NJDOT contract 25134 bid tabulation
RT 35, BRIDGE OVER NORTH BRANCH OF WRECK POND. Let by New Jersey DOT on October 23, 2025, Monmouth, C1. 5 bids received; low bid $8,293,413 by Earle Asphalt Company.
- Owner
- New Jersey DOT
- Letting
- 23 OCT 2025
- Pay items
- 140
- Data through
- 16 APR 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Earle Asphalt Company | $8,293,413 | Low |
| 2 | Ritacco Construction, Inc. | $9,919,000 | +20% |
| 3 | Midlantic Construction, LLC | $9,943,399 | +20% |
| 4 | Pillari Brothers Construction Corp. | $10,626,789 | +28% |
| 5 | Green Construction, Inc. | $11,664,596 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Earle Asphalt Company | 2. Ritacco Construction, Inc. | 3. Midlantic Construction, LLC | 4. Pillari Brothers Construction Corp. | 5. Green Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0001 | Performance bond and payment bond (151006M) | DOL | 1 | $40,000 | $60,000 | $41,000 | $75,100 | $55,000 |
| 0002 | Pollution liability insurance (152015P) | DOL | 1 | $1.00 | $9,000.00 | $17,000 | $1.00 | $14,000 |
| 0003 | Progress schedule (153003P) | LS | 1 | $7,500.00 | $7,500.00 | $100.00 | $8,250.00 | $7,500.00 |
| 0004 | Progress schedule update (153005M) | U | 17 | $300.00 | $250.00 | $1.00 | $1,650.00 | $750.00 |
| 0005 | No item (formerly 153011M trainees, qty 3590) (999999P) | U | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0006 | Mobilization (154003P) | LS | 1 | $820,000 | $1,485,000 | $950,000 | $670,000 | $1,661,625 |
| 0007 | Field office type F set UP (155018M) | U | 1 | $30,000 | $20,000 | $48,000 | $28,100 | $45,000 |
| 0008 | Field office type F maintenance (155036M) | MO | 37 | $5,000.00 | $2,750.00 | $5,800.00 | $3,650.00 | $4,500.00 |
| 0009 | Materials field laboratory set-UP (156003M) | U | 1 | $25,000 | $30,000 | $1,000.00 | $28,100 | $25,000 |
| 0010 | Materials field laboratory maintenance (156006M) | MO | 35 | $3,000.00 | $3,000.00 | $100.00 | $3,370.00 | $2,500.00 |
| 0011 | Nuclear density gauge (156015M) | U | 1 | $14,000 | $10,000 | $1,000.00 | $19,000 | $7,500.00 |
| 0012 | Concrete compression testing equipment (156021M) | U | 1 | $9,000.00 | $7,500.00 | $1,000.00 | $25,700 | $0.01 |
| 0013 | Monument (157006M) | U | 3 | $1,100.00 | $1,500.00 | $575.00 | $385.00 | $1,250.00 |
| 0014 | Silt fence (158006M) | LF | 131 | $8.00 | $6.00 | $20.00 | $17.75 | $7.00 |
| 0015 | Heavy duty silt fence, orange (158009M) | LF | 964 | $8.00 | $9.00 | $20.00 | $25.25 | $8.00 |
| 0016 | Heavy duty silt fence, black (158012M) | LF | 30 | $8.00 | $30.00 | $20.00 | $31.75 | $8.00 |
| 0017 | Inlet filter type 2, 2' X 4' (158030M) | U | 20 | $150.00 | $200.00 | $65.00 | $488.00 | $250.00 |
| 0018 | Floating turbidity barrier, type 3 (158048M) | LF | 237 | $35.00 | $30.00 | $41.00 | $70.50 | $50.00 |
| 0019 | Construction driveway (158060M) | T | 38 | $75.00 | $75.00 | $150.00 | $83.50 | $70.00 |
| 0020 | Concrete washout system (158063P) | LS | 1 | $3,000.00 | $7,500.00 | $3,000.00 | $8,430.00 | $10,000 |
| 0021 | Oil only emergency spill kit, type 1 (158072M) | U | 2 | $1,200.00 | $600.00 | $1,700.00 | $899.00 | $1,200.00 |
| 0022 | Erosion control sediment removal (158084M) | CY | 66 | $0.01 | $1.00 | $0.01 | $64.50 | $0.01 |
| 0023 | Breakaway barricade (159003M) | U | 10 | $0.01 | $220.00 | $100.00 | $141.00 | $0.01 |
| 0024 | Drum (159006M) | U | 7 | $0.01 | $110.00 | $200.00 | $61.75 | $3,200.00 |
| 0025 | Traffic cone (159009M) | U | 7 | $0.01 | $110.00 | $200.00 | $22.00 | $1,000.00 |
| 0026 | Construction signs (159012M) | SF | 504 | $0.01 | $19.00 | $12.00 | $17.50 | $17.00 |
| 0027 | Construction identification sign, 4' X 8' (159015M) | U | 4 | $1,200.00 | $900.00 | $2,350.00 | $1,020.00 | $1,200.00 |
| 0028 | Construction barrier curb (159021P) | LF | 682 | $50.00 | $135.00 | $105.00 | $150.00 | $120.00 |
| 0029 | Arrow board, 4' X 8' (159027M) | U | 2 | $10,000 | $500.00 | $1,000.00 | $10,100 | $4,500.00 |
| 0030 | Traffic control truck with mounted crash cushion (159108M) | U | 3 | $100,000 | $2,500.00 | $5,000.00 | $52,600 | $30,000 |
| 0031 | Temporary traffic stripes, 4" (159126M) | LF | 20,181 | $0.25 | $0.50 | $0.35 | $0.25 | $0.25 |
| 0032 | Temporary pavement markings (159132M) | SF | 276 | $3.25 | $5.00 | $3.00 | $3.30 | $3.50 |
| 0033 | HMA patch (159138M) | T | 50 | $0.01 | $50.00 | $100.00 | $319.00 | $0.01 |
| 0034 | Traffic director, flagger (159141M) | HR | 1,000 | $0.01 | $120.00 | $0.01 | $162.75 | $0.01 |
| 0035 | Emergency towing service (159144M) | U | 1 | $150.00 | $200.00 | $0.01 | $825.00 | $600.00 |
| 0036 | Snow removal (159190M) | LS | 1 | $100.00 | $15,000 | $0.01 | $35,100 | $25,000 |
| 0037 | Temporary crash cushion, compressive barrier, type 2, width narrow (159200M) | U | 2 | $40,000 | $20,000 | $42,000 | $30,200 | $25,000 |
| 0038 | Construction identification sign, iija 6' X 4' (159260M) | U | 2 | $1,200.00 | $900.00 | $2,350.00 | $950.00 | $1,000.00 |
| 0039 | Fuel price adjustment (160004M) | DOL | 1 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 0040 | Asphalt price adjustment (160007M) | DOL | 1 | $4,700.00 | $4,700.00 | $4,700.00 | $4,700.00 | $4,700.00 |
| 0041 | Steel price adjustment (160009M) | DOL | 1 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 0042 | Final cleanup (161003P) | LS | 1 | $15,000 | $10,500 | $1,000.00 | $29,100 | $25,000 |
| 0043 | Clearing site (201003P) | LS | 1 | $150,000 | $150,000 | $150,000 | $140,000 | $450,000 |
| 0044 | Stripping (202003P) | ACRE | 1 | $5,000.00 | $7,500.00 | $3,250.00 | $15,700 | $8,000.00 |
| 0045 | Excavation, test pit (202006M) | CY | 120 | $0.01 | $50.00 | $0.01 | $250.00 | $500.00 |
| 0046 | Excavation, unclassified (202009P) | CY | 2,268 | $125.00 | $50.00 | $0.01 | $98.75 | $70.00 |
| 0047 | Removal of pavement (202021P) | SY | 82 | $130.00 | $350.00 | $75.00 | $29.50 | $200.00 |
| 0048 | I-7 soil aggregate (203006P) | CY | 57 | $100.00 | $100.00 | $121.00 | $91.75 | $100.00 |
| 0049 | Dense-graded aggregate base course, 4" thick (302033P) | SY | 321 | $20.00 | $20.00 | $50.00 | $12.75 | $20.00 |
| 0050 | Dense-graded aggregate base course, 6" thick (302036P) | SY | 420 | $20.00 | $30.00 | $50.00 | $18.75 | $25.00 |
| 0051 | Dense-graded aggregate base course, variable thickness (302051P) | CY | 10 | $100.00 | $160.00 | $418.00 | $105.00 | $100.00 |
| 0052 | HMA milling, more than 3" to 6" (401012P) | SY | 4,537 | $9.00 | $15.00 | $4.00 | $14.50 | $11.00 |
| 0053 | Polymerized joint adhesive (401027M) | LF | 3,590 | $0.10 | $0.50 | $6.00 | $0.75 | $50.00 |
| 0054 | Tack coat (401030M) | GAL | 458 | $4.00 | $3.00 | $17.00 | $0.01 | $5.00 |
| 0055 | Prime coat (401036M) | GAL | 225 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0056 | Hot mix asphalt 9.5 M 64 surface course (401042M) | T | 509 | $130.00 | $190.00 | $175.00 | $281.00 | $150.00 |
| 0057 | Hot mix asphalt 12.5 M 64 intermediate course (401072M) | T | 503 | $160.00 | $195.00 | $175.00 | $261.00 | $150.00 |
| 0058 | Core samples, hot mix asphalt (401108M) | U | 15 | $75.00 | $400.00 | $300.00 | $437.00 | $250.00 |
| 0059 | 15" reinforced concrete pipe (601122P) | LF | 49 | $100.00 | $200.00 | $200.00 | $144.00 | $180.00 |
| 0060 | 18" reinforced concrete pipe (601124P) | LF | 100 | $200.00 | $550.00 | $115.00 | $324.00 | $185.00 |
| 0061 | 24" reinforced concrete pipe (601128P) | LF | 82 | $130.00 | $240.00 | $150.00 | $185.00 | $200.00 |
| 0062 | 36" reinforced concrete pipe (601134P) | LF | 91 | $200.00 | $250.00 | $185.00 | $224.00 | $250.00 |
| 0063 | 30" high density polyethylene pipe (601258P) | LF | 41 | $200.00 | $260.00 | $0.01 | $320.00 | $200.00 |
| 0064 | 34" X 53" reinforced concrete elliptical pipe, CLSS HE - III (601610P) | LF | 77 | $300.00 | $360.00 | $335.00 | $300.00 | $400.00 |
| 0065 | 38" X 60" reinforced concrete elliptical pipe, CLSS HE - III (601612P) | LF | 42 | $375.00 | $600.00 | $525.00 | $460.00 | $450.00 |
| 0066 | 48" X 76" reinforced concrete elliptical pipe, CLSS HE - III (601616P) | LF | 13 | $1,000.00 | $1,100.00 | $1,050.00 | $1,000.00 | $700.00 |
| 0067 | Inlet, type double B (602013M) | U | 5 | $14,000 | $8,500.00 | $8,800.00 | $15,100 | $15,000 |
| 0068 | Inlet, type E (602018M) | U | 1 | $9,000.00 | $5,500.00 | $8,025.00 | $8,010.00 | $6,500.00 |
| 0069 | Inlet, type double E (602019M) | U | 2 | $10,000 | $9,000.00 | $8,850.00 | $12,600 | $12,500 |
| 0070 | Manhole, 5' diameter (602057M) | U | 1 | $3,000.00 | $6,000.00 | $2,000.00 | $16,400 | $12,500 |
| 0071 | Manhole, 6' diameter (602060M) | U | 3 | $10,000 | $7,000.00 | $2,000.00 | $17,000 | $15,000 |
| 0072 | Junction chamber (602226M) | U | 2 | $25,000 | $13,000 | $17,200 | $39,000 | $20,000 |
| 0073 | Riprap stone channel protection, 12" thick (D50=6") (603036P) | SY | 24 | $400.00 | $60.00 | $275.00 | $212.00 | $280.00 |
| 0074 | Gabion wall (604003P) | CY | 22 | $650.00 | $400.00 | $1,025.00 | $730.00 | $700.00 |
| 0075 | Concrete sidewalk, 4" thick (606012P) | SY | 26 | $120.00 | $100.00 | $380.00 | $326.00 | $195.00 |
| 0076 | Hot mix asphalt driveway, 4" thick (606036P) | SY | 12 | $200.00 | $40.00 | $88.00 | $110.00 | $100.00 |
| 0077 | Concrete island, 4" thick (606075P) | SY | 6 | $200.00 | $400.00 | $930.00 | $351.00 | $182.00 |
| 0078 | Detectable warning surface (606084P) | SY | 3 | $150.00 | $300.00 | $675.00 | $740.00 | $275.00 |
| 0079 | 9" X 16" concrete vertical curb (607018P) | LF | 392 | $40.00 | $40.00 | $88.00 | $124.00 | $70.00 |
| 0080 | 9" X 18" concrete vertical curb (607021P) | LF | 442 | $40.00 | $45.00 | $80.00 | $91.00 | $70.00 |
| 0081 | 12" X 13" concrete sloping curb (607030P) | LF | 40 | $60.00 | $80.00 | $125.00 | $87.00 | $90.00 |
| 0082 | Nonvegetative surface, hot mix asphalt (608003P) | SY | 285 | $80.00 | $65.00 | $70.00 | $96.25 | $70.00 |
| 0083 | Beam guide rail (609003M) | LF | 213 | $50.00 | $45.00 | $55.00 | $61.50 | $55.00 |
| 0084 | Tangent guide rail terminal (609027M) | U | 2 | $6,000.00 | $4,500.00 | $5,300.00 | $4,240.00 | $5,200.00 |
| 0085 | Beam guide rail anchorage (609039M) | U | 2 | $2,500.00 | $1,750.00 | $2,175.00 | $1,380.00 | $2,200.00 |
| 0086 | Approach guide rail transition TL-2 (609058M) | U | 4 | $5,000.00 | $3,000.00 | $3,525.00 | $2,040.00 | $3,500.00 |
| 0087 | Removal of beam guide rail (609075M) | LF | 600 | $0.01 | $1.00 | $1.00 | $12.50 | $3.00 |
| 0088 | Traffic stripes, 4" (610003M) | LF | 4,089 | $0.80 | $1.00 | $1.25 | $0.75 | $0.80 |
| 0089 | Traffic marking lines, 8" (610014M) | LF | 569 | $1.80 | $2.00 | $2.35 | $1.80 | $1.95 |
| 0090 | Traffic marking lines, 24" (610017M) | LF | 476 | $5.00 | $5.00 | $7.00 | $5.30 | $5.85 |
| 0091 | Removal of traffic stripes (610036M) | LF | 19,514 | $0.90 | $1.00 | $1.00 | $0.85 | $0.90 |
| 0092 | Removal of traffic markings (610039M) | SF | 368 | $2.50 | $4.00 | $4.00 | $2.50 | $2.70 |
| 0093 | Traffic markings symbols (610060M) | SF | 168 | $9.00 | $10.00 | $9.00 | $8.80 | $46.00 |
| 0094 | Regulatory and warning sign (612003P) | SF | 63 | $50.00 | $40.00 | $88.00 | $49.50 | $38.00 |
| 0095 | Relocate sign (612021M) | U | 4 | $200.00 | $175.00 | $525.00 | $193.00 | $240.00 |
| 0096 | 8" ductile iron water pipe, class 52 (651057P) | LF | 120 | $375.00 | $500.00 | $265.00 | $344.00 | $1,200.00 |
| 0097 | Line stop and tie-in (651267M) | U | 2 | $5,000.00 | $20,000 | $11,000 | $15,000 | $50,000 |
| 0098 | 8" water pipe, trenchless construction (651513P) | LF | 100 | $1,200.00 | $1,000.00 | $1,000.00 | $1,120.00 | $1,800.00 |
| 0099 | Electrical utility relocation electrical utility relocation, JCP&L (654007P) | LS | 1 | $450,000 | $550,000 | $538,000 | $420,000 | $400,000 |
| 0100 | Traffic signal cable, 2 conductor (702027P) | LF | 110 | $24.00 | $50.00 | $21.00 | $19.75 | $21.00 |
| 0101 | Push button (702042M) | U | 1 | $4,000.00 | $5,000.00 | $2,300.00 | $2,160.00 | $2,300.00 |
| 0102 | Topsoil spreading __" thick topsoil spreading 4" thick (804000P) | SY | 1,103 | $15.00 | $5.00 | $6.00 | $16.00 | $5.00 |
| 0103 | Plant pit soil (804014P) | CY | 5 | $100.00 | $75.00 | $88.00 | $132.00 | $90.00 |
| 0104 | Fertilizing and seeding, type A-3 (806006P) | SY | 1,103 | $2.00 | $2.00 | $2.00 | $1.65 | $2.25 |
| 0105 | Topsoil stabilization, type 1 mat (807003M) | SY | 441 | $5.00 | $5.00 | $6.00 | $5.50 | $6.00 |
| 0106 | Straw mulching (809003M) | SY | 1,103 | $1.25 | $1.00 | $2.00 | $1.10 | $1.00 |
| 0107 | Gravel mulching (809012M) | SY | 271 | $60.00 | $7.00 | $9.00 | $55.00 | $7.50 |
| 0108 | Wood mulching (809018M) | SY | 683 | $7.00 | $5.00 | $7.00 | $5.50 | $7.00 |
| 0109 | Deciduous shrub, 18-24" high, #3 container (811063M) | U | 95 | $100.00 | $70.00 | $85.00 | $71.50 | $80.00 |
| 0110 | Evergreen shrub, 18-24" spread, #3 container (811093M) | U | 22 | $100.00 | $75.00 | $90.00 | $71.50 | $90.00 |
| 0111 | Perennial, #1 container (811111M) | U | 224 | $50.00 | $25.00 | $30.00 | $24.25 | $30.00 |
| 0112 | Plant establishment and maintenance period (811138M) | LS | 1 | $11,500 | $5,000.00 | $5,000.00 | $88,000 | $5,500.00 |
| 0113 | Watering (811165M) | MG | 2 | $525.00 | $500.00 | $585.00 | $220.00 | $600.00 |
| 0114 | Vibration monitoring (162006P) | LS | 1 | $200,000 | $90,000 | $24,000 | $33,000 | $275,000 |
| 0115 | Clearing site, bridge (___) clearing site, bridge (structure no. 1310-155) (201006P) | LS | 1 | $250,000 | $250,000 | $250,000 | $250,000 | $450,000 |
| 0116 | Asbestos removal, bridge no. ___ asbestos removal, bridge no. 1310-155 (201037P) | LS | 1 | $20,000 | $20,000 | $8,000.00 | $28,900 | $75,000 |
| 0117 | Temporary shielding (201039P) | LS | 1 | $5,000.00 | $110,000 | $20,000 | $20,600 | $100,000 |
| 0118 | I-9 soil aggregate (203009P) | CY | 665 | $150.00 | $90.00 | $100.00 | $100.00 | $100.00 |
| 0119 | Temporary sheeting (501003P) | SF | 2,530 | $0.01 | $1.00 | $90.00 | $22.00 | $100.00 |
| 0120 | Temporary cofferdam (501009P) | LS | 1 | $1,200,000 | $1,831,402 | $700,000 | $2,150,000 | $175,000 |
| 0121 | Furnishing equipment for driving piles (502003P) | LS | 1 | $267,410 | $325,000 | $3,275,000 | $970,000 | $30,000 |
| 0122 | Test pile, furnished (502009M) | LF | 264 | $110.00 | $130.00 | $100.00 | $78.00 | $180.00 |
| 0123 | Test pile, driven (502012M) | LF | 224 | $100.00 | $140.00 | $150.00 | $27.50 | $250.00 |
| 0124 | Dynamic pile load test (502018M) | U | 4 | $4,000.00 | $4,500.00 | $4,700.00 | $3,410.00 | $6,000.00 |
| 0125 | Cast-in-place concrete pile, furnished, 16" diameter (502027M) | LF | 8,640 | $95.00 | $95.00 | $70.00 | $78.00 | $180.00 |
| 0126 | Cast-in-place concrete pile, driven, 16" diameter (502051M) | LF | 7,340 | $30.00 | $95.00 | $10.00 | $16.50 | $150.00 |
| 0127 | Splice cast-in-place pile (502201M) | U | 129 | $0.01 | $1.00 | $0.01 | $1,650.00 | $1,800.00 |
| 0128 | Pile shoe (502207M) | U | 129 | $500.00 | $530.00 | $500.00 | $550.00 | $900.00 |
| 0129 | Reinforcement steel, epoxy- coated (504006P) | LB | 56,167 | $2.50 | $2.00 | $2.25 | $3.25 | $2.50 |
| 0130 | Concrete footing (504015P) | CY | 346 | $450.00 | $500.00 | $725.00 | $1,000.00 | $1,400.00 |
| 0131 | Concrete wing wall (504018P) | CY | 104 | $2,000.00 | $1,725.00 | $1,300.00 | $3,210.00 | $2,750.00 |
| 0132 | Concrete abutment wall (504024P) | CY | 42 | $2,000.00 | $1,725.00 | $2,750.00 | $3,360.00 | $4,500.00 |
| 0133 | Concrete pylon (504053P) | LF | 32 | $1,000.00 | $1,200.00 | $1,135.00 | $1,190.00 | $900.00 |
| 0134 | Precast concrete culvert (505057P) | LF | 67 | $5,500.00 | $9,000.00 | $4,725.00 | $6,000.00 | $6,000.00 |
| 0135 | Concrete bridge deck, HPC (507024P) | CY | 45 | $4,000.00 | $1,900.00 | $2,150.00 | $3,800.00 | $4,200.00 |
| 0136 | Date panel (507027M) | U | 2 | $1,000.00 | $1,500.00 | $600.00 | $3,230.00 | $750.00 |
| 0137 | Concrete bridge sidewalk, HPC (507033P) | CY | 39 | $1,000.00 | $750.00 | $850.00 | $1,170.00 | $1,900.00 |
| 0138 | Concrete bridge approach (507051P) | CY | 145 | $1,500.00 | $1,000.00 | $1,350.00 | $1,590.00 | $1,750.00 |
| 0139 | Steel 4 bar bridge railing (507085P) | LF | 112 | $500.00 | $500.00 | $525.00 | $394.00 | $600.00 |
| 0140 | 8" perforated high density polyethylene pipe (601419P) | LF | 210 | $75.00 | $50.00 | $75.00 | $65.50 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NJDOT's tabulation for this contract. NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
Every contract let that day: NJDOT letting of October 23, 2025. Compiled by Mirage Metrics.