NYSDOT contract D265759 bid tabulation
NY-280; Highway Rehabilitation & Drainage Improvement. Let by New York State DOT on March 12, 2026, Cattaraugus, Region 05. 4 bids received; low bid $8,611,489 by Union Concrete & Construction Corp.
- Owner
- New York State DOT
- Letting
- 12 MAR 2026
- Pay items
- 98
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Union Concrete & Construction Corp | $8,611,489 | Low |
| 2 | Lake Shore Paving Inc | $8,981,482 | +4.0% |
| 3 | McLaughlin Construction Corp/DBA Edbauer Construction | $9,426,733 | +9.0% |
| 4 | D&H Excavating Inc | $9,710,694 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Union Concrete & Construction Corp | 2. Lake Shore Paving Inc | 3. McLaughlin Construction Corp/DBA Edbauer Construction | 4. D&H Excavating Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $100,000 | $124,300 | $350,000 | $75,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 2,705 | $40.00 | $27.60 | $45.00 | $80.00 |
| 3 | Embankment In Place (203.03) | CY | 25 | $40.00 | $32.40 | $75.00 | $105.00 |
| 4 | Select Granular Fill (203.07) | CY | 156 | $95.00 | $98.25 | $95.00 | $250.00 |
| 5 | (203.24010017) | 1,366 | $45.00 | $62.82 | $35.00 | $67.00 | |
| 6 | Trench and Culvert Excavation (206.0201) | CY | 355 | $35.00 | $56.53 | $45.00 | $105.00 |
| 7 | Seed and Mulch – Temporary (209.1003) | SY | 1,683 | $1.00 | $5.00 | $0.25 | $3.00 |
| 8 | Stabilized Construction Access (209.22) | SY | 4,364 | $0.01 | $18.84 | $15.00 | $1.00 |
| 9 | Sediment Filter Log, 12″ (209.2301) | LF | 4,500 | $0.01 | $7.00 | $0.50 | $15.00 |
| 10 | (304.15200005) | 1,543 | $120.00 | $96.76 | $110.00 | $185.00 | |
| 11 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $105.00 | $105.00 | $105.00 | $105.00 |
| 12 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 313 | $105.00 | $105.00 | $105.00 | $105.00 |
| 13 | (404.0962) | TON | 8,951 | $130.00 | $119.15 | $125.00 | $111.00 |
| 14 | (404.1989) | TON | 702 | $185.00 | $132.20 | $220.00 | $210.00 |
| 15 | Diluted Tack Coat (407.0102) | GAL | 11,315 | $7.00 | $5.38 | $5.00 | $5.50 |
| 16 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 41,659 | $0.17 | $0.40 | $0.10 | $0.40 |
| 17 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,272 | $12.00 | $7.40 | $15.00 | $30.00 |
| 18 | Shields and Shoring (552.17) | SF | 376 | $0.60 | $12.89 | $3.00 | $5.00 |
| 19 | Concrete for Structures, Performance (555.0021) | CY | 2 | $7,000.00 | $7,177.63 | $9,800.00 | $6,500.00 |
| 20 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $15.62 | $15.62 | $15.62 | $15.62 |
| 21 | Uncoated Steel Fabric Reinforcement for Structures (556.0101) | SY | 5 | $22.00 | $103.54 | $28.00 | $140.00 |
| 22 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 337 | $4.00 | $5.23 | $9.00 | $7.25 |
| 23 | Removal of Structural Concrete (580.01) | CY | 2 | $1,250.00 | $2,100.00 | $1,434.00 | $2,500.00 |
| 24 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 46 | $25.00 | $22.14 | $50.00 | $45.00 |
| 25 | (602.3624) | LF | 2,488 | $225.00 | $177.75 | $186.00 | $205.00 |
| 26 | (602.3630) | LF | 743 | $275.00 | $248.00 | $254.00 | $335.00 |
| 27 | (602.3636) | LF | 746 | $340.00 | $356.25 | $358.00 | $465.00 |
| 28 | (602.3672) | LF | 450 | $1,400.00 | $1,040.00 | $1,100.00 | $1,350.00 |
| 29 | (603.112316) | LF | 10 | $240.00 | $367.55 | $614.00 | $850.00 |
| 30 | (603.171614) | EACH | 49 | $608.00 | $1,327.00 | $1,309.00 | $700.00 |
| 31 | (603.171814) | EACH | 16 | $995.00 | $1,510.00 | $1,705.00 | $900.00 |
| 32 | (603.171912) | EACH | 18 | $2,400.00 | $3,212.00 | $3,512.00 | $2,000.00 |
| 33 | Concrete Collars (603.77) | EACH | 1 | $20,000 | $6,860.00 | $20,421 | $25,000 |
| 34 | (603.9824) | LF | 115 | $50.00 | $37.12 | $164.00 | $440.00 |
| 35 | (603.9830) | LF | 70 | $75.00 | $73.40 | $229.00 | $525.00 |
| 36 | (603.9836) | LF | 5 | $265.00 | $297.50 | $614.00 | $1,500.00 |
| 37 | (604.070502) | EACH | 3 | $500.00 | $1,362.00 | $3,828.00 | $8,750.00 |
| 38 | (604.070504) | EACH | 1 | $3,250.00 | $1,553.00 | $3,828.00 | $15,500 |
| 39 | Box Beam Guide Railing (606.10) | LF | 34,604 | $50.00 | $51.77 | $50.00 | $49.00 |
| 40 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 3,294 | $55.00 | $57.29 | $56.00 | $55.00 |
| 41 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 162 | $55.00 | $56.39 | $55.00 | $56.00 |
| 42 | Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102) | LF | 150 | $60.00 | $61.86 | $60.00 | $62.00 |
| 43 | Box Beam End Piece (606.120101) | EACH | 41 | $650.00 | $664.74 | $643.00 | $670.00 |
| 44 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 6 | $4,500.00 | $4,456.00 | $4,300.00 | $4,500.00 |
| 45 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 7 | $2,200.00 | $2,135.00 | $2,060.00 | $2,200.00 |
| 46 | Box Beam End Assembly Type III (606.1203) | EACH | 3 | $7,000.00 | $7,081.00 | $6,834.00 | $7,100.00 |
| 47 | Removing and Storing Cable Guide Railing (606.60) | LF | 38,946 | $2.55 | $3.45 | $3.50 | $6.00 |
| 48 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 8 | $75.00 | $181.43 | $52.00 | $80.00 |
| 49 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 66 | $165.00 | $303.83 | $110.00 | $650.00 |
| 50 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 1,498 | $200.00 | $145.18 | $223.00 | $285.00 |
| 51 | Topsoil - Roadside (610.1402) | CY | 374 | $1.00 | $142.30 | $25.00 | $280.00 |
| 52 | Turf Establishment - Roadside (610.1601) | SY | 3,365 | $3.70 | $4.56 | $1.00 | $3.00 |
| 53 | Watering Vegetation (610.19) | 1,000 GALLONS | 146 | $0.01 | $39.44 | $10.00 | $1.00 |
| 54 | (611.0131) | EACH | 175 | $940.00 | $929.50 | $690.00 | $950.00 |
| 55 | (611.0262) | EACH | 80 | $565.00 | $900.00 | $725.00 | $550.00 |
| 56 | (611.0361) | EACH | 20 | $950.00 | $873.00 | $825.00 | $950.00 |
| 57 | (611.19010024) | 175 | $53.00 | $129.50 | $100.00 | $55.00 | |
| 58 | (611.19020024) | 20 | $53.00 | $107.00 | $110.00 | $55.00 | |
| 59 | (611.19030024) | 80 | $53.00 | $129.50 | $120.00 | $55.00 | |
| 60 | Rodent Guard (611.21) | EACH | 255 | $32.00 | $20.25 | $10.00 | $20.00 |
| 61 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $156,500 | $253,467 | $643,803 | $216,000 |
| 62 | (619.110513) | EACH | 4 | $6,500.00 | $16,805 | $10,000 | $10,000 |
| 63 | Stone Filling (Medium) (620.04) | CY | 851 | $250.00 | $444.90 | $173.00 | $400.00 |
| 64 | (621.51000015) | 5,738 | $5.00 | $10.50 | $8.00 | $7.50 | |
| 65 | Survey Operations (625.01) | LS | 1 | $8,000.00 | $214,718 | $98,000 | $60,000 |
| 66 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 104,372 | $0.06 | $0.02 | $0.15 | $0.10 |
| 67 | Cleaning, Sealing and/or Filling Joints (633.13) | LF | 4,436 | $1.25 | $1.18 | $10.00 | $5.00 |
| 68 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 1,744 | $80.00 | $79.64 | $50.00 | $60.00 |
| 69 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 1,744 | $69.00 | $58.23 | $70.00 | $55.00 |
| 70 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 1,744 | $55.00 | $42.58 | $80.00 | $50.00 |
| 71 | (636.01000005) | 72,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 72 | (636.99990215) | LS | 1 | $410,071 | $427,690 | $448,892 | $462,414 |
| 73 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $100.00 | $500.00 | $100.00 | $550.00 |
| 74 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 22 | $2,250.00 | $2,450.00 | $1,100.00 | $2,200.00 |
| 75 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 76 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 114,751 | $0.20 | $0.20 | $0.20 | $0.21 |
| 77 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 73,225 | $0.20 | $0.20 | $0.20 | $0.21 |
| 78 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 675 | $46.00 | $39.44 | $50.00 | $40.00 |
| 79 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 203 | $52.00 | $37.18 | $53.00 | $38.00 |
| 80 | Type A Sign Posts (645.81) | EACH | 132 | $210.00 | $197.00 | $214.00 | $200.00 |
| 81 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 2 | $1,450.00 | $1,237.00 | $1,471.00 | $1,250.00 |
| 82 | (645.81090003) | 12 | $80.00 | $67.60 | $80.00 | $70.00 | |
| 83 | (645.830202) | EACH | 2 | $3,000.00 | $3,202.00 | $307.00 | $3,300.00 |
| 84 | (645.830302) | EACH | 4 | $4,300.00 | $3,912.00 | $4,306.00 | $4,000.00 |
| 85 | Reference Marker Panel (646.21) | EACH | 73 | $39.00 | $50.56 | $40.00 | $41.00 |
| 86 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 88 | $13.00 | $10.14 | $13.00 | $11.00 |
| 87 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 154 | $18.00 | $24.80 | $18.00 | $25.00 |
| 88 | Steel Post, 2.0 lb/ft (646.32) | EACH | 282 | $80.00 | $102.50 | $82.00 | $103.00 |
| 89 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 41 | $100.00 | $33.80 | $8.00 | $35.00 |
| 90 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 3 | $400.00 | $39.44 | $14.00 | $40.00 |
| 91 | (647.83001002) | 139 | $25.00 | $11.25 | $7.00 | $12.00 | |
| 92 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 1 | $1,000.00 | $1,294.83 | $688.00 | $3,854.87 |
| 93 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 135 | $33.00 | $33.80 | $33.00 | $35.00 |
| 94 | Field Change Payment (FCP) (697.03) | DOL | 330,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 95 | Asphalt Price Adjustment (698.04) | DOL | 15,900 | $1.00 | $1.00 | $1.00 | $1.00 |
| 96 | Fuel Price Adjustment (698.05) | DOL | 2,498 | $1.00 | $1.00 | $1.00 | $1.00 |
| 97 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 98 | Mobilization (699.040001) | LS | 1 | $315,400 | $328,992 | $343,000 | $330,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 12, 2026. Compiled by Mirage Metrics.