NY Route 474 ADA & Pedestrian Improvements; Town of Clymer. Let by New York State DOT on October 1, 2026, Chautauqua, Region 05. 3 bids received; low bid $2,245,147 by Lake Shore Paving Inc.
- Owner
- New York State DOT
- Letting
- 01 OCT 2026
- Pay items
- 140
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lake Shore Paving Inc | $2,245,147 | Low |
| 2 | Concrete Applied Technologies Corp/DBA:Catco | $2,323,115 | +3.0% |
| 3 | McLaughlin Construction Corp/DBA Edbauer Construction | $2,755,075 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lake Shore Paving Inc | 2. Concrete Applied Technologies Corp/DBA:Catco | 3. McLaughlin Construction Corp/DBA Edbauer Construction |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $5,100.00 | $1,000.00 | $10,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 1,310 | $60.00 | $75.00 | $150.00 |
| 3 | Embankment In Place (203.03) | CY | 215 | $29.20 | $35.00 | $45.00 |
| 4 | Select Granular Fill (203.07) | CY | 420 | $122.30 | $84.00 | $84.00 |
| 5 | (203.24010017) | 165 | $55.00 | $150.00 | $25.00 | |
| 6 | Structure Excavation (206.01) | CY | 450 | $31.90 | $41.00 | $24.00 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 1,310 | $110.00 | $31.00 | $38.00 |
| 8 | (206.03060005) | 13 | $116.50 | $200.00 | $175.00 | |
| 9 | Test Pit Excavation (206.05) | EACH | 2 | $1,070.00 | $2,500.00 | $3,500.00 |
| 10 | Geotextile Bedding (207.20) | SY | 55 | $25.55 | $30.00 | $15.00 |
| 11 | Geotextile Separation (207.21) | SY | 170 | $5.00 | $4.00 | $4.00 |
| 12 | Seed and Mulch – Temporary (209.1003) | SY | 1,750 | $5.55 | $1.00 | $0.10 |
| 13 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 16 | $266.15 | $320.00 | $1.00 |
| 14 | (209.23010009) | 200 | $19.65 | $11.00 | $1.00 | |
| 15 | (304.15200005) | 860 | $190.90 | $95.00 | $175.00 | |
| 16 | (404.0982) | TON | 85 | $291.00 | $275.00 | $475.00 |
| 17 | (404.1989) | TON | 45 | $265.30 | $180.00 | $425.00 |
| 18 | (404.3789) | TON | 65 | $277.55 | $160.00 | $325.00 |
| 19 | Diluted Tack Coat (407.0102) | GAL | 160 | $19.00 | $13.00 | $15.00 |
| 20 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 2,560 | $1.22 | $0.90 | $1.00 |
| 21 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 200 | $33.60 | $13.00 | $20.00 |
| 22 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 57 | $472.25 | $665.00 | $550.00 |
| 23 | Shields and Shoring (552.17) | SF | 8,000 | $0.60 | $0.30 | $0.50 |
| 24 | (553.030001) | EACH | 1 | $1.00 | $1.00 | $100.00 |
| 25 | (553.030002) | EACH | 1 | $1.00 | $1.00 | $100.00 |
| 26 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 8 | $1,036.80 | $1,040.00 | $1,055.00 |
| 27 | Transition Bridge Railing (568.70) | LF | 64 | $299.40 | $300.00 | $310.00 |
| 28 | (595.50000018) | 1,140 | $2.32 | $6.00 | $7.00 | |
| 29 | Culvert-End Safety Grate (603.0101) | SF | 100 | $52.57 | $45.00 | $30.00 |
| 30 | (603.051014) | LF | 24 | $69.86 | $159.00 | $400.00 |
| 31 | (603.051416) | LF | 16 | $102.89 | $297.00 | $253.00 |
| 32 | (603.171416) | EACH | 2 | $1,192.30 | $1,200.00 | $750.00 |
| 33 | (603.171614) | EACH | 1 | $1,412.00 | $1,500.00 | $1,320.00 |
| 34 | (603.63060415) | 57 | $1,820.00 | $1,650.00 | $1,800.00 | |
| 35 | (603.6606) | LF | 164 | $321.50 | $242.00 | $420.00 |
| 36 | Concrete Collars (603.77) | EACH | 18 | $1,205.00 | $2,400.00 | $1,700.00 |
| 37 | (603.9812) | LF | 142 | $16.75 | $30.00 | $140.00 |
| 38 | (603.9815) | LF | 85 | $21.38 | $35.00 | $145.00 |
| 39 | (603.9824) | LF | 13 | $98.50 | $82.00 | $320.00 |
| 40 | (603.99450005) | 15 | $253.00 | $97.00 | $155.00 | |
| 41 | (604.070501) | EACH | 10 | $1,034.70 | $3,350.00 | $4,000.00 |
| 42 | (604.070502) | EACH | 3 | $3,925.63 | $4,450.00 | $5,900.00 |
| 43 | (604.070503) | EACH | 2 | $5,284.00 | $5,250.00 | $8,000.00 |
| 44 | (604.07260011) | 4 | $1,625.40 | $1,050.00 | $1,687.00 | |
| 45 | (604.300103) | LF | 6 | $680.75 | $596.00 | $1,045.00 |
| 46 | (604.300711) | LF | 35 | $1,187.25 | $866.00 | $1,323.00 |
| 47 | (604.301911) | LF | 18 | $548.30 | $522.00 | $1,117.00 |
| 48 | (604.500501) | LF | 21 | $576.27 | $848.00 | $1,207.00 |
| 49 | Underdrain Filter, Type II (605.1001) | CY | 450 | $104.74 | $75.00 | $75.00 |
| 50 | (605.1701) | LF | 130 | $4.50 | $15.00 | $28.00 |
| 51 | (605.98101218) | 456 | $24.80 | $22.00 | $74.00 | |
| 52 | (605.98103618) | 464 | $91.20 | $74.00 | $130.00 | |
| 53 | Box Beam Guide Railing (606.10) | LF | 6 | $85.95 | $87.00 | $92.00 |
| 54 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $3,182.70 | $3,200.00 | $3,400.00 |
| 55 | (607.41010010) | 35 | $18.00 | $10.00 | $1.00 | |
| 56 | (607.95000008) | 110 | $15.65 | $8.00 | $7.00 | |
| 57 | Concrete Sidewalks and Driveways (608.0101) | CY | 298 | $688.78 | $840.00 | $1,246.00 |
| 58 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 30 | $314.24 | $250.00 | $550.00 |
| 59 | (608.21000003) | 24 | $595.50 | $495.00 | $510.00 | |
| 60 | (609.0401) | LF | 1,240 | $43.30 | $72.00 | $46.00 |
| 61 | (609.0403) | LF | 80 | $109.05 | $118.00 | $110.00 |
| 62 | Compost (610.10) | CY | 23 | $235.83 | $145.00 | $50.00 |
| 63 | Topsoil - Roadside (610.1402) | CY | 265 | $155.86 | $115.00 | $35.00 |
| 64 | Turf Establishment -Lawns (610.1602) | SY | 2,360 | $4.50 | $3.15 | $1.00 |
| 65 | Watering Vegetation (610.19) | 1,000 GALLONS | 26 | $277.24 | $350.00 | $25.00 |
| 66 | (611.0151) | EACH | 12 | $998.00 | $1,005.00 | $1,012.00 |
| 67 | (611.0291) | EACH | 33 | $610.00 | $965.00 | $1,075.00 |
| 68 | Portable Drip Irrigation System (611.17) | EACH | 45 | $83.17 | $70.00 | $87.00 |
| 69 | (611.19010024) | 12 | $138.62 | $490.00 | $110.00 | |
| 70 | (611.19020024) | 33 | $138.62 | $490.00 | $100.00 | |
| 71 | (613.04000001) | 33 | $98.35 | $130.00 | $45.00 | |
| 72 | Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411) | EACH | 1 | $1,940.68 | $1,100.00 | $2,300.00 |
| 73 | Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421) | EACH | 1 | $1,940.68 | $1,500.00 | $2,300.00 |
| 74 | Care of Trees Over 36” to 48” Diam. at Breast Height – Pruning (614.0441) | EACH | 1 | $3,000.00 | $2,200.00 | $100.00 |
| 75 | (615.99000110) | 12 | $1,693.54 | $1,420.00 | $1,700.00 | |
| 76 | (618.73115124) | 20 | $2,193.35 | $1,075.00 | $1,000.00 | |
| 77 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $90,314 | $243,700 | $220,520 |
| 78 | Type III Construction Barricades (619.04) | EACH | 12 | $227.88 | $80.00 | $120.00 |
| 79 | (619.110513) | EACH | 4 | $8,755.85 | $1,800.00 | $4,400.00 |
| 80 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 8 | $166.34 | $500.00 | $1,200.00 |
| 81 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $71.56 | $30.00 | $45.00 |
| 82 | Mailboxes (619.27) | EACH | 5 | $350.00 | $625.00 | $250.00 |
| 83 | Stone Filling (Medium) (620.04) | CY | 65 | $264.50 | $205.00 | $140.00 |
| 84 | Bedding Material, Type 1 (620.0801) | CY | 70 | $146.70 | $155.00 | $110.00 |
| 85 | Cleaning Closed Drainage Systems (621.03) | LF | 2,100 | $4.20 | $4.50 | $5.00 |
| 86 | Cleaning Drainage Structures (621.04) | EACH | 17 | $315.17 | $305.00 | $404.00 |
| 87 | (621.51000015) | 100 | $25.00 | $11.00 | $18.00 | |
| 88 | Crushed Gravel (By Weight) (623.02) | TON | 65 | $89.10 | $75.00 | $110.00 |
| 89 | Crushed Gravel (In-Place Measure) (623.11) | CY | 40 | $186.96 | $105.00 | $110.00 |
| 90 | Survey Operations (625.01) | LS | 1 | $45,350 | $36,000 | $75,000 |
| 91 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 58 | $332.00 | $590.00 | $325.00 |
| 92 | Permanent Survey Markers (625.06) | EACH | 8 | $1,996.00 | $2,000.00 | $2,500.00 |
| 93 | (627.50140008) | 2,700 | $6.12 | $7.50 | $12.00 | |
| 94 | (635.01030011) | 11,600 | $1.05 | $1.00 | $1.10 | |
| 95 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,200.00 | $3,700.00 | $100.00 |
| 96 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 14 | $3,265.00 | $2,400.00 | $1,100.00 |
| 97 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 98 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 8,550 | $0.86 | $0.90 | $1.00 |
| 99 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 3,850 | $0.86 | $0.90 | $1.00 |
| 100 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 8 | $37.70 | $39.00 | $40.00 |
| 101 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 581 | $39.92 | $40.00 | $41.00 |
| 102 | Type A Sign Posts (645.81) | EACH | 95 | $208.50 | $209.00 | $213.00 |
| 103 | (645.81090003) | 56 | $73.19 | $74.00 | $75.00 | |
| 104 | Reference Marker Panel (646.21) | EACH | 11 | $44.36 | $45.00 | $50.00 |
| 105 | Steel Post, 2.0 lb/ft (646.32) | EACH | 11 | $72.08 | $73.00 | $80.00 |
| 106 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 49 | $37.70 | $38.00 | $38.00 |
| 107 | (647.83001002) | 11 | $13.31 | $14.00 | $25.00 | |
| 108 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 1 | $1,250.88 | $1,650.00 | $2,450.00 |
| 109 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 16 | $1,538.54 | $1,730.00 | $2,500.00 |
| 110 | Manhole Frame & Cover (655.1202) | EACH | 6 | $1,210.74 | $1,040.00 | $1,900.00 |
| 111 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 112 | Adjust Existing Valve Box Elevation (663.33) | EACH | 10 | $353.82 | $570.00 | $450.00 |
| 113 | Adjust Existing Curb Box Elevation (663.35) | EACH | 5 | $353.82 | $570.00 | $350.00 |
| 114 | Pole Excavation and Concrete Foundation (680.5001) | CY | 5 | $3,653.08 | $3,600.00 | $3,550.00 |
| 115 | (680.50500005) | 2 | $443.59 | $1,000.00 | $720.00 | |
| 116 | (680.510201) | EACH | 2 | $2,273.36 | $2,600.00 | $3,500.00 |
| 117 | (680.510301) | EACH | 2 | $2,716.95 | $2,800.00 | $3,600.00 |
| 118 | (680.520508) | LF | 26 | $27.72 | $50.00 | $40.00 |
| 119 | (680.600534) | EACH | 2 | $16,246 | $26,225 | $16,000 |
| 120 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 1 | $4,380.40 | $5,200.00 | $5,878.00 |
| 121 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 1 | $1,608.00 | $1,000.00 | $1,700.00 |
| 122 | (680.730514) | LF | 932 | $6.65 | $5.50 | $8.00 |
| 123 | (680.79000105) | 1 | $3,881.36 | $4,000.00 | $5,420.00 | |
| 124 | (680.80620215) | 1 | $2,217.92 | $4,000.00 | $3,600.00 | |
| 125 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 8 | $138.62 | $200.00 | $200.00 |
| 126 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 8 | $243.97 | $260.00 | $162.00 |
| 127 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 8 | $526.76 | $350.00 | $439.00 |
| 128 | Traffic Signal Disconnect Hanger (680.8120) | EACH | 8 | $582.21 | $750.00 | $839.00 |
| 129 | Backplates for Traffic Signal Heads (680.8199) | EACH | 8 | $227.34 | $200.00 | $130.00 |
| 130 | Meter Pan (680.9402) | EACH | 1 | $1,996.12 | $1,000.00 | $1,320.00 |
| 131 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $1,552.55 | $1,200.00 | $789.00 |
| 132 | (680.950106) | LF | 102 | $6.65 | $27.00 | $13.00 |
| 133 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 |
| 134 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 3,320 | $4.38 | $4.30 | $4.75 |
| 135 | Field Change Payment (FCP) (697.03) | DOL | 91,000 | $1.00 | $1.00 | $1.00 |
| 136 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 137 | Fuel Price Adjustment (698.05) | DOL | 1,722 | $1.00 | $1.00 | $1.00 |
| 138 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 139 | (698.93940015) | LS | 1 | $30,000 | $30,000 | $30,000 |
| 140 | Mobilization (699.040001) | LS | 1 | $39,000 | $88,000 | $105,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 1, 2026. Compiled by Mirage Metrics.