 | Traffic signal standard, aluminum (702012M) | U | 3 | $4,750.00 | $5,000.00 |
| 0084 | Traffic signal standard, steel (702015M) | U | 1 | $7,700.00 | $8,500.00 |
| 0085 | Pedestrian signal standard (702018M) | U | 4 | $1,600.00 | $1,350.00 |
| 0086 | Traffic signal mast arm, aluminum (702021M) | U | 3 | $4,750.00 | $3,800.00 |
| 0087 | Traffic signal mast arm, steel (702024M) | U | 1 | $8,650.00 | $7,800.00 |
| 0088 | Traffic signal cable, 2 conductor (702027P) | LF | 1,288 | $0.01 | $3.00 |
| 0089 | Traffic signal cable, 5 conductor (702030P) | LF | 1,288 | $0.01 | $4.00 |
| 0090 | Traffic signal cable, 10 conductor (702033P) | LF | 2,071 | $0.01 | $5.00 |
| 0091 | Traffic signal head (702036M) | U | 10 | $1,600.00 | $1,500.00 |
| 0092 | Pedestrian signal head (702039M) | U | 6 | $1,200.00 | $1,050.00 |
| 0093 | Push button (702042M) | U | 6 | $2,100.00 | $1,800.00 |
| 0094 | Radar detector (702046M) | U | 3 | $13,750 | $13,000 |
| 0095 | Generator auxiliary cabinet (702050M) | U | 1 | $9,500.00 | $6,900.00 |
| 0096 | Interim traffic signal system, location no. ___ NA (702057M) | LS | 1 | $0.01 | $1.00 |
| 0097 | Controller turn-on (702060M) | U | 1 | $16,000 | $6,700.00 |
| 0098 | Uninterruptible power supply (702101M) | U | 1 | $5,300.00 | $2,900.00 |
| 0099 | Selective clearing (801012M) | SY | 1,547 | $17.00 | $23.00 |
| 0100 | Topsoil spreading __" thick (804000P) | SY | 1,320 | $11.00 | $6.00 |
| 0101 | Plant pit soil (804014P) | CY | 6 | $158.00 | $200.00 |
| 0102 | Fertilizing and seeding, type A (806003P) | SY | 1,320 | $2.00 | $2.30 |
| 0103 | Straw mulching (809003M) | SY | 1,320 | $1.00 | $2.00 |
| 0104 | Wood mulching (809018M) | SY | 20 | $8.50 | $60.00 |
| 0105 | Mowing (810006M) | SY | 2,640 | $0.25 | $2.50 |
| 0106 | Small deciduous tree, 2-2 1/2" caliper, B&B (811024M) | U | 14 | $650.00 | $1,000.00 |
| 0107 | Plant establishment and maintenance period (811138M) | LS | 1 | $5,500.00 | $9,000.00 |
| 0108 | Watering (811165M) | MG | 2 | $320.00 | $1,100.00 |