Concrete Applied Technologies Corp/DBA:Catco: NYSDOT bid record
Concrete Applied Technologies Corp/DBA:Catco submitted 95 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 01 OCT 2026, and was the low bidder on 34 of them (36%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $176,304,967
- Latest bid
- 01 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 11 | 4 | 36% |
| 2023 | 18 | 8 | 44% |
| 2024 | 19 | 8 | 42% |
| 2025 | 30 | 9 | 30% |
| 2026 | 17 | 5 | 29% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 05 | 92 | 33 | 36% |
| Region 04 | 2 | 1 | 50% |
| Region 06 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel Price Adjustment | 698.05 | DOL | 86 | 86 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 86 | 86 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 85 | 85 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 85 | 85 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 77 | 77 (100%) | $1.00 | $1.00 |
| 662.60000108 | 45 | 45 (100%) | $1.00 | $1.00 | ||
| Construction Testing supplies – Consumables | 637.36 | DOL | 41 | 41 (100%) | $1.00 | $1.00 |
| Diluted Tack Coat | 407.0102 | GAL | 64 | 33 (52%) | $6.00 | $7.00 |
| Riser Assembly, 1-inch Diameter | 680.700603 | EACH | 41 | 28 (68%) | $1,000.00 | $1,100.00 |
| 662.60000208 | 27 | 27 (100%) | $1.00 | $1.00 | ||
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 24 | 24 (100%) | $85.00 | $85.00 |
| 662.60000308 | 24 | 24 (100%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| McLaughlin Construction Corp/DBA Edbauer Construction | 55 | 26 of 55 |
| Cold Spring Construction Company | 41 | 11 of 41 |
| Oakgrove Construction Inc | 29 | 14 of 29 |
| D&H Excavating Inc | 22 | 13 of 22 |
| Union Concrete & Construction Corp | 19 | 18 of 19 |
| Lake Shore Paving Inc | 14 | 8 of 14 |
| Millennium Construction Inc | 10 | 5 of 10 |
| The L C Whitford Co Inc | 9 | 1 of 9 |
| Occhino Corp | 8 | 2 of 8 |
| Amherst Paving Inc | 4 | 2 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | D265850 | Region 05 | NY Route 474 ADA & Pedestrian Improvements; Town of Clymer | 2 of 3 | $2,323,115 | +3.0% |
| 17 SEP 2026 | D265847 | Region 05 | Signal Requirements; SFY 26/27, 27/28, 28/29 | 1 of 5 | $1,900,363 | Low, 40% under the second |
| 25 JUN 2026 | D265801 | Region 05 | SMALL CULVERT MAINTENANCE; SFY 26/27 | 2 of 3 | $1,491,335 | +11% |
| 21 MAY 2026 | D265772 | Region 05 | Culvert Replacement & Signal Rehabilitation - I-990 & NY-263 | 3 of 4 | $4,283,646 | +19% |
| 21 MAY 2026 | D265798 | Region 05 | Highway Rehabilitation - NY 394 | 1 of 2 | $3,717,394 | Low, 6.0% under the second |
| 07 MAY 2026 | D265770 | Region 05 | US 219 Crack & Seat & C540082 Rehabilitation | 3 of 4 | $11,858,693 | +15% |
| 07 MAY 2026 | D265787 | Region 05 | Highway Rehabilitation Project: NY Routes 78 & 31 | 2 of 2 | $5,689,327 | +3.0% |
| 07 MAY 2026 | D265789 | Region 05 | NY-26 - Mill & Resurface with Rehab of CIN 530053 | 1 of 2 | $5,248,142 | Low, 2.0% under the second |
| 16 APR 2026 | D265773 | Region 05 | HIGHWAY RESURFACING- Route NY 198, Scajaquada Expressway | 2 of 2 | $8,380,212 | +8.0% |
| 09 APR 2026 | D265775 | Region 05 | ADA Compliance and Signal Upgrades; SFY 26/27 | 2 of 2 | $1,331,779 | +35% |
| 09 APR 2026 | D265776 | Region 05 | ADA Compliance and Signal Upgrades; SFY 25/26 | 1 of 1 | $1,767,939 | Low |
| 12 MAR 2026 | D265690 | Region 05 | BRIDGE & CULVERT REPLACE; NY RT 5 & US RT 20, Twn of Evans | 3 of 4 | $29,630,584 | +24% |
| 12 MAR 2026 | D265757 | Region 05 | Maintenance Paving; NY-130, NY-263, US-62; Erie County | 3 of 3 | $7,069,044 | +24% |
| 12 MAR 2026 | D265758 | Region 05 | Maintenance Paving Contract; I-190 & NY-951A; Niagara County | 2 of 3 | $9,445,439 | +9.0% |
| 26 FEB 2026 | D265737 | Region 05 | TRAFFIC SIGNAL VEHICLE DETECTION | 3 of 4 | $824,458 | +15% |
| 05 FEB 2026 | D265609 | Region 05 | RECONSTRUCT/RESURFACE - NY Route 93 | 2 of 4 | $8,699,000 | +2.0% |
| 08 JAN 2026 | D265673 | Region 05 | PAVEMENT RESURFACING - Mill & Overlay of NY 954D | 1 of 1 | $10,523,301 | Low |
| 18 DEC 2025 | D265610 | Region 05 | BRIDGE REHABILITATION; 3 BINs on I-990, Town of Amherst | 2 of 2 | $10,843,873 | +25% |
| 18 DEC 2025 | D265619 | Region 05 | BRIDGE WHERE & WHEN CONTRACT; SFY 25/26 & 26/27 | 2 of 2 | $545,189 | +2.0% |
| 18 DEC 2025 | D265641 | Region 05 | LARGE CULVERT Replacement - NORTH, SFY 25/26 | 1 of 1 | $2,834,090 | Low |
| 18 DEC 2025 | D265642 | Region 05 | Centerline Audible Roadway Delineators; SFY 25/26 | 3 of 4 | $985,316 | +48% |
| 04 DEC 2025 | D265590 | Region 05 | STRUCTURE REPLACEMENT - NY Route 5 (S.H. 62-20) | 3 of 4 | $8,702,230 | +5.0% |
| 20 NOV 2025 | D265589 | Region 05 | LARGE CULVERT REPLACEMENT/REHABILITATION | 2 of 3 | $4,439,539 | +16% |
| 20 NOV 2025 | D265603 | Region 05 | HIGHWAY RESURFACING; I-86, Southern Tier Expressway; SNI | 5 of 6 | $5,990,586 | +8.0% |
| 06 NOV 2025 | D265588 | Region 05 | LARGE CULVERT REPLACEMENT/REHABILITATION | 3 of 3 | $3,574,338 | +9.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.