Green Construction, Inc.: NJDOT bid record

Green Construction, Inc. submitted 47 bids on New Jersey DOT contracts in the data, from 05 OCT 2017 to 19 FEB 2026, and was the low bidder on 7 of them (15%). When it was not low, its total sat a median +18% above the low bid.

Owner
New Jersey DOT
Low bid volume
$76,758,526
Latest bid
19 FEB 2026
Data through
16 APR 2026
47Bids
7Low bids
15Win rate, percent
+18%Median gap to the low bid when not low, 40 bids

By year

YearBidsLow bidsWin rate
2017600%
201810220%
20195120%
2020700%
20214125%
202211100%
20236233%
2024200%
2025400%
2026200%
Green Construction, Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
C126415%
N110220%
S18113%
C4200%
H4100%
Green Construction, Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Fuel price adjustment160004MDOL4242 (100%)$10,000$2,700.00
Asphalt price adjustment160007MDOL4242 (100%)$20,150$10,200
Prime coat401036MGAL2626 (100%)$0.01$0.01
Detectable warning surface606084PSY2920 (69%)$150.00$300.00
Excavation, unclassified202009PCY5819 (33%)$51.00$78.60
Removal of RPM610024MU3118 (58%)$5.00$10.00
Construction signs159012MSF4717 (36%)$14.00$15.00
Polymerized joint adhesive401027MLF4517 (38%)$0.50$0.52
Performance bond and payment bond151006MDOL4515 (33%)$35,000$32,468
Inlet, type B602012MU2115 (71%)$5,000.00$6,000.00
3" rigid metallic conduit701021PLF4313 (30%)$58.00$65.00
RPM, mono-directional, white lens610012MU3913 (33%)$30.00$34.65
Green Construction, Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Green Construction, Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
19 FEB 202624474H4MTN Pier Protection Contract 2024-12 of 4$3,845,528+45%
27 JAN 202625129C1ADA Central, Contract 12 of 4$23,393,723+5.0%
23 OCT 202525134C1RT 35, BRIDGE OVER NORTH BRANCH OF WRECK POND5 of 5$11,664,596+41%
07 OCT 202525126C1RT 202 AND FIRST AVENUE INTERSECTION IMPROVEMENTS3 of 4$14,138,654+24%
19 JUN 202525112C1Rt 287 SB, Burnt Mills Road (CR 620) to Bailey's Mill Road4 of 6$24,614,650+19%
29 MAY 202525104S1ROUTE 130, CR 545 (FARNSWORTH AVENUE) INT Improvements4 of 5$12,376,064+36%
17 OCT 202424141C1Route 31 SB CR 523 (Walter Foran Blvd) to Wescott Dr(CR 600)3 of 4$4,306,616+18%
04 JUN 202424107C1Route 66, Jumping Brook Road to Bowne Road / Wayside Road8 of 8$54,379,315+40%
05 OCT 202323144C1Route 31, 78/22 to Graysrock Road1 of 3$24,819,000Low, 17% under the second
03 AUG 202323128N1Route 57, Lopatcong Creek, Culvert Replacement2 of 2$8,622,222+6.0%
13 JUN 202323122N1Route 7, Mill St. (CR 672) to Park Ave. (CR 646)5 of 7$23,776,512+20%
01 JUN 202323121C1Route 34 Bridge over Former Brick Yard Road6 of 6$2,712,012+64%
18 MAY 202323418N1MTN GR End Treatment and Attenuator Project, North - 20233 of 3$3,949,000+146%
02 MAY 202323113N1Route 46, Route 80 to Walnut Road1 of 4$14,468,468Low, 10% under the second
12 APR 202222103S1Rt 206, Monmouth Rd (C.R. 537) & Juliustown Rd (C.R. 669)1 of 8$6,255,000Low, 0.0% under the second
21 OCT 202121138N1Route 27, Dehart Place to Route 213 of 3$28,865,865+14%
19 OCT 202121135N1ROUTE 23 HARDYSTON TOWNSHIP IMPROVEMENTS1 of 3$9,737,256Low, 0.0% under the second
22 JUL 202121130C1Route 130, Route 206 to CR 526 (Robbinsville/Allentown Road)3 of 5$5,147,147+2.0%
13 APR 202121405C4Maintenance Roadway Contract C215, DP 214054 of 7$10,857,198+4.0%
05 NOV 202020130C1ROUTE 72 MANAHAWKIN BAY BRIDGES3 of 9$35,824,000+6.0%
29 OCT 202020129C1RT 33, Cleveland Ave. to Paxson Ave.8 of 12$8,294,000+22%
18 JUN 202020125N1Rt 202, Childs Rd/N Maple to Academy Pl5 of 9$7,229,820+21%
11 JUN 202020124N1Rt 21, Lafayette St to On Ramp At Interchange 72 of 8$3,673,982+1.0%
02 JUN 202020121C1Wright-Debow Rd, Bridge over Rt 1955 of 8$3,790,000+36%
21 MAY 202020106S1Route 322, RT 50 to Leipzig Ave.3 of 5$12,210,370+7.0%
Green Construction, Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy