NJDOT contract 25108 bid tabulation

ROUTE 78 WB, BRIDGE OVER TRIBUTARY OF DEAD RIVER. Let by New Jersey DOT on May 29, 2025, Somerset, C1. 8 bids received; low bid $6,136,000 by Ritacco Construction, Inc..

Owner
New Jersey DOT
Letting
29 MAY 2025
Pay items
95
Data through
16 APR 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ritacco Construction, Inc.$6,136,000Low
2Joseph M. Sanzari, Inc.$6,998,613+14%
3Iew Construction Group, Inc.$7,198,811+17%
4Union Paving & Construction Co., Inc.$7,962,994+30%
5Konkus Corporation$8,323,923+36%
6Colonnelli Brothers, Inc.$8,492,700+38%
7Ferreira Construction Co., Inc.$8,899,472+45%
8Carbro Constructors Corp.$9,882,288+61%
NJDOT contract 25108: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ritacco Construction, Inc.2. Joseph M. Sanzari, Inc.3. Iew Construction Group, Inc.4. Union Paving & Construction Co., Inc.5. Konkus Corporation6. Colonnelli Brothers, Inc.
0001Performance bond and payment bond (151006M)DOL1$35,000$57,000$36,444$35,000$100,000$45,000
0002Pollution liability insurance (152015P)DOL1$25,000$10,000$0.01$10,000$15,000$10,000
0003Progress schedule (153003P)LS1$8,000.00$3,500.00$0.01$8,000.00$5,500.00$10,000
0004Progress schedule update (153005M)U10$250.00$400.00$0.01$1,000.00$0.01$2,500.00
0005Trainees (153011M)HR1$1.00$300.00$0.01$0.01$0.01$5.00
0006Mobilization (154003P)LS1$613,600$625,000$750,000$1,170,000$600,000$850,000
0007Field office type F set UP (155018M)U1$20,000$50,000$48,916$45,000$30,000$35,000
0008Field office type F maintenance (155036M)MO21$2,700.00$4,500.00$5,283.21$4,500.00$3,000.00$2,500.00
0009Materials field laboratory set-UP (156003M)U1$35,000$50,000$56,351$35,000$0.01$25,000
0010Materials field laboratory maintenance (156006M)MO21$3,000.00$3,500.00$4,397.59$3,500.00$0.01$1,500.00
0011Nuclear density gauge (156015M)U1$10,000$10,000$12,216$10,000$0.01$2,500.00
0012Heavy duty silt fence, orange (158009M)LF2,110$9.00$20.00$11.45$8.00$6.50$8.00
0013Inlet filter type 2, 2' X 4' (158030M)U4$400.00$530.00$377.39$300.00$0.01$150.00
0014Construction driveway (158060M)T683$40.00$190.00$65.90$110.00$0.01$55.00
0015Concrete washout system (158063P)LS1$10,000$5,900.00$30,539$7,000.00$20,000$5,000.00
0016Oil only emergency spill kit, type 1 (158072M)U2$500.00$1,620.00$1,343.71$1,000.00$0.01$850.00
0017Erosion control sediment removal (158084M)CY21$20.00$1,130.00$113.57$0.01$0.01$35.00
0018Breakaway barricade (159003M)U80$10.00$100.00$183.23$135.00$0.01$50.00
0019Drum (159006M)U180$5.00$40.00$73.29$75.00$0.01$65.00
0020Traffic cone (159009M)U180$1.00$12.00$24.98$30.00$0.01$25.00
0021Construction signs (159012M)SF1,344$16.00$25.00$21.38$22.00$17.25$16.00
0022Construction identification sign, 6' X 12' (159018M)U1$1,250.00$1,575.00$2,137.71$3,000.00$1,610.00$1,500.00
0023Construction barrier curb (159021P)LF1,980$120.00$314.00$124.85$160.00$45.00$95.00
0024Portable variable message sign (159030M)U4$1,000.00$15,000$11,767$13,000$0.01$15,000
0025Traffic control truck with mounted crash cushion (159108M)U2$1,500.00$20,000$3,053.88$35,000$50,000$50,000
0026HMA patch (159138M)T5$300.00$500.00$765.81$600.00$0.01$250.00
0027Snow removal (159190M)LS1$5,000.00$10,000$37,824$0.01$0.01$50,000
0028Temporary crash cushion, compressive barrier, type 3, width narrow (159212M)U2$20,000$60,000$39,621$35,000$30,000$15,000
0029Temporary crash cushion, compressive barrier, type 3, width medium (159215M)U1$20,000$45,000$21,403$35,000$30,000$20,000
0030Construction identification sign, iija 8' X 5' (159262M)U1$900.00$1,575.00$1,997.87$3,000.00$1,092.50$1,000.00
0031Fuel price adjustment (160004M)DOL1$1,900.00$1,900.00$1,900.00$1,900.00$1,900.00$1,900.00
0032Asphalt price adjustment (160007M)DOL1$3,800.00$3,800.00$3,800.00$3,800.00$3,800.00$3,800.00
0033Steel price adjustment (160009M)DOL1$100.00$100.00$100.00$100.00$100.00$100.00
0034Final cleanup (161003P)LS1$10,500$20,000$5,000.00$1,000.00$0.01$50,000
0035Clearing site (201003P)LS1$30,000$50,000$30,000$30,000$20,000$550,000
0036Stripping (202003P)ACRE2$1,000.00$25,000$68,406$0.01$0.01$12,500
0037Excavation, unclassified (202009P)CY358$50.00$120.00$222.42$125.00$50.00$60.00
0038Dense-graded aggregate base course, 6" thick (302036P)SY916$20.00$30.00$37.22$30.00$17.00$15.00
0039HMA milling, 3" or less (401009P)SY7,225$7.00$5.00$6.56$11.00$6.32$20.00
0040Polymerized joint adhesive (401027M)LF4,568$0.10$1.00$0.11$1.00$0.10$4.00
0041Tack coat (401030M)GAL800$0.10$1.00$0.11$0.01$0.10$5.00
0042Hot mix asphalt 12.5 M E surface course (401061M)T1,066$175.00$170.00$200.64$170.00$193.32$165.00
0043Hot mix asphalt 25 M 64 base course (401099M)T540$210.00$210.00$283.53$160.00$230.00$210.00
0044Core samples, hot mix asphalt (401108M)U15$150.00$154.00$171.25$225.00$150.00$1,000.00
0045Fog seal strip (422004M)LF3,819$2.00$2.00$1.43$40.00$2.00$1.00
0046Temporary sheeting (501003P)SF250$10.00$400.00$0.01$0.01$0.01$150.00
0047Reset existing casting (602099M)U1$2,000.00$1,300.00$3,094.42$800.00$350.00$1,000.00
0048Cleaning drainage structure (602216M)U2$500.00$3,500.00$2,283.28$800.00$500.00$2,000.00
00499" X 16" concrete vertical curb (607018P)LF72$80.00$97.00$331.08$55.00$135.00$45.00
0050Nonvegetative surface, hot mix asphalt (608003P)SY1,089$40.00$43.00$46.81$50.00$40.00$50.00
0051Beam guide rail (609003M)LF1,329$36.00$40.00$43.38$42.00$42.90$42.00
0052Beam guide rail, dual-faced (609006M)LF288$56.00$59.00$64.50$60.00$46.20$65.00
0053Tangent guide rail terminal (609027M)U1$3,600.00$3,832.00$4,166.98$4,000.00$4,345.00$4,500.00
0054Beam guide rail anchorage (609039M)U2$1,600.00$1,785.00$1,940.79$2,000.00$1,375.00$2,500.00
0055Approach guide rail transition TL-3 (609059M)U2$4,300.00$4,557.00$4,954.71$5,000.00$4,950.00$5,000.00
0056Removal of beam guide rail (609075M)LF1,874$4.00$15.00$5.42$5.00$0.01$10.00
0057Traffic stripes, 6" (610006M)LF24,992$0.80$1.00$0.68$0.70$0.97$1.00
0058RPM, mono-directional, white lens (610012M)U50$50.00$40.00$45.09$45.00$65.00$65.00
0059Traffic marking lines, 12" (610016M)LF556$3.00$4.00$4.11$4.00$3.50$4.00
0060RPM, mono-directional, amber lens (610018M)U25$50.00$40.00$45.09$45.00$65.00$65.00
0061Removal of RPM (610024M)U75$50.00$75.00$87.63$45.00$0.01$50.00
0062Rumble strip (610033M)LF1,505$10.00$9.00$10.24$13.00$16.00$30.00
0063Removal of traffic stripes (610036M)LF20,371$0.95$1.00$0.86$0.85$2.00$1.00
0064Removal of rumble strip (610038M)LF1,505$25.00$31.00$32.71$13.00$35.00$25.00
0065Topsoil spreading __" thick topsoil spreading 4" thick (804000P)SY2,596$5.00$15.00$9.30$3.00$1.00$8.00
0066Fertilizing and seeding, type A-3 (806006P)SY2,596$1.50$2.00$2.11$2.50$1.00$3.00
0067Straw mulching (809003M)SY2,596$1.00$1.00$1.26$2.50$1.00$3.00
0068Vibration monitoring (162006P)LS1$90,000$80,000$49,890$75,000$75,000$100,000
0069Clearing site, bridge (___) structure no. 1817-167 (201006P)LS1$220,000$621,129$220,000$220,000$220,000$1,270,060
0070Asbestos removal, bridge no. ___ 1817-167 (201037P)LS1$5,000.00$60,000$58,889$7,000.00$82,200$50,000
0071Temporary shielding (201039P)LS1$750,484$336,000$120,350$777,000$3,275,000$201,948
0072Excavation, unclassified (202009P)CY630$50.00$80.00$241.09$150.00$85.00$50.00
0073Coarse aggregate, size no. 57 (302060P)CY54$90.00$200.00$268.91$150.00$200.00$50.00
0074Temporary sheeting (501003P)SF2,254$1.00$85.00$0.01$0.01$0.01$200.00
0075Reinforcement steel, epoxy- coated (504006P)LB10,400$3.00$2.00$2.66$3.00$3.00$3.00
0076Reinforcement steel, galvanized (504009P)LB12,900$5.00$4.00$6.76$7.00$3.00$3.00
0077Concrete abutment wall (504024P)CY21$7,500.00$5,500.00$11,583$9,000.00$8,500.00$6,500.00
0078Epoxy waterproofing (504036P)SY48$60.00$108.00$86.54$90.00$85.00$40.00
0079Prefabricated superstructure units, HPC (505066P)SF2,924$620.00$420.00$847.00$735.00$437.60$800.00
0080Precast concrete sleeper slab (505067P)CY39$1,800.00$5,750.00$2,440.84$2,100.00$3,412.00$2,250.00
0081Reinforced elastomeric bearing assembly (506006P)U24$7,500.00$3,200.00$3,218.71$9,000.00$4,300.00$5,250.00
0082Strip seal expansion joint assembly (507015P)LF118$500.00$800.00$818.39$900.00$610.00$600.00
0083Date panel (507027M)U2$2,500.00$1,000.00$2,282.08$2,000.00$2,500.00$2,500.00
0084Concrete bridge parapet, HPC (507039P)LF102$600.00$1,000.00$881.98$700.00$950.00$450.00
0085Concrete sleeper slab (507050M)CY19$2,400.00$2,000.00$1,567.47$3,000.00$6,666.34$1,250.00
0086Concrete bridge relief slab (507054P)SY125$500.00$600.00$761.47$600.00$1,013.28$650.00
0087Diamond grinding, concrete deck surface (507073M)SF4,321$10.00$15.00$15.47$9.00$16.00$5.00
0088Concrete bridge deck, uhpc (507123P)CY8$28,000$26,000$22,546$40,000$29,375$4,000.00
0089Bridge deck and bridge approach sealing (507140P)SF261$70.00$13.00$17.12$6.00$66.00$8.00
0090Substructure concrete repair (555003M)SF25$400.00$410.00$576.99$260.00$200.00$200.00
0091Concrete barrier curb with moment slab (607040P)LF80$1,600.00$1,600.00$1,121.60$1,700.00$1,850.00$1,300.00
00922" rigid metallic conduit (701015P)LF208$70.00$59.00$66.95$70.00$80.00$100.00
0093I-9 soil aggregate (203009P)CY100$90.00$130.00$278.31$120.00$96.00$65.00
0094Removal of pavement (202021P)SY1,006$50.00$35.00$72.53$80.00$15.00$25.00
0095I-14 soil aggregate (203021P)CY136$70.00$145.00$135.75$65.00$0.01$65.00
NJDOT contract 25108: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NJDOT's tabulation for this contract. NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

Every contract let that day: NJDOT letting of May 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy