NJDOT contract 25118 bid tabulation
NJDOT Horizontal Curve Signs - North. Let by New Jersey DOT on July 22, 2025, Bergen, N1. 3 bids received; low bid $482,676 by LC Equipment, Inc..
- Owner
- New Jersey DOT
- Letting
- 22 JUL 2025
- Pay items
- 15
- Data through
- 16 APR 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | LC Equipment, Inc. | $482,676 | Low |
| 2 | M.L. Ruberton Construction Co., Inc. | $1,157,513 | +140% |
| 3 | J. Fletcher Creamer & Son, Inc. | $1,247,832 | +159% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. LC Equipment, Inc. | 2. M.L. Ruberton Construction Co., Inc. | 3. J. Fletcher Creamer & Son, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Performance bond and payment bond (151006M) | DOL | 1 | $2,000.00 | $10,700 | $4,000.00 |
| 0002 | Pollution liability insurance (152015P) | DOL | 1 | $6,000.00 | $1.00 | $2,500.00 |
| 0003 | Bar chart progress schedule and updates (153009P) | LS | 1 | $2,000.00 | $25,000 | $1,000.00 |
| 0004 | Trainees (153011M) | HR | 1,050 | $1.00 | $1.00 | $1.00 |
| 0005 | Mobilization (154003P) | LS | 1 | $35,000 | $115,000 | $125,000 |
| 0006 | Breakaway barricade (159003M) | U | 36 | $1.00 | $200.00 | $60.00 |
| 0007 | Drum (159006M) | U | 550 | $1.00 | $80.00 | $30.00 |
| 0008 | Traffic cone (159009M) | U | 550 | $1.00 | $28.00 | $7.00 |
| 0009 | Construction signs (159012M) | SF | 1,700 | $10.00 | $45.00 | $10.00 |
| 0010 | Arrow board, 4' X 8' (159027M) | U | 2 | $500.00 | $1,500.00 | $3,750.00 |
| 0011 | Traffic control truck with mounted crash cushion (159108M) | U | 2 | $5,000.00 | $5,000.00 | $12,500 |
| 0012 | Traffic director, flagger (159141M) | HR | 240 | $90.00 | $165.00 | $175.00 |
| 0013 | Final cleanup (161003P) | LS | 1 | $1,000.00 | $35,000 | $18,500 |
| 0014 | Clearing site (201003P) | LS | 1 | $1,000.00 | $25,000 | $25,000 |
| 0015 | Regulatory and warning sign (612003P) | SF | 5,906 | $65.00 | $127.00 | $162.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NJDOT's tabulation for this contract. NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
Every contract let that day: NJDOT letting of July 22, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.