Lake Shore Paving Inc: NYSDOT bid record

Lake Shore Paving Inc submitted 21 bids on New York State DOT contracts in the data, from 19 MAY 2022 to 15 OCT 2026, and was the low bidder on 6 of them (29%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
New York State DOT
Low bid volume
$15,367,087
Latest bid
15 OCT 2026
Data through
15 OCT 2026
21Bids
6Low bids
29Win rate, percent
+6.0%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
20223133%
20232150%
20246233%
20256117%
20264125%
Lake Shore Paving Inc, NYSDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL2121 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL2121 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL2121 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL2121 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL2020 (100%)$1.00$1.00
Unclassified Excavation and Disposal203.02CY1811 (61%)$34.67$71.00
404.0001TON99 (100%)$100.00$95.00
Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.020102TON188 (44%)$265.78$307.93
Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.000013QUALITY UNIT88 (100%)$90.00$90.00
Pavement Density Quality Adjustment to Asphalt Items404.0002QUALITY UNIT88 (100%)$100.00$110.00
404.3789TON107 (70%)$187.90$175.00
Permanent Survey Markers625.06EACH97 (78%)$442.86$1,500.00
Lake Shore Paving Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Lake Shore Paving Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
15 OCT 2026D265838Region 05Guiderail Replacement Project; US-622 of 3$1,385,382+4.0%
01 OCT 2026D265850Region 05NY Route 474 ADA & Pedestrian Improvements; Town of Clymer1 of 3$2,245,147Low, 3.0% under the second
21 MAY 2026D265798Region 05Highway Rehabilitation - NY 3942 of 2$3,945,030+6.0%
12 MAR 2026D265759Region 05NY-280; Highway Rehabilitation & Drainage Improvement2 of 4$8,981,482+4.0%
20 NOV 2025D265603Region 05HIGHWAY RESURFACING; I-86, Southern Tier Expressway; SNI3 of 6$5,915,817+6.0%
23 OCT 2025D265576Region 05Small Culvert Replacements -NY Route 950A3 of 6$1,696,232+45%
25 SEP 2025D265566Region 05ADA Compliance and Pedestrian Signal Upgrades4 of 4$1,959,199+28%
21 AUG 2025D265547Region 05SAFETY IMPROVEMENTS - US Route 20, NY Routes 5 & 952H2 of 5$5,747,286+2.0%
24 JUL 2025D265506Region 05NY394-Mill & Resurfacing ADA Signal & Drainage Improvements2 of 3$7,135,7680.0%
09 JAN 2025D265408Region 05Pavement Resurfacing with Safety and Improvements1 of 6$3,957,619Low, 6.0% under the second
24 OCT 2024D265345Region 05HIGHWAY - ADA COMPLIANCE & SIGNAL UPGRADES3 of 3$622,551+45%
25 JUL 2024D265293Region 05NY 280 (BRIDGE & LARGE CULVERTS) - SNI; CATT CO1 of 6$3,800,520Low, 36% under the second
20 JUN 2024D265259Region 05SAFETY IMPROVEMENT ON US ROUTE 20 AND NY ROUTE 51 of 4$4,281,582Low, 8.0% under the second
23 MAY 2024D265249Region 05Large Culvert Replacements and Rehabilitations2 of 2$5,369,500+3.0%
14 MAR 2024D265223Region 05Small Culvert Rehabilitations and Replacements2 of 5$4,397,758+5.0%
14 MAR 2024D265224Region 05NY 438 PMI; SNI5 of 7$4,706,048+7.0%
12 OCT 2023D265110Region 05NY Rte 280 - I86 to Quaker Lake - Highway Maintenance5 of 5$5,559,701+9.0%
14 SEP 2023D265085Region 05HIGHWAY - REHAB/IMPROVEMENT - ADA Various Locations1 of 3$399,453Low, 25% under the second
17 NOV 2022D264917Region 05NY Route 5, Barcelona Retaining Wall1 of 5$682,765Low, 0.0% under the second
07 JUL 2022D264815Region 05LARGE CULVERT REPLACEMENT AND REHABILITATIONS NYSDOT R-55 of 5$3,604,811+28%
19 MAY 2022D264800Region 05Retention Pond Maintenance in the Town of Salamanca.3 of 5$396,424+28%
Lake Shore Paving Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy