Union Concrete & Construction Corp: NYSDOT bid record

Union Concrete & Construction Corp submitted 39 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 04 JUN 2026, and was the low bidder on 26 of them (67%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
New York State DOT
Low bid volume
$326,849,920
Latest bid
04 JUN 2026
Data through
15 OCT 2026
39Bids
26Low bids
67Win rate, percent
+6.0%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
202211655%
202366100%
202455100%
202513646%
20264375%
Union Concrete & Construction Corp, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 05362364%
Region 0633100%
Union Concrete & Construction Corp, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL3737 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL3737 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL3737 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL3737 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL3636 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL2121 (100%)$1.00$1.00
Seed and Mulch – Temporary209.1003SY3318 (55%)$0.80$1.75
Asphalt Pavement Joint Adhesive418.7603LF3118 (58%)$0.25$1.00
Unclassified Excavation and Disposal203.02CY3215 (47%)$22.25$71.00
Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.020102TON2715 (56%)$210.00$307.93
Bedding Material, Type 1620.0801CY1815 (83%)$95.00$120.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT1515 (100%)$85.00$85.00
Union Concrete & Construction Corp, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Union Concrete & Construction Corp, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
04 JUN 2026D265766Region 05Pavement PM - Single Course Mill & Overlay- NY Rte 4171 of 3$4,689,455Low, 14% under the second
04 JUN 2026D265793Region 05Replacement of Overhead Sign & Ground Mounted Signs3 of 3$1,405,918+12%
12 MAR 2026D265690Region 05BRIDGE & CULVERT REPLACE; NY RT 5 & US RT 20, Twn of Evans1 of 4$23,840,973Low, 2.0% under the second
12 MAR 2026D265759Region 05NY-280; Highway Rehabilitation & Drainage Improvement1 of 4$8,611,489Low, 4.0% under the second
18 DEC 2025D265619Region 05BRIDGE WHERE & WHEN CONTRACT; SFY 25/26 & 26/271 of 2$534,611Low, 2.0% under the second
04 DEC 2025D265590Region 05STRUCTURE REPLACEMENT - NY Route 5 (S.H. 62-20)2 of 4$8,380,518+1.0%
23 OCT 2025D265526Region 06CULVERT REPLACEMENTS - Routes NY 19, NY 275 & NY 3051 of 3$10,932,372Low, 3.0% under the second
23 OCT 2025D265576Region 05Small Culvert Replacements -NY Route 950A2 of 6$1,558,342+33%
21 AUG 2025D265520Region 06Route 36 from Cass St. to Webbs Crossing Rd. - Phase 11 of 8$36,550,671Low, 4.0% under the second
10 JUL 2025D265505Region 05HIGHWAY RECONSTRUCTION - US 219 & Miller Rd Site Number: 01 Days Road User Cost Per Time Unit: $ 100001 of 5$5,116,456Low, 16% under the second
26 JUN 2025D265504Region 05INTERSECTION IMPROVEMENTS; NY 952J at Murphy Rd and Duerr Rd1 of 4$3,086,000Low, 21% under the second
22 MAY 2025D265494Region 05INTERSECTION IMPROVEMENT PROJECT; NY-1792 of 5$4,064,600+6.0%
08 MAY 2025D265483Region 05REPLACEMENT OF OVERHEAD SIGNS & GROUND MOUNTED SIGNS2 of 4$1,796,761+3.0%
27 MAR 2025D265452Region 05HIGHWAY/DRAINAGE SIGNAL & SAFETY IMPROVEMENTS - NY Rt 2402 of 5$5,295,625+4.0%
13 MAR 2025D265429Region 05BRIDGE REPLACEMENT - U.S. Route 219 over Great Valley Creek1 of 4$6,479,435Low, 4.0% under the second
13 MAR 2025D265434Region 05Highway Project; NY-242 & NY-353 in Little Valley4 of 5$5,998,650+9.0%
27 FEB 2025D265422Region 05Bridge Replacement - BIN 1001240 - NY-5 over Canadaway Creek2 of 3$3,737,997+11%
21 NOV 2024D265371Region 05CULVERT REPLACEMENT/PAVEMENT REHABILITATION, US RTE 2191 of 3$11,816,316Low, 7.0% under the second
29 AUG 2024D265294Region 05BRIDGE REPLACEMENTS & ELECTRIC SUBSTATION - NY Route 331 of 3$44,500,000Low, 3.0% under the second
08 AUG 2024D265288Region 05NY 240 (Orchard Park Rd) @ Fisher Rd. Intersection1 of 5$3,648,764Low, 37% under the second
06 JUN 2024D265252Region 05Replacement of Overhead and Ground Mounted Sign Structures1 of 2$859,996Low, 40% under the second
28 MAR 2024D265236Region 05RESURFACING NY 240; Boston-Colden Road to Ellicott Road1 of 3$10,622,223Low, 7.0% under the second
14 DEC 2023D265151Region 05Highway Improvements & Bridge Replacement - US Rte. 201 of 4$48,450,047Low, 2.0% under the second
14 DEC 2023D265170Region 05BRIDGE WHERE & WHEN CONTRACT SFY 23-24 & 24-251 of 4$982,933Low, 0.0% under the second
12 OCT 2023D265110Region 05NY Rte 280 - I86 to Quaker Lake - Highway Maintenance1 of 5$5,098,942Low, 5.0% under the second
Union Concrete & Construction Corp: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy