NYSDOT contract D265494 bid tabulation

INTERSECTION IMPROVEMENT PROJECT; NY-179. Let by New York State DOT on May 22, 2025, Erie, Region 05. 5 bids received; low bid $3,826,255 by McLaughlin Construction Corp/DBA Edbauer Construction.

Owner
New York State DOT
Letting
22 MAY 2025
Pay items
181
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1McLaughlin Construction Corp/DBA Edbauer Construction$3,826,255Low
2Union Concrete & Construction Corp$4,064,600+6.0%
3D&H Excavating Inc$4,234,568+11%
4Oakgrove Construction Inc$4,398,143+15%
5Cold Spring Construction Company$4,529,000+18%
NYSDOT contract D265494: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. McLaughlin Construction Corp/DBA Edbauer Construction2. Union Concrete & Construction Corp3. D&H Excavating Inc4. Oakgrove Construction Inc5. Cold Spring Construction Company
1Clearing and Grubbing (201.06)LS1$50,000$2,000.00$12,122$5,000.00$15,000
2Unclassified Excavation and Disposal (203.02)CY2,987$50.00$39.00$45.00$40.00$50.00
3Embankment In Place (203.03)CY511$29.00$12.00$40.00$15.00$50.00
4Select Granular Fill (203.07)CY124$84.00$200.00$280.00$45.00$55.00
5 (205.0201)LS1$100.00$1,750.00$250.00$1,000.00$500.00
6Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR8$10.00$205.00$171.00$155.00$100.00
7Petroleum Contamination Parameter Analysis (205.0401)EACH2$10.00$495.00$176.00$360.00$250.00
8Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402)EACH1$15.00$2,000.00$114.00$800.00$200.00
9Laboratory Analysis for Ignitability (205.0403)EACH1$5.00$80.00$73.00$50.00$50.00
10Laboratory Analysis for ph (205.0404)EACH1$5.00$80.00$27.00$30.00$30.00
11Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405)EACH1$20.00$185.00$94.00$125.00$100.00
12Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406)EACH1$20.00$120.00$65.00$120.00$100.00
13Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407)EACH1$20.00$170.00$46.00$130.00$100.00
14 (205.050201)TON24$25.00$90.00$108.00$100.00$110.00
15Trench and Culvert Excavation (206.0201)CY872$38.00$33.00$195.00$50.00$50.00
16 (206.03050005)495$102.00$105.00$114.00$110.00$115.00
17 (206.03060005)885$54.00$53.00$57.00$65.00$50.00
18Test Pit Excavation (206.05)EACH9$1,850.00$2,100.00$950.00$2,500.00$3,000.00
19Geotextile Separation (207.21)SY2,987$1.33$1.90$7.50$2.00$2.00
20 (208.01030022)535$88.00$105.00$54.00$100.00$100.00
21 (208.01040022)1$50.00$350.00$125.00$450.00$150.00
22Seed and Mulch – Temporary (209.1003)SY3,600$0.25$0.85$2.70$1.50$1.00
23Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702)CY15$0.01$145.00$24.00$300.00$250.00
24Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY1,600$5.00$2.50$2.75$7.00$3.00
25 (209.23010009)1,480$1.50$6.00$9.50$8.00$6.00
26 (304.15010005)1,261$78.00$110.00$147.00$75.00$125.00
27 (404.0001)TON174$100.00$100.00$100.00$100.00$100.00
28 (404.0962)TON1,914$153.00$130.00$105.00$125.00$150.00
29 (404.1969)TON589$150.00$145.00$167.00$175.00$200.00
30 (404.3769)TON974$147.00$125.00$110.00$120.00$175.00
31Diluted Tack Coat (407.0102)GAL2,473$7.00$7.00$7.50$8.00$8.00
32Asphalt Pavement Joint Adhesive (418.7603)LF12,357$0.10$0.20$0.40$0.50$1.00
33Production Cold Milling of Bituminous Concrete (490.10)SY22,686$4.50$3.75$1.25$5.00$2.50
34Shields and Shoring (552.17)SF2,584$0.50$0.60$1.50$2.00$0.50
35Footing Concrete, Performance (555.0011)CY12$1,833.00$3,700.00$3,900.00$2,000.00$2,500.00
36Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$6.00$6.00$6.00$6.00$6.00
37Concrete Collars (603.77)EACH3$1,200.00$1,250.00$6,000.00$9,000.00$2,500.00
38 (603.9815)LF140$90.00$17.00$52.00$65.00$100.00
39 (603.9818)LF408$76.00$22.00$43.00$45.00$100.00
40 (603.9824)LF512$80.00$28.00$74.00$45.00$125.00
41 (604.070501)EACH1$2,900.00$1,200.00$1,100.00$2,000.00$5,000.00
42 (604.070502)EACH1$1,788.00$1,200.00$1,100.00$2,000.00$5,000.00
43 (604.070503)EACH1$1,788.00$1,200.00$1,100.00$2,000.00$5,000.00
44 (604.300103)LF44$888.00$625.00$880.00$750.00$1,000.00
45 (604.300203)LF11$1,080.00$715.00$940.00$800.00$1,000.00
46 (604.300503)LF12$1,090.00$715.00$900.00$800.00$1,000.00
47 (604.4048)LF6$1,200.00$530.00$470.00$565.00$1,250.00
48 (605.03010015)804$28.00$25.00$8.25$35.00$25.00
49 (605.03030015)12$190.00$35.00$125.00$200.00$350.00
50 (607.41010010)350$1.50$6.00$8.00$10.00$4.00
51Concrete Sidewalks and Driveways (608.0101)CY178$788.00$715.00$965.00$750.00$1,000.00
52 (608.01070415)279$62.00$65.00$75.00$80.00$160.00
53 (608.01070615)498$62.00$65.00$78.00$70.00$170.00
54 (609.0401)LF1,924$42.00$35.00$43.00$40.00$50.00
55Fertilizer (610.0501)LB350$3.00$2.00$3.50$4.00$3.50
56Compost (610.10)CY18$58.00$170.00$140.00$130.00$135.00
57Topsoil - Roadside (610.1402)CY600$94.00$70.00$115.00$70.00$110.00
58Turf Establishment -Lawns (610.1602)SY7,200$0.10$1.35$3.60$1.50$3.50
59Watering Vegetation (610.19)1,000 GALLONS78$10.00$12.00$250.00$100.00$225.00
60Mowing (610.21)SY7,100$0.35$0.30$0.60$0.50$0.60
61 (611.0151)EACH23$780.00$1,000.00$1,300.00$850.00$1,275.00
62 (611.0281)EACH35$780.00$945.00$1,000.00$750.00$1,000.00
63 (611.0361)EACH13$780.00$1,050.00$1,100.00$750.00$1,100.00
64Portable Drip Irrigation System (611.17)EACH71$78.00$79.00$88.00$80.00$80.00
65 (611.19010024)23$50.00$53.00$12.00$10.00$10.00
66 (611.19020024)35$50.00$53.00$12.00$10.00$10.00
67 (611.19030024)13$50.00$53.00$12.00$10.00$10.00
68 (614.060104)EACH24$250.00$300.00$200.00$600.00$250.00
69 (614.060204)EACH28$300.00$550.00$320.00$800.00$300.00
70 (614.060304)EACH9$400.00$850.00$1,000.00$1,000.00$750.00
71 (617.10000024)20$25.00$115.00$90.00$50.00$25.00
72 (617.11000024)LS1$50.00$250.00$360.00$500.00$100.00
73Basic Work Zone Traffic Control (619.01)LS1$323,000$348,600$102,000$550,000$225,000
74Type III Construction Barricades (619.04)EACH7$150.00$130.00$50.00$100.00$150.00
75Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF16,222$1.50$2.90$0.01$0.50$1.50
76 (619.100103)LF27,321$1.50$2.00$0.01$0.50$1.50
77 (619.111113)EACH4$10,000$8,500.00$5,100.00$7,500.00$15,000
78Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH36$10.00$210.00$225.00$200.00$250.00
79 (619.2401)LS1$12,000$35,000$42,000$50,000$35,000
80Cleaning Closed Drainage Systems (621.03)LF2,572$5.00$8.25$8.00$5.00$4.00
81Cleaning Drainage Structures (621.04)EACH25$250.00$225.00$275.00$300.00$200.00
82Crushed Gravel (In-Place Measure) (623.11)CY90$124.00$95.00$112.00$125.00$150.00
83Survey Operations (625.01)LS1$73,000$50,000$26,000$25,000$40,000
84 (625.09010015)LS1$0.01$500.00$9,000.00$1,000.00$1,250.00
85 (627.50140008)2,393$8.00$4.50$6.25$2.00$8.00
86Concrete Cylinder Curing Equipment (637.04)EACH1$2,000.00$500.00$725.00$2,500.00$500.00
87Engineer’s Field Office – Type 3 (637.13)MONTH18$2,200.00$2,150.00$2,000.00$2,000.00$3,000.00
88Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00$1.00$1.00
89Construction Testing supplies – Consumables (637.36)DOL500$1.00$1.00$1.00$1.00$1.00
90 (645.17030008)2$820.00$1,000.00$600.00$1,000.00$2,500.00
91Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF375$48.00$40.00$51.00$40.00$45.00
92Overhead Sign Panels (645.61)SF151$84.00$107.00$112.00$60.00$50.00
93Type A Sign Posts (645.81)EACH53$245.00$235.00$260.00$225.00$250.00
94High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH6$1,375.00$1,435.00$1,440.00$1,400.00$1,500.00
95 (645.81090003)4$100.00$82.00$96.00$80.00$85.00
96 (645.830302)EACH4$5,700.00$3,000.00$6,000.00$3,000.00$4,000.00
97Reference Marker Panel (646.21)EACH6$50.00$42.00$43.00$45.00$45.00
98Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH2$50.00$25.00$25.00$30.00$25.00
99Steel Post, 2.0 lb/ft (646.32)EACH4$105.00$100.00$110.00$100.00$100.00
100Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH1$332.00$180.00$350.00$200.00$185.00
101Relocate Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.32)EACH1$783.00$230.00$250.00$250.00$235.00
102Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH25$7.00$30.00$7.00$30.00$40.00
103Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH1$20.00$70.00$13.50$70.00$80.00
104 (647.83001002)4$10.00$11.50$5.70$15.00$12.00
105Welded Frame & Reticuline Grate 3 (655.1103)EACH12$1,700.00$1,570.00$1,580.00$1,200.00$1,500.00
106Manhole Frame & Cover (655.1202)EACH1$1,625.00$1,040.00$1,420.00$1,000.00$1,750.00
107 (662.60000108)2,500$1.00$1.00$1.00$1.00$1.00
108 (662.60000208)2,500$1.00$1.00$1.00$1.00$1.00
109 (662.60000308)2,500$1.00$1.00$1.00$1.00$1.00
110 (662.60000408)2,500$1.00$1.00$1.00$1.00$1.00
111 (662.60000508)2,500$1.00$1.00$1.00$1.00$1.00
112Adjust Existing Valve Box Elevation (663.33)EACH6$575.00$275.00$340.00$250.00$1,000.00
113 (680.05010007)2$22,000$26,250$28,500$22,500$22,000
114 (680.05020007)2$2,770.00$6,000.00$6,500.00$4,500.00$5,000.00
115 (680.05040004)4$2,215.00$5,600.00$6,100.00$4,000.00$3,500.00
116 (680.11120814)2$5,600.00$10,700$11,700$12,000$10,000
117 (680.11131014)8$2,800.00$8,600.00$9,300.00$8,000.00$10,000
118Pole Excavation and Concrete Foundation (680.5001)CY52$2,275.00$3,360.00$3,700.00$4,000.00$2,000.00
119Concrete Base for Controller Cabinet (680.5002)EACH2$1,733.00$4,200.00$4,600.00$7,500.00$1,250.00
120Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH2$1,700.00$1,575.00$1,700.00$3,000.00$4,000.00
121 (680.50500005)27$50.00$21.00$23.00$750.00$300.00
122 (680.510201)EACH8$2,042.00$2,200.00$2,400.00$2,000.00$2,750.00
123 (680.510301)EACH10$2,050.00$2,500.00$2,800.00$2,500.00$3,500.00
124 (680.520105)LF124$22.00$52.50$57.00$25.00$22.00
125 (680.520506)LF178$10.00$10.50$12.00$15.00$34.00
126 (680.520508)LF2,836$5.25$14.70$16.00$22.00$50.00
127 (680.622029)EACH1$12,684$14,400$15,700$15,000$15,000
128 (680.622054)EACH1$24,516$24,300$26,400$30,000$25,000
129 (680.622055)EACH1$26,000$24,100$26,200$30,000$25,000
130 (680.622059)EACH2$28,000$24,600$26,500$30,000$25,000
131 (680.622061)EACH1$29,000$24,300$26,000$30,000$28,000
132 (680.622062)EACH3$30,000$24,700$27,000$30,000$28,000
133Riser Assembly, 1-inch Diameter (680.700603)EACH4$1,800.00$1,050.00$1,100.00$1,500.00$1,500.00
134 (680.730514)LF5,105$1.88$5.00$5.50$5.00$3.75
135 (680.730714)LF2,095$3.70$5.25$5.75$6.00$4.50
136 (680.77000305)1$1,459.00$2,625.00$2,800.00$3,000.00$5,000.00
137 (680.78010005)4$540.00$1,000.00$1,000.00$750.00$1,500.00
138 (680.79000105)1$6,539.00$6,825.00$7,400.00$8,000.00$5,000.00
139 (680.79000205)1$6,539.00$4,200.00$4,500.00$8,000.00$5,000.00
140 (680.79000305)1$2,463.00$1,680.00$1,900.00$5,000.00$5,000.00
141 (680.79000405)1$4,586.00$6,825.00$7,400.00$3,000.00$5,000.00
142 (680.79000505)1$4,586.00$6,825.00$7,400.00$5,000.00$5,000.00
143 (680.80150203)2$19,713$42,000$45,500$25,000$30,000
144 (680.80324515)4$1,089.00$4,200.00$4,600.00$3,500.00$1,000.00
145 (680.80324708)2$1,100.00$2,100.00$2,300.00$2,000.00$2,500.00
146Traffic Signal Module - 12-inch, Red Ball, LED (680.810101)EACH13$42.00$150.00$160.00$125.00$175.00
147Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102)EACH7$45.00$150.00$160.00$150.00$185.00
148Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103)EACH13$42.00$158.00$170.00$150.00$185.00
149Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104)EACH17$45.00$158.00$170.00$150.00$195.00
150Traffic Signal Module - 12-inch, Green Ball, LED (680.810105)EACH13$42.00$170.00$180.00$150.00$195.00
151Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106)EACH13$45.00$170.00$180.00$175.00$195.00
152Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH76$263.00$180.00$200.00$225.00$175.00
153Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH20$242.00$735.00$800.00$500.00$750.00
154Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105)EACH6$137.00$290.00$310.00$300.00$325.00
155Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH12$153.00$290.00$310.00$300.00$325.00
156Pedestrian Signal Bracket Mount Assembly (680.8141)EACH6$1,960.00$395.00$425.00$450.00$600.00
157Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001)EACH6$137.00$300.00$320.00$300.00$500.00
158 (680.8151)EACH6$2,215.00$300.00$320.00$1,200.00$2,500.00
159 (680.81990003)20$264.00$400.00$430.00$500.00$500.00
160 (680.8205)EACH21$945.00$940.00$1,000.00$1,000.00$750.00
161 (680.82250801)20$102.00$630.00$500.00$750.00$750.00
162 (680.82252310)8$100.00$2,000.00$15,700$15,000$10,000
163 (680.83010005)313$7.00$1.00$1.25$5.00$6.00
164Meter Pan (680.9402)EACH4$443.00$1,050.00$1,200.00$1,800.00$1,250.00
165Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH4$2,770.00$850.00$920.00$1,500.00$1,000.00
166 (680.95010105)4$3,428.00$4,000.00$4,300.00$3,500.00$7,500.00
167 (680.950106)LF2,739$3.88$4.00$4.25$5.00$2.50
168Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$10.00$10.00$10.00$10.00$10.00
169 (683.08010105)2$67,694$115,000$112,000$82,500$77,500
170 (685.07200210)52$90.00$82.00$88.00$80.00$90.00
171 (685.07200310)37$249.00$240.00$260.00$235.00$350.00
172 (685.07200910)5$130.00$126.00$136.00$125.00$90.00
173White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF11,868$0.70$0.70$0.72$0.75$0.85
174Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF11,601$0.70$0.70$0.72$0.75$0.85
175White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF5,478$4.10$3.95$4.25$4.00$3.25
176Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204)LF6,491$4.10$3.95$4.25$4.00$3.25
177Field Change Payment (FCP) (697.03)DOL178,300$1.00$1.00$1.00$1.00$1.00
178Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00$1.00$1.00
179Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00
180Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
181Mobilization (699.040001)LS1$147,000$155,973$160,000$169,150$173,418
NYSDOT contract D265494: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of May 22, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy