B Anthony Construction Corp J/V A. Servidone Inc: NJDOT bid record

B Anthony Construction Corp J/V A. Servidone Inc submitted 10 bids on New Jersey DOT contracts in the data, from 19 OCT 2017 to 01 MAY 2025, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +35% above the low bid.

Owner
New Jersey DOT
Low bid volume
$0
Latest bid
01 MAY 2025
Data through
16 APR 2026
10Bids
0Low bids
0Win rate, percent
+35%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
2017200%
2020300%
2021200%
2022100%
2024100%
2025100%
B Anthony Construction Corp J/V A. Servidone Inc, NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
N1800%
C1200%
B Anthony Construction Corp J/V A. Servidone Inc, NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Fuel price adjustment160004MDOL1010 (100%)$13,300$2,700.00
Asphalt price adjustment160007MDOL1010 (100%)$11,350$10,200
Trainees153011MHR87 (88%)$1.00$1.00
Reinforcement steel, epoxy- coated504006PLB202 (10%)$4.50$2.52
Core samples, hot mix asphalt401108MU102 (20%)$225.00$150.00
Tack coat401030MGAL92 (22%)$3.50$1.00
Fertilizing and seeding, type F806018PSY92 (22%)$2.50$2.10
Prime coat401036MGAL82 (25%)$1.00$0.01
Inlet, type E602018MU72 (29%)$3,800.00$6,000.00
Concrete compression testing equipment156021MU62 (33%)$5,900.00$9,444.00
Wood mulching809018MSY52 (40%)$6.00$7.00
Reinforcement steel504003PLB52 (40%)$2.00$1.95
B Anthony Construction Corp J/V A. Servidone Inc, NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

B Anthony Construction Corp J/V A. Servidone Inc, NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
01 MAY 202525102N1Rt 46 Bridge over Paulins Kill6 of 10$27,555,505+28%
11 APR 202424103N1Rt 15 Corridor, Rockfall Mitigation, Contract A7 of 7$14,972,851+52%
06 JAN 202221140N1Weldon Road Over Route 15 Superstructure Replacement8 of 8$11,577,251+53%
03 JUN 202121113N1Route 22 / Route 82 / Garden State Parkway Interchange7 of 7$50,989,982+25%
18 MAR 202121105N1Route 280 Rockfall Mitigation, West Orange Township2 of 7$6,216,232+11%
12 NOV 202020133N1I-80 Rockfall Mitigation6 of 6$3,995,554+24%
15 OCT 202020131N1Route 206 Doctors Way to Valley Road9 of 9$62,279,064+49%
02 JUL 202020122N1Route 78 Rockfall Mitigation5 of 14$31,697,854+42%
30 NOV 201717144C1ROUTE US 206 BYPASS - CONTRACT B SEC 14A & 15A6 of 13$44,492,458+21%
19 OCT 201717147C1ROUTE 35, PERTH AMBOY CONNECTOR BRIDGE REPLACEMENT6 of 11$13,947,117+41%
B Anthony Construction Corp J/V A. Servidone Inc: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy