NYSDOT contract D265494 bid tabulation
INTERSECTION IMPROVEMENT PROJECT; NY-179. Let by New York State DOT on May 22, 2025, Erie, Region 05. 5 bids received; low bid $3,826,255 by McLaughlin Construction Corp/DBA Edbauer Construction.
- Owner
- New York State DOT
- Letting
- 22 MAY 2025
- Pay items
- 181
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McLaughlin Construction Corp/DBA Edbauer Construction | $3,826,255 | Low |
| 2 | Union Concrete & Construction Corp | $4,064,600 | +6.0% |
| 3 | D&H Excavating Inc | $4,234,568 | +11% |
| 4 | Oakgrove Construction Inc | $4,398,143 | +15% |
| 5 | Cold Spring Construction Company | $4,529,000 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McLaughlin Construction Corp/DBA Edbauer Construction | 2. Union Concrete & Construction Corp | 3. D&H Excavating Inc | 4. Oakgrove Construction Inc | 5. Cold Spring Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $50,000 | $2,000.00 | $12,122 | $5,000.00 | $15,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 2,987 | $50.00 | $39.00 | $45.00 | $40.00 | $50.00 |
| 3 | Embankment In Place (203.03) | CY | 511 | $29.00 | $12.00 | $40.00 | $15.00 | $50.00 |
| 4 | Select Granular Fill (203.07) | CY | 124 | $84.00 | $200.00 | $280.00 | $45.00 | $55.00 |
| 5 | (205.0201) | LS | 1 | $100.00 | $1,750.00 | $250.00 | $1,000.00 | $500.00 |
| 6 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $10.00 | $205.00 | $171.00 | $155.00 | $100.00 |
| 7 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $10.00 | $495.00 | $176.00 | $360.00 | $250.00 |
| 8 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $15.00 | $2,000.00 | $114.00 | $800.00 | $200.00 |
| 9 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $5.00 | $80.00 | $73.00 | $50.00 | $50.00 |
| 10 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $5.00 | $80.00 | $27.00 | $30.00 | $30.00 |
| 11 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $20.00 | $185.00 | $94.00 | $125.00 | $100.00 |
| 12 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $20.00 | $120.00 | $65.00 | $120.00 | $100.00 |
| 13 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $20.00 | $170.00 | $46.00 | $130.00 | $100.00 |
| 14 | (205.050201) | TON | 24 | $25.00 | $90.00 | $108.00 | $100.00 | $110.00 |
| 15 | Trench and Culvert Excavation (206.0201) | CY | 872 | $38.00 | $33.00 | $195.00 | $50.00 | $50.00 |
| 16 | (206.03050005) | 495 | $102.00 | $105.00 | $114.00 | $110.00 | $115.00 | |
| 17 | (206.03060005) | 885 | $54.00 | $53.00 | $57.00 | $65.00 | $50.00 | |
| 18 | Test Pit Excavation (206.05) | EACH | 9 | $1,850.00 | $2,100.00 | $950.00 | $2,500.00 | $3,000.00 |
| 19 | Geotextile Separation (207.21) | SY | 2,987 | $1.33 | $1.90 | $7.50 | $2.00 | $2.00 |
| 20 | (208.01030022) | 535 | $88.00 | $105.00 | $54.00 | $100.00 | $100.00 | |
| 21 | (208.01040022) | 1 | $50.00 | $350.00 | $125.00 | $450.00 | $150.00 | |
| 22 | Seed and Mulch – Temporary (209.1003) | SY | 3,600 | $0.25 | $0.85 | $2.70 | $1.50 | $1.00 |
| 23 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 15 | $0.01 | $145.00 | $24.00 | $300.00 | $250.00 |
| 24 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 1,600 | $5.00 | $2.50 | $2.75 | $7.00 | $3.00 |
| 25 | (209.23010009) | 1,480 | $1.50 | $6.00 | $9.50 | $8.00 | $6.00 | |
| 26 | (304.15010005) | 1,261 | $78.00 | $110.00 | $147.00 | $75.00 | $125.00 | |
| 27 | (404.0001) | TON | 174 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 28 | (404.0962) | TON | 1,914 | $153.00 | $130.00 | $105.00 | $125.00 | $150.00 |
| 29 | (404.1969) | TON | 589 | $150.00 | $145.00 | $167.00 | $175.00 | $200.00 |
| 30 | (404.3769) | TON | 974 | $147.00 | $125.00 | $110.00 | $120.00 | $175.00 |
| 31 | Diluted Tack Coat (407.0102) | GAL | 2,473 | $7.00 | $7.00 | $7.50 | $8.00 | $8.00 |
| 32 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 12,357 | $0.10 | $0.20 | $0.40 | $0.50 | $1.00 |
| 33 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 22,686 | $4.50 | $3.75 | $1.25 | $5.00 | $2.50 |
| 34 | Shields and Shoring (552.17) | SF | 2,584 | $0.50 | $0.60 | $1.50 | $2.00 | $0.50 |
| 35 | Footing Concrete, Performance (555.0011) | CY | 12 | $1,833.00 | $3,700.00 | $3,900.00 | $2,000.00 | $2,500.00 |
| 36 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 37 | Concrete Collars (603.77) | EACH | 3 | $1,200.00 | $1,250.00 | $6,000.00 | $9,000.00 | $2,500.00 |
| 38 | (603.9815) | LF | 140 | $90.00 | $17.00 | $52.00 | $65.00 | $100.00 |
| 39 | (603.9818) | LF | 408 | $76.00 | $22.00 | $43.00 | $45.00 | $100.00 |
| 40 | (603.9824) | LF | 512 | $80.00 | $28.00 | $74.00 | $45.00 | $125.00 |
| 41 | (604.070501) | EACH | 1 | $2,900.00 | $1,200.00 | $1,100.00 | $2,000.00 | $5,000.00 |
| 42 | (604.070502) | EACH | 1 | $1,788.00 | $1,200.00 | $1,100.00 | $2,000.00 | $5,000.00 |
| 43 | (604.070503) | EACH | 1 | $1,788.00 | $1,200.00 | $1,100.00 | $2,000.00 | $5,000.00 |
| 44 | (604.300103) | LF | 44 | $888.00 | $625.00 | $880.00 | $750.00 | $1,000.00 |
| 45 | (604.300203) | LF | 11 | $1,080.00 | $715.00 | $940.00 | $800.00 | $1,000.00 |
| 46 | (604.300503) | LF | 12 | $1,090.00 | $715.00 | $900.00 | $800.00 | $1,000.00 |
| 47 | (604.4048) | LF | 6 | $1,200.00 | $530.00 | $470.00 | $565.00 | $1,250.00 |
| 48 | (605.03010015) | 804 | $28.00 | $25.00 | $8.25 | $35.00 | $25.00 | |
| 49 | (605.03030015) | 12 | $190.00 | $35.00 | $125.00 | $200.00 | $350.00 | |
| 50 | (607.41010010) | 350 | $1.50 | $6.00 | $8.00 | $10.00 | $4.00 | |
| 51 | Concrete Sidewalks and Driveways (608.0101) | CY | 178 | $788.00 | $715.00 | $965.00 | $750.00 | $1,000.00 |
| 52 | (608.01070415) | 279 | $62.00 | $65.00 | $75.00 | $80.00 | $160.00 | |
| 53 | (608.01070615) | 498 | $62.00 | $65.00 | $78.00 | $70.00 | $170.00 | |
| 54 | (609.0401) | LF | 1,924 | $42.00 | $35.00 | $43.00 | $40.00 | $50.00 |
| 55 | Fertilizer (610.0501) | LB | 350 | $3.00 | $2.00 | $3.50 | $4.00 | $3.50 |
| 56 | Compost (610.10) | CY | 18 | $58.00 | $170.00 | $140.00 | $130.00 | $135.00 |
| 57 | Topsoil - Roadside (610.1402) | CY | 600 | $94.00 | $70.00 | $115.00 | $70.00 | $110.00 |
| 58 | Turf Establishment -Lawns (610.1602) | SY | 7,200 | $0.10 | $1.35 | $3.60 | $1.50 | $3.50 |
| 59 | Watering Vegetation (610.19) | 1,000 GALLONS | 78 | $10.00 | $12.00 | $250.00 | $100.00 | $225.00 |
| 60 | Mowing (610.21) | SY | 7,100 | $0.35 | $0.30 | $0.60 | $0.50 | $0.60 |
| 61 | (611.0151) | EACH | 23 | $780.00 | $1,000.00 | $1,300.00 | $850.00 | $1,275.00 |
| 62 | (611.0281) | EACH | 35 | $780.00 | $945.00 | $1,000.00 | $750.00 | $1,000.00 |
| 63 | (611.0361) | EACH | 13 | $780.00 | $1,050.00 | $1,100.00 | $750.00 | $1,100.00 |
| 64 | Portable Drip Irrigation System (611.17) | EACH | 71 | $78.00 | $79.00 | $88.00 | $80.00 | $80.00 |
| 65 | (611.19010024) | 23 | $50.00 | $53.00 | $12.00 | $10.00 | $10.00 | |
| 66 | (611.19020024) | 35 | $50.00 | $53.00 | $12.00 | $10.00 | $10.00 | |
| 67 | (611.19030024) | 13 | $50.00 | $53.00 | $12.00 | $10.00 | $10.00 | |
| 68 | (614.060104) | EACH | 24 | $250.00 | $300.00 | $200.00 | $600.00 | $250.00 |
| 69 | (614.060204) | EACH | 28 | $300.00 | $550.00 | $320.00 | $800.00 | $300.00 |
| 70 | (614.060304) | EACH | 9 | $400.00 | $850.00 | $1,000.00 | $1,000.00 | $750.00 |
| 71 | (617.10000024) | 20 | $25.00 | $115.00 | $90.00 | $50.00 | $25.00 | |
| 72 | (617.11000024) | LS | 1 | $50.00 | $250.00 | $360.00 | $500.00 | $100.00 |
| 73 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $323,000 | $348,600 | $102,000 | $550,000 | $225,000 |
| 74 | Type III Construction Barricades (619.04) | EACH | 7 | $150.00 | $130.00 | $50.00 | $100.00 | $150.00 |
| 75 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 16,222 | $1.50 | $2.90 | $0.01 | $0.50 | $1.50 |
| 76 | (619.100103) | LF | 27,321 | $1.50 | $2.00 | $0.01 | $0.50 | $1.50 |
| 77 | (619.111113) | EACH | 4 | $10,000 | $8,500.00 | $5,100.00 | $7,500.00 | $15,000 |
| 78 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 36 | $10.00 | $210.00 | $225.00 | $200.00 | $250.00 |
| 79 | (619.2401) | LS | 1 | $12,000 | $35,000 | $42,000 | $50,000 | $35,000 |
| 80 | Cleaning Closed Drainage Systems (621.03) | LF | 2,572 | $5.00 | $8.25 | $8.00 | $5.00 | $4.00 |
| 81 | Cleaning Drainage Structures (621.04) | EACH | 25 | $250.00 | $225.00 | $275.00 | $300.00 | $200.00 |
| 82 | Crushed Gravel (In-Place Measure) (623.11) | CY | 90 | $124.00 | $95.00 | $112.00 | $125.00 | $150.00 |
| 83 | Survey Operations (625.01) | LS | 1 | $73,000 | $50,000 | $26,000 | $25,000 | $40,000 |
| 84 | (625.09010015) | LS | 1 | $0.01 | $500.00 | $9,000.00 | $1,000.00 | $1,250.00 |
| 85 | (627.50140008) | 2,393 | $8.00 | $4.50 | $6.25 | $2.00 | $8.00 | |
| 86 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,000.00 | $500.00 | $725.00 | $2,500.00 | $500.00 |
| 87 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 18 | $2,200.00 | $2,150.00 | $2,000.00 | $2,000.00 | $3,000.00 |
| 88 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 89 | Construction Testing supplies – Consumables (637.36) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 90 | (645.17030008) | 2 | $820.00 | $1,000.00 | $600.00 | $1,000.00 | $2,500.00 | |
| 91 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 375 | $48.00 | $40.00 | $51.00 | $40.00 | $45.00 |
| 92 | Overhead Sign Panels (645.61) | SF | 151 | $84.00 | $107.00 | $112.00 | $60.00 | $50.00 |
| 93 | Type A Sign Posts (645.81) | EACH | 53 | $245.00 | $235.00 | $260.00 | $225.00 | $250.00 |
| 94 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 6 | $1,375.00 | $1,435.00 | $1,440.00 | $1,400.00 | $1,500.00 |
| 95 | (645.81090003) | 4 | $100.00 | $82.00 | $96.00 | $80.00 | $85.00 | |
| 96 | (645.830302) | EACH | 4 | $5,700.00 | $3,000.00 | $6,000.00 | $3,000.00 | $4,000.00 |
| 97 | Reference Marker Panel (646.21) | EACH | 6 | $50.00 | $42.00 | $43.00 | $45.00 | $45.00 |
| 98 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 2 | $50.00 | $25.00 | $25.00 | $30.00 | $25.00 |
| 99 | Steel Post, 2.0 lb/ft (646.32) | EACH | 4 | $105.00 | $100.00 | $110.00 | $100.00 | $100.00 |
| 100 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $332.00 | $180.00 | $350.00 | $200.00 | $185.00 |
| 101 | Relocate Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.32) | EACH | 1 | $783.00 | $230.00 | $250.00 | $250.00 | $235.00 |
| 102 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 25 | $7.00 | $30.00 | $7.00 | $30.00 | $40.00 |
| 103 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 1 | $20.00 | $70.00 | $13.50 | $70.00 | $80.00 |
| 104 | (647.83001002) | 4 | $10.00 | $11.50 | $5.70 | $15.00 | $12.00 | |
| 105 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 12 | $1,700.00 | $1,570.00 | $1,580.00 | $1,200.00 | $1,500.00 |
| 106 | Manhole Frame & Cover (655.1202) | EACH | 1 | $1,625.00 | $1,040.00 | $1,420.00 | $1,000.00 | $1,750.00 |
| 107 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 108 | (662.60000208) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 109 | (662.60000308) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 110 | (662.60000408) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 111 | (662.60000508) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 112 | Adjust Existing Valve Box Elevation (663.33) | EACH | 6 | $575.00 | $275.00 | $340.00 | $250.00 | $1,000.00 |
| 113 | (680.05010007) | 2 | $22,000 | $26,250 | $28,500 | $22,500 | $22,000 | |
| 114 | (680.05020007) | 2 | $2,770.00 | $6,000.00 | $6,500.00 | $4,500.00 | $5,000.00 | |
| 115 | (680.05040004) | 4 | $2,215.00 | $5,600.00 | $6,100.00 | $4,000.00 | $3,500.00 | |
| 116 | (680.11120814) | 2 | $5,600.00 | $10,700 | $11,700 | $12,000 | $10,000 | |
| 117 | (680.11131014) | 8 | $2,800.00 | $8,600.00 | $9,300.00 | $8,000.00 | $10,000 | |
| 118 | Pole Excavation and Concrete Foundation (680.5001) | CY | 52 | $2,275.00 | $3,360.00 | $3,700.00 | $4,000.00 | $2,000.00 |
| 119 | Concrete Base for Controller Cabinet (680.5002) | EACH | 2 | $1,733.00 | $4,200.00 | $4,600.00 | $7,500.00 | $1,250.00 |
| 120 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 2 | $1,700.00 | $1,575.00 | $1,700.00 | $3,000.00 | $4,000.00 |
| 121 | (680.50500005) | 27 | $50.00 | $21.00 | $23.00 | $750.00 | $300.00 | |
| 122 | (680.510201) | EACH | 8 | $2,042.00 | $2,200.00 | $2,400.00 | $2,000.00 | $2,750.00 |
| 123 | (680.510301) | EACH | 10 | $2,050.00 | $2,500.00 | $2,800.00 | $2,500.00 | $3,500.00 |
| 124 | (680.520105) | LF | 124 | $22.00 | $52.50 | $57.00 | $25.00 | $22.00 |
| 125 | (680.520506) | LF | 178 | $10.00 | $10.50 | $12.00 | $15.00 | $34.00 |
| 126 | (680.520508) | LF | 2,836 | $5.25 | $14.70 | $16.00 | $22.00 | $50.00 |
| 127 | (680.622029) | EACH | 1 | $12,684 | $14,400 | $15,700 | $15,000 | $15,000 |
| 128 | (680.622054) | EACH | 1 | $24,516 | $24,300 | $26,400 | $30,000 | $25,000 |
| 129 | (680.622055) | EACH | 1 | $26,000 | $24,100 | $26,200 | $30,000 | $25,000 |
| 130 | (680.622059) | EACH | 2 | $28,000 | $24,600 | $26,500 | $30,000 | $25,000 |
| 131 | (680.622061) | EACH | 1 | $29,000 | $24,300 | $26,000 | $30,000 | $28,000 |
| 132 | (680.622062) | EACH | 3 | $30,000 | $24,700 | $27,000 | $30,000 | $28,000 |
| 133 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 4 | $1,800.00 | $1,050.00 | $1,100.00 | $1,500.00 | $1,500.00 |
| 134 | (680.730514) | LF | 5,105 | $1.88 | $5.00 | $5.50 | $5.00 | $3.75 |
| 135 | (680.730714) | LF | 2,095 | $3.70 | $5.25 | $5.75 | $6.00 | $4.50 |
| 136 | (680.77000305) | 1 | $1,459.00 | $2,625.00 | $2,800.00 | $3,000.00 | $5,000.00 | |
| 137 | (680.78010005) | 4 | $540.00 | $1,000.00 | $1,000.00 | $750.00 | $1,500.00 | |
| 138 | (680.79000105) | 1 | $6,539.00 | $6,825.00 | $7,400.00 | $8,000.00 | $5,000.00 | |
| 139 | (680.79000205) | 1 | $6,539.00 | $4,200.00 | $4,500.00 | $8,000.00 | $5,000.00 | |
| 140 | (680.79000305) | 1 | $2,463.00 | $1,680.00 | $1,900.00 | $5,000.00 | $5,000.00 | |
| 141 | (680.79000405) | 1 | $4,586.00 | $6,825.00 | $7,400.00 | $3,000.00 | $5,000.00 | |
| 142 | (680.79000505) | 1 | $4,586.00 | $6,825.00 | $7,400.00 | $5,000.00 | $5,000.00 | |
| 143 | (680.80150203) | 2 | $19,713 | $42,000 | $45,500 | $25,000 | $30,000 | |
| 144 | (680.80324515) | 4 | $1,089.00 | $4,200.00 | $4,600.00 | $3,500.00 | $1,000.00 | |
| 145 | (680.80324708) | 2 | $1,100.00 | $2,100.00 | $2,300.00 | $2,000.00 | $2,500.00 | |
| 146 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 13 | $42.00 | $150.00 | $160.00 | $125.00 | $175.00 |
| 147 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 7 | $45.00 | $150.00 | $160.00 | $150.00 | $185.00 |
| 148 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 13 | $42.00 | $158.00 | $170.00 | $150.00 | $185.00 |
| 149 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 17 | $45.00 | $158.00 | $170.00 | $150.00 | $195.00 |
| 150 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 13 | $42.00 | $170.00 | $180.00 | $150.00 | $195.00 |
| 151 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 13 | $45.00 | $170.00 | $180.00 | $175.00 | $195.00 |
| 152 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 76 | $263.00 | $180.00 | $200.00 | $225.00 | $175.00 |
| 153 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 20 | $242.00 | $735.00 | $800.00 | $500.00 | $750.00 |
| 154 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 6 | $137.00 | $290.00 | $310.00 | $300.00 | $325.00 |
| 155 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 12 | $153.00 | $290.00 | $310.00 | $300.00 | $325.00 |
| 156 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 6 | $1,960.00 | $395.00 | $425.00 | $450.00 | $600.00 |
| 157 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 6 | $137.00 | $300.00 | $320.00 | $300.00 | $500.00 |
| 158 | (680.8151) | EACH | 6 | $2,215.00 | $300.00 | $320.00 | $1,200.00 | $2,500.00 |
| 159 | (680.81990003) | 20 | $264.00 | $400.00 | $430.00 | $500.00 | $500.00 | |
| 160 | (680.8205) | EACH | 21 | $945.00 | $940.00 | $1,000.00 | $1,000.00 | $750.00 |
| 161 | (680.82250801) | 20 | $102.00 | $630.00 | $500.00 | $750.00 | $750.00 | |
| 162 | (680.82252310) | 8 | $100.00 | $2,000.00 | $15,700 | $15,000 | $10,000 | |
| 163 | (680.83010005) | 313 | $7.00 | $1.00 | $1.25 | $5.00 | $6.00 | |
| 164 | Meter Pan (680.9402) | EACH | 4 | $443.00 | $1,050.00 | $1,200.00 | $1,800.00 | $1,250.00 |
| 165 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 4 | $2,770.00 | $850.00 | $920.00 | $1,500.00 | $1,000.00 |
| 166 | (680.95010105) | 4 | $3,428.00 | $4,000.00 | $4,300.00 | $3,500.00 | $7,500.00 | |
| 167 | (680.950106) | LF | 2,739 | $3.88 | $4.00 | $4.25 | $5.00 | $2.50 |
| 168 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 169 | (683.08010105) | 2 | $67,694 | $115,000 | $112,000 | $82,500 | $77,500 | |
| 170 | (685.07200210) | 52 | $90.00 | $82.00 | $88.00 | $80.00 | $90.00 | |
| 171 | (685.07200310) | 37 | $249.00 | $240.00 | $260.00 | $235.00 | $350.00 | |
| 172 | (685.07200910) | 5 | $130.00 | $126.00 | $136.00 | $125.00 | $90.00 | |
| 173 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 11,868 | $0.70 | $0.70 | $0.72 | $0.75 | $0.85 |
| 174 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 11,601 | $0.70 | $0.70 | $0.72 | $0.75 | $0.85 |
| 175 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 5,478 | $4.10 | $3.95 | $4.25 | $4.00 | $3.25 |
| 176 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 6,491 | $4.10 | $3.95 | $4.25 | $4.00 | $3.25 |
| 177 | Field Change Payment (FCP) (697.03) | DOL | 178,300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 178 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 179 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 180 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 181 | Mobilization (699.040001) | LS | 1 | $147,000 | $155,973 | $160,000 | $169,150 | $173,418 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 22, 2025. Compiled by Mirage Metrics.