Engineer’s Field Office – Type 2, NYSDOT 637.12

Low bidders on NYSDOT contracts carried a median of $2,500.00 per MONTH for this item, over the 24 months to 15 OCT 2026, across 188 low bids. Half of all 621 bids fell between $2,000.00 and $3,175.00.

Owner
New York State DOT
Item
637.12
Unit
MONTH
Data through
15 OCT 2026
$2,500.00Low bidder's median, per MONTH
$2,500.00Median of all bids, per MONTH
194Contracts in the window

By year of letting

Engineer’s Field Office – Type 2, NYSDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
202210599$2,200.00356$2,400.00
20239693$2,500.00338$2,500.00
20247974$2,500.00254$2,500.00
2025106104$2,472.27325$2,500.00
20267168$2,500.00227$2,625.00

Bid prices as published, not adjusted for inflation.

By region

RegionLow bidsLow-bid medianAll bidsMedian, all bids
Region 0543$2,000.00149$2,150.00
Region 0425$2,500.0085$2,500.00
Region 0129$3,000.0082$3,000.00
Region 0222$2,500.0069$3,000.00
Region 0723$2,200.0069$2,500.00
Region 0915$2,500.0065$2,800.00
Region 0817$2,500.0053$2,900.00
Region 038$3,000.0023$3,000.00
Region 103$4,500.0016$6,500.00
Engineer’s Field Office – Type 2, NYSDOT: unit prices by region, last 24 months

Regions with at least three low bids, over the last 24 months.

By quantity

Quantity (MONTH)Low bidsLow-bid median
5 to 1047$2,500.00
10 to 1547$2,500.00
15 to 2147$2,500.00
21 to 6647$2,400.00
Engineer’s Field Office – Type 2, NYSDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

Engineer’s Field Office – Type 2, NYSDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractRegionQuantityLow bidder's priceMedianBidsLow bidderSource
15 OCT 2026D265834Region 0212$2,500.00$3,500.005Callanan Industries IncNYSDOT
15 OCT 2026D265848Region 0812$3,467.00$3,025.003Power Line Constructors IncNYSDOT
01 OCT 2026D265832Region 0814$2,500.00$2,890.005Verde Electric Maintenance CorpNYSDOT
01 OCT 2026D265850Region 0514$3,265.00$2,400.003Lake Shore Paving IncNYSDOT
17 SEP 2026D265806Region 0914$1,420.00$2,775.006Maple Ridge Civil LLCNYSDOT
17 SEP 2026D265846Region 0512$2,500.00$2,500.002Accent Stripe IncNYSDOT
17 SEP 2026D265847Region 0539n/a$2,600.004Concrete Applied Technologies Corp/DBA:CatcoNYSDOT
27 AUG 2026D265794Region 0926$2,500.00$2,750.006Bothar Construction LLCNYSDOT
27 AUG 2026D265810Region 098$2,575.00$4,125.003Bothar Construction LLCNYSDOT
27 AUG 2026D265825Region 0114$2,625.00$3,200.003Emi Guide Rail LLCNYSDOT
13 AUG 2026D265689Region 0426$3,300.00$2,800.008Ramsey Constructors IncNYSDOT
30 JUL 2026D265807Region 028$2,500.00$3,600.004Bothar Construction LLCNYSDOT
16 JUL 2026D265802Region 0711$2,000.00$2,500.002Bette & Cring LLCNYSDOT
16 JUL 2026D265816Region 0116$2,242.50$2,242.503DLC Electric LLCNYSDOT
25 JUN 2026D265784Region 0716$2,200.00$2,350.004Winn Construction Services IncNYSDOT
Latest NYSDOT contracts carrying Engineer’s Field Office – Type 2

Filter this item by your own quantity, region and period, or check your price against it, in the NYSDOT explorer.

How these prices were read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are NYSDOT's own: this item is compared with NYSDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the NYSDOT letting of 15 OCT 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy