Union Concrete & Construction Corp: NYSDOT bid record
Union Concrete & Construction Corp submitted 39 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 04 JUN 2026, and was the low bidder on 26 of them (67%). When it was not low, its total sat a median +6.0% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $326,849,920
- Latest bid
- 04 JUN 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 11 | 6 | 55% |
| 2023 | 6 | 6 | 100% |
| 2024 | 5 | 5 | 100% |
| 2025 | 13 | 6 | 46% |
| 2026 | 4 | 3 | 75% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 05 | 36 | 23 | 64% |
| Region 06 | 3 | 3 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 37 | 37 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 37 | 37 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 37 | 37 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 37 | 37 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 36 | 36 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Seed and Mulch – Temporary | 209.1003 | SY | 33 | 18 (55%) | $0.80 | $1.75 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 31 | 18 (58%) | $0.25 | $1.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 32 | 15 (47%) | $22.25 | $71.00 |
| Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.020102 | TON | 27 | 15 (56%) | $210.00 | $307.93 |
| Bedding Material, Type 1 | 620.0801 | CY | 18 | 15 (83%) | $95.00 | $120.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 15 | 15 (100%) | $85.00 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Oakgrove Construction Inc | 21 | 7 of 21 |
| McLaughlin Construction Corp/DBA Edbauer Construction | 20 | 3 of 20 |
| Cold Spring Construction Company | 20 | 3 of 20 |
| Concrete Applied Technologies Corp/DBA:Catco | 19 | 1 of 19 |
| D&H Excavating Inc | 18 | 3 of 18 |
| The L C Whitford Co Inc | 6 | 0 of 6 |
| Lake Shore Paving Inc | 6 | 1 of 6 |
| Twin Tier Constructors Inc | 3 | 0 of 3 |
| Elderlee Inc | 3 | 1 of 3 |
| Hunting Valley Construction Inc | 3 | 0 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 JUN 2026 | D265766 | Region 05 | Pavement PM - Single Course Mill & Overlay- NY Rte 417 | 1 of 3 | $4,689,455 | Low, 14% under the second |
| 04 JUN 2026 | D265793 | Region 05 | Replacement of Overhead Sign & Ground Mounted Signs | 3 of 3 | $1,405,918 | +12% |
| 12 MAR 2026 | D265690 | Region 05 | BRIDGE & CULVERT REPLACE; NY RT 5 & US RT 20, Twn of Evans | 1 of 4 | $23,840,973 | Low, 2.0% under the second |
| 12 MAR 2026 | D265759 | Region 05 | NY-280; Highway Rehabilitation & Drainage Improvement | 1 of 4 | $8,611,489 | Low, 4.0% under the second |
| 18 DEC 2025 | D265619 | Region 05 | BRIDGE WHERE & WHEN CONTRACT; SFY 25/26 & 26/27 | 1 of 2 | $534,611 | Low, 2.0% under the second |
| 04 DEC 2025 | D265590 | Region 05 | STRUCTURE REPLACEMENT - NY Route 5 (S.H. 62-20) | 2 of 4 | $8,380,518 | +1.0% |
| 23 OCT 2025 | D265526 | Region 06 | CULVERT REPLACEMENTS - Routes NY 19, NY 275 & NY 305 | 1 of 3 | $10,932,372 | Low, 3.0% under the second |
| 23 OCT 2025 | D265576 | Region 05 | Small Culvert Replacements -NY Route 950A | 2 of 6 | $1,558,342 | +33% |
| 21 AUG 2025 | D265520 | Region 06 | Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1 | 1 of 8 | $36,550,671 | Low, 4.0% under the second |
| 10 JUL 2025 | D265505 | Region 05 | HIGHWAY RECONSTRUCTION - US 219 & Miller Rd Site Number: 01 Days Road User Cost Per Time Unit: $ 10000 | 1 of 5 | $5,116,456 | Low, 16% under the second |
| 26 JUN 2025 | D265504 | Region 05 | INTERSECTION IMPROVEMENTS; NY 952J at Murphy Rd and Duerr Rd | 1 of 4 | $3,086,000 | Low, 21% under the second |
| 22 MAY 2025 | D265494 | Region 05 | INTERSECTION IMPROVEMENT PROJECT; NY-179 | 2 of 5 | $4,064,600 | +6.0% |
| 08 MAY 2025 | D265483 | Region 05 | REPLACEMENT OF OVERHEAD SIGNS & GROUND MOUNTED SIGNS | 2 of 4 | $1,796,761 | +3.0% |
| 27 MAR 2025 | D265452 | Region 05 | HIGHWAY/DRAINAGE SIGNAL & SAFETY IMPROVEMENTS - NY Rt 240 | 2 of 5 | $5,295,625 | +4.0% |
| 13 MAR 2025 | D265429 | Region 05 | BRIDGE REPLACEMENT - U.S. Route 219 over Great Valley Creek | 1 of 4 | $6,479,435 | Low, 4.0% under the second |
| 13 MAR 2025 | D265434 | Region 05 | Highway Project; NY-242 & NY-353 in Little Valley | 4 of 5 | $5,998,650 | +9.0% |
| 27 FEB 2025 | D265422 | Region 05 | Bridge Replacement - BIN 1001240 - NY-5 over Canadaway Creek | 2 of 3 | $3,737,997 | +11% |
| 21 NOV 2024 | D265371 | Region 05 | CULVERT REPLACEMENT/PAVEMENT REHABILITATION, US RTE 219 | 1 of 3 | $11,816,316 | Low, 7.0% under the second |
| 29 AUG 2024 | D265294 | Region 05 | BRIDGE REPLACEMENTS & ELECTRIC SUBSTATION - NY Route 33 | 1 of 3 | $44,500,000 | Low, 3.0% under the second |
| 08 AUG 2024 | D265288 | Region 05 | NY 240 (Orchard Park Rd) @ Fisher Rd. Intersection | 1 of 5 | $3,648,764 | Low, 37% under the second |
| 06 JUN 2024 | D265252 | Region 05 | Replacement of Overhead and Ground Mounted Sign Structures | 1 of 2 | $859,996 | Low, 40% under the second |
| 28 MAR 2024 | D265236 | Region 05 | RESURFACING NY 240; Boston-Colden Road to Ellicott Road | 1 of 3 | $10,622,223 | Low, 7.0% under the second |
| 14 DEC 2023 | D265151 | Region 05 | Highway Improvements & Bridge Replacement - US Rte. 20 | 1 of 4 | $48,450,047 | Low, 2.0% under the second |
| 14 DEC 2023 | D265170 | Region 05 | BRIDGE WHERE & WHEN CONTRACT SFY 23-24 & 24-25 | 1 of 4 | $982,933 | Low, 0.0% under the second |
| 12 OCT 2023 | D265110 | Region 05 | NY Rte 280 - I86 to Quaker Lake - Highway Maintenance | 1 of 5 | $5,098,942 | Low, 5.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.