By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 23 | 9 | 39% |
| 2023 | 15 | 2 | 13% |
| 2024 | 18 | 4 | 22% |
| 2025 | 17 | 4 | 24% |
| 2026 | 12 | 4 | 33% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 05 | 78 | 23 | 29% |
| Region 04 | 4 | 0 | 0% |
| Region 06 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 79 | 79 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 79 | 79 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 79 | 79 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 78 | 78 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 76 | 76 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 43 | 43 (100%) | $1.00 | $1.00 |
| Engineer’s Field Office – Type 2 | 637.12 | MONTH | 66 | 37 (56%) | $1,700.00 | $2,500.00 |
| Topsoil - Roadside | 610.1402 | CY | 55 | 34 (62%) | $74.00 | $105.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 49 | 34 (69%) | $0.25 | $1.00 |
| Trench and Culvert Excavation | 206.0201 | CY | 59 | 33 (56%) | $36.00 | $55.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 31 | 31 (100%) | $85.00 | $85.00 |
| 662.60000108 | 31 | 31 (100%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Concrete Applied Technologies Corp/DBA:Catco | 55 | 29 of 55 |
| Oakgrove Construction Inc | 33 | 18 of 33 |
| Cold Spring Construction Company | 30 | 6 of 30 |
| D&H Excavating Inc | 26 | 9 of 26 |
| Union Concrete & Construction Corp | 20 | 17 of 20 |
| Lake Shore Paving Inc | 16 | 11 of 16 |
| The L C Whitford Co Inc | 12 | 6 of 12 |
| Occhino Corp | 10 | 3 of 10 |
| Elderlee Inc | 5 | 3 of 5 |
| Hunting Valley Construction Inc | 4 | 2 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 OCT 2026 | D265838 | Region 05 | Guiderail Replacement Project; US-62 | 1 of 3 | $1,334,215 | Low, 4.0% under the second |
| 01 OCT 2026 | D265850 | Region 05 | NY Route 474 ADA & Pedestrian Improvements; Town of Clymer | 3 of 3 | $2,755,075 | +23% |
| 17 SEP 2026 | D265847 | Region 05 | Signal Requirements; SFY 26/27, 27/28, 28/29 | 2 of 5 | $2,665,915 | +40% |
| 13 AUG 2026 | D265689 | Region 04 | Replacement of Six Culverts | 4 of 8 | $9,078,115 | +25% |
| 25 JUN 2026 | D265801 | Region 05 | SMALL CULVERT MAINTENANCE; SFY 26/27 | 1 of 3 | $1,344,953 | Low, 11% under the second |
| 21 MAY 2026 | D265772 | Region 05 | Culvert Replacement & Signal Rehabilitation - I-990 & NY-263 | 2 of 4 | $3,946,658 | +9.0% |
| 07 MAY 2026 | D265770 | Region 05 | US 219 Crack & Seat & C540082 Rehabilitation | 2 of 4 | $10,986,908 | +7.0% |
| 07 MAY 2026 | D265787 | Region 05 | Highway Rehabilitation Project: NY Routes 78 & 31 | 1 of 2 | $5,517,774 | Low, 3.0% under the second |
| 12 MAR 2026 | D265757 | Region 05 | Maintenance Paving; NY-130, NY-263, US-62; Erie County | 2 of 3 | $6,817,839 | +19% |
| 12 MAR 2026 | D265758 | Region 05 | Maintenance Paving Contract; I-190 & NY-951A; Niagara County | 1 of 3 | $8,670,587 | Low, 9.0% under the second |
| 12 MAR 2026 | D265759 | Region 05 | NY-280; Highway Rehabilitation & Drainage Improvement | 3 of 4 | $9,426,733 | +9.0% |
| 05 FEB 2026 | D265609 | Region 05 | RECONSTRUCT/RESURFACE - NY Route 93 | 4 of 4 | $10,794,612 | +27% |
| 20 NOV 2025 | D265589 | Region 05 | LARGE CULVERT REPLACEMENT/REHABILITATION | 3 of 3 | $4,505,565 | +18% |
| 06 NOV 2025 | D265588 | Region 05 | LARGE CULVERT REPLACEMENT/REHABILITATION | 1 of 3 | $3,290,418 | Low, 8.0% under the second |
| 06 NOV 2025 | D265598 | Region 05 | ITS REHABILITATION - I-290, I-990, & NY 198 | 1 of 3 | $4,349,853 | Low, 3.0% under the second |
| 23 OCT 2025 | D265576 | Region 05 | Small Culvert Replacements -NY Route 950A | 4 of 6 | $1,788,911 | +53% |
| 23 OCT 2025 | D265591 | Region 05 | TRAFFIC SIGNAL POLE REPLACEMENTS - NY Rts 954G, 430,394 | 3 of 3 | $509,289 | +11% |
| 21 AUG 2025 | D265546 | Region 05 | TRAFFIC SIGNAL REPLACEMENTS; SFY 25/26 - CITY OF BUFFALO | 1 of 3 | $3,357,101 | Low, 15% under the second |
| 21 AUG 2025 | D265547 | Region 05 | SAFETY IMPROVEMENTS - US Route 20, NY Routes 5 & 952H | 5 of 5 | $6,055,990 | +7.0% |
| 24 JUL 2025 | D265506 | Region 05 | NY394-Mill & Resurfacing ADA Signal & Drainage Improvements | 3 of 3 | $7,582,222 | +7.0% |
| 10 JUL 2025 | D265505 | Region 05 | HIGHWAY RECONSTRUCTION - US 219 & Miller Rd Site Number: 01 Days Road User Cost Per Time Unit: $ 10000 | 2 of 5 | $5,937,785 | +16% |
| 26 JUN 2025 | D265504 | Region 05 | INTERSECTION IMPROVEMENTS; NY 952J at Murphy Rd and Duerr Rd | 2 of 4 | $3,747,004 | +21% |
| 22 MAY 2025 | D265494 | Region 05 | INTERSECTION IMPROVEMENT PROJECT; NY-179 | 1 of 5 | $3,826,255 | Low, 6.0% under the second |
| 24 APR 2025 | D265480 | Region 05 | NY Route 5 from NY 249 Commercial Street to Kennedy Avenue | 3 of 5 | $1,740,970 | +3.0% |
| 10 APR 2025 | D265487 | Region 05 | ADA Compliance and Signal Upgrades | 2 of 2 | $2,129,378 | +9.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.