Railroad Construction Company, Inc.: NJDOT bid record
Railroad Construction Company, Inc. submitted 14 bids on New Jersey DOT contracts in the data, from 08 AUG 2019 to 26 AUG 2025, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +33% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $0
- Latest bid
- 26 AUG 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 0 | 0% |
| 2020 | 7 | 0 | 0% |
| 2021 | 3 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2025 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N4 | 5 | 0 | 0% |
| N1 | 3 | 0 | 0% |
| C1 | 2 | 0 | 0% |
| H4 | 2 | 0 | 0% |
| C4 | 1 | 0 | 0% |
| S4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reinforcement steel, epoxy- coated | 504006P | LB | 9 | 5 (56%) | $2.00 | $2.52 |
| Fuel price adjustment | 160004M | DOL | 5 | 5 (100%) | $10,000 | $2,700.00 |
| Drum | 159006M | U | 5 | 2 (40%) | $60.00 | $1.00 |
| Construction signs | 159012M | SF | 5 | 2 (40%) | $17.00 | $15.00 |
| Breakaway barricade | 159003M | U | 5 | 2 (40%) | $155.00 | $1.00 |
| Temporary sheeting | 501003P | SF | 9 | 1 (11%) | $60.00 | $18.06 |
| Tack coat | 401030M | GAL | 5 | 1 (20%) | $5.29 | $1.00 |
| Portable variable message sign | 159030M | U | 5 | 1 (20%) | $6,000.00 | $5,000.00 |
| Polymerized joint adhesive | 401027M | LF | 5 | 1 (20%) | $1.59 | $0.52 |
| 3" rigid metallic conduit | 701021P | LF | 5 | 1 (20%) | $71.48 | $65.00 |
| Straw mulching | 809003M | SY | 5 | 1 (20%) | $1.25 | $1.00 |
| Erosion control sediment removal | 158084M | CY | 5 | 1 (20%) | $45.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 12 | 11 of 12 |
| Joseph M. Sanzari, Inc. | 11 | 11 of 11 |
| Mount Construction Co., Inc. | 10 | 10 of 10 |
| Colonnelli Brothers, Inc. | 5 | 4 of 5 |
| Konkus Corporation | 4 | 4 of 4 |
| Anselmi & Decicco, Inc. | 4 | 4 of 4 |
| J. Fletcher Creamer & Son, Inc. | 3 | 3 of 3 |
| Ritacco Construction, Inc. | 3 | 3 of 3 |
| Berto Construction, Inc. | 3 | 2 of 3 |
| JPC Group, Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2025 | 25122 | C1 | Route 295 Noise Barrier | 9 of 10 | $16,324,587 | +42% |
| 01 MAY 2025 | 25102 | N1 | Rt 46 Bridge over Paulins Kill | 8 of 10 | $28,622,403 | +33% |
| 19 MAY 2022 | 22441 | N4 | MTN JOC Infrastructure Repairs, North-2022 | 4 of 5 | $8,487,000 | +69% |
| 27 MAY 2021 | 21452 | S4 | MTN JOC Infrastructure Repairs, South-2021 | 5 of 5 | $7,202,000 | +45% |
| 25 MAY 2021 | 21451 | C4 | MTN JOC Infrastructure Repairs, Central-2021 | 6 of 6 | $9,107,000 | +30% |
| 20 MAY 2021 | 21450 | N4 | MTN JOC Infrastructure Repairs, North-2021 | 5 of 5 | $9,107,000 | +43% |
| 03 DEC 2020 | 21418 | N4 | MTN CONCRETE STRUC. REP. NORTH - 2021 | 6 of 7 | $22,968,516 | +28% |
| 20 OCT 2020 | 19487 | H4 | Maintenance JOC, Bridge Repairs, South-2019 | 5 of 6 | $5,439,325 | +30% |
| 15 OCT 2020 | 19486 | H4 | Maintenance JOC Bridge Repairs, North-2019 | 7 of 7 | $6,224,800 | +43% |
| 02 JUL 2020 | 20122 | N1 | Route 78 Rockfall Mitigation | 13 of 14 | $48,617,573 | +117% |
| 09 JUN 2020 | 20123 | N1 | SIGN STRUCTURE REPLACEMENT CONTRACT 2013-1 | 4 of 4 | $4,981,841 | +33% |
| 21 MAY 2020 | 20120 | C1 | Milltown Rd/North Main St (CR 606), Bridge over Rt 1 | 5 of 10 | $10,692,804 | +22% |
| 07 MAY 2020 | 20429 | N4 | MTN JOC Infrastructure Repairs, North-2020 | 5 of 6 | $9,245,000 | +19% |
| 08 AUG 2019 | 19427 | N4 | MTN JOC Infrastructure Repairs, North-2019 | 5 of 5 | $7,516,200 | +28% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.