NYSDOT contract D265459 bid tabulation
STORMWATER MANAGEMENT Various Locations. Let by New York State DOT on March 13, 2025, Columbia, Dutchess, Orange, Putnam,, Region 08. 2 bids received; low bid $1,765,403 by Coyle Industries Inc..
- Owner
- New York State DOT
- Letting
- 13 MAR 2025
- Pay items
- 23
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Coyle Industries Inc. | $1,765,403 | Low |
| 2 | McCarey Landscaping Inc | $2,748,186 | +56% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Coyle Industries Inc. | 2. McCarey Landscaping Inc |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $8,000.00 | $19,364 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 801 | $1.00 | $137.27 |
| 3 | Cleaning Stormwater Treatment Device (208.60) | EACH | 154 | $2,500.00 | $2,757.44 |
| 4 | (420.75000008) | 67,422 | $1.50 | $1.50 | |
| 5 | Turf Establishment - Roadside (610.1601) | SY | 4,461 | $0.50 | $1.20 |
| 6 | (617.01010024) | 10,000 | $1.25 | $1.32 | |
| 7 | (617.01020024) | 3,000 | $3.00 | $7.49 | |
| 8 | (617.11000024) | LS | 1 | $12,500 | $4,050.77 |
| 9 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $50,000 | $216,463 |
| 10 | Stone Filling (Light) (620.03) | CY | 50 | $150.00 | $193.16 |
| 11 | Cleaning Closed Drainage Systems (621.03) | LF | 3,024 | $2.50 | $11.91 |
| 12 | Cleaning Drainage Structures (621.04) | EACH | 190 | $412.50 | $809.17 |
| 13 | Survey Operations (625.01) | LS | 1 | $1.00 | $3,023.15 |
| 14 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 24 | $3,000.00 | $3,867.31 |
| 15 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 |
| 16 | (642.15000003) | 8,514 | $2.00 | $2.77 | |
| 17 | (642.16010008) | 152,440 | $0.30 | $1.25 | |
| 18 | (642.16020008) | 7,615,720 | $0.11 | $0.16 | |
| 19 | Field Change Payment (FCP) (697.03) | DOL | 50,000 | $1.00 | $1.00 |
| 20 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 |
| 21 | Fuel Price Adjustment (698.05) | DOL | 113 | $1.00 | $1.00 |
| 22 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 23 | Mobilization (699.040001) | LS | 1 | $66,000 | $89,415 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.