NYSDOT contract D265547 bid tabulation

SAFETY IMPROVEMENTS - US Route 20, NY Routes 5 & 952H. Let by New York State DOT on August 21, 2025, Chautauqua, Region 05. 5 bids received; low bid $5,649,777 by D&H Excavating Inc.

Owner
New York State DOT
Letting
21 AUG 2025
Pay items
190
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D&H Excavating Inc$5,649,777Low
2Lake Shore Paving Inc$5,747,286+2.0%
3Cold Spring Construction Company$5,795,000+3.0%
4Concrete Applied Technologies Corp/DBA:Catco$5,951,484+5.0%
5McLaughlin Construction Corp/DBA Edbauer Construction$6,055,990+7.0%
NYSDOT contract D265547: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D&H Excavating Inc2. Lake Shore Paving Inc3. Cold Spring Construction Company4. Concrete Applied Technologies Corp/DBA:Catco5. McLaughlin Construction Corp/DBA Edbauer Construction
1Clearing and Grubbing (201.06)LS1$26,000$11,999$35,000$20,000$40,000
2Unclassified Excavation and Disposal (203.02)CY630$60.00$40.30$75.00$60.00$140.00
3Embankment In Place (203.03)CY1,500$24.00$43.40$30.00$50.00$40.00
4Select Granular Fill (203.07)CY320$64.00$98.76$90.00$90.00$90.00
5 (203.24010017)8$150.00$208.85$250.00$200.00$75.00
6Structure Excavation (206.01)CY2,200$25.00$35.65$35.00$35.00$40.00
7Trench and Culvert Excavation (206.0201)CY327$125.00$30.25$65.00$90.00$45.00
8 (206.03050005)46$125.00$121.80$50.00$150.00$147.00
9 (206.03060005)147$80.00$77.50$50.00$80.00$50.00
10Test Pit Excavation (206.05)EACH14$750.00$1,064.45$1,500.00$2,000.00$2,000.00
11Geotextile Bedding (207.20)SY310$8.00$3.10$5.00$8.50$5.00
12Prefabricated Composite Structural Drain (207.26)SY48$42.00$46.91$20.00$40.00$20.00
13Seed and Mulch – Temporary (209.1003)SY963$2.75$4.54$1.00$2.00$0.01
14 (209.23010009)795$9.50$11.60$4.00$11.50$2.00
15 (304.15200005)447$102.00$119.28$75.00$135.00$95.00
16 (404.0001)TON333$100.00$100.00$100.00$100.00$100.00
17Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1$100.00$100.00$100.00$100.00$100.00
18Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT132$100.00$100.00$100.00$100.00$100.00
19 (404.0962)TON5,592$112.00$116.15$125.00$116.00$123.00
20 (404.0982)TON482$260.00$193.28$200.00$275.00$419.00
21 (404.1989)TON99$320.00$255.34$190.00$250.00$388.00
22 (404.3789)TON221$235.00$174.96$180.00$250.00$300.00
23 (404.4389)TON110$215.00$180.06$190.00$250.00$240.00
24 (404.4589)TON140$200.00$159.61$180.00$230.00$212.00
25Diluted Tack Coat (407.0102)GAL7,971$5.75$6.29$9.00$4.50$8.00
26Asphalt Pavement Joint Adhesive (418.7603)LF52,520$0.50$0.46$0.65$0.60$0.10
27Production Cold Milling of Bituminous Concrete (490.10)SY69,079$1.85$2.67$1.25$2.75$3.30
28Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY5,200$12.00$14.12$8.00$13.00$18.00
29 (520.09000010)161$30.00$5.85$8.00$8.00$20.00
30 (520.50000004)40$120.00$15.49$20.00$10.00$50.00
31 (552.2001)LF300$1.00$69.34$160.00$1.00$2.00
32 (552.2101)LF60$1.00$900.26$825.00$1.00$2.00
33 (552.2201)LF300$1.00$152.38$250.00$580.00$340.00
34 (552.230201)SF970$1.00$41.97$30.00$1.00$2.00
35 (553.030001)EACH1$14,000$13,085$40,000$150.00$10.00
36 (553.030002)EACH1$14,000$13,085$40,000$150.00$10.00
37 (554.3001)SF200$69.00$110.26$85.00$91.00$85.00
38 (595.50000018)3,660$5.75$2.92$6.00$6.00$8.00
39 (603.171316)EACH7$585.00$939.11$1,000.00$400.00$525.00
40 (603.171614)EACH2$1,800.00$1,284.84$1,000.00$1,200.00$890.00
41 (603.63070415)117$1,860.00$1,865.44$1,750.00$1,460.00$2,150.00
42 (603.64050515)84$1,950.00$1,799.28$1,500.00$1,260.00$2,230.00
43 (603.67000001)60$3,600.00$2,036.34$2,500.00$2,700.00$1,850.00
44Concrete Collars (603.77)EACH1$1.00$1,656.30$2,000.00$1,500.00$950.00
45 (603.9818)LF80$70.00$23.47$60.00$85.00$55.00
46 (604.070501)EACH49$2,075.00$2,774.14$4,000.00$2,600.00$3,053.00
47 (604.070502)EACH20$2,600.00$3,540.68$4,500.00$3,500.00$3,812.00
48 (604.070503)EACH7$4,800.00$6,707.22$5,750.00$4,500.00$4,307.00
49Prefabricated Adjustment Rings for Manholes (604.10)EACH40$800.00$617.39$1,000.00$500.00$250.00
50Underdrain Filter, Type II (605.1001)CY10$220.00$151.44$150.00$100.00$75.00
51 (605.1702)LF50$3.00$8.25$8.00$25.00$32.00
52Box Beam Guide Railing (606.10)LF1,625$54.00$52.04$50.00$52.00$54.00
53Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF198$69.00$66.98$65.00$67.00$70.00
54Box Beam End Piece (606.120101)EACH1$685.00$664.29$1,000.00$670.00$653.00
55Box Beam Guide Railing End Assembly Type I (606.120102)EACH3$5,000.00$4,799.44$5,000.00$4,800.00$4,725.00
56Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH6$2,600.00$2,518.74$3,000.00$2,500.00$2,475.00
57Box Beam End Assembly Type III (606.1203)EACH1$8,100.00$7,871.75$7,500.00$8,000.00$7,732.00
58HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27)EACH1$4,800.00$4,666.59$4,500.00$4,700.00$4,584.00
59HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF368$38.00$36.26$35.00$36.60$36.00
60Single-Slope Concrete Half Section Barrier (Optional) (606.3061)LF40$290.00$94.10$150.00$260.00$210.00
61I-Beam Posts for Existing Box Beam Guide Railing (606.4809)EACH48$140.00$132.86$125.00$134.00$130.00
62Resetting Box Beam Guide Railing (New Posts) (606.5348)LF259$36.00$34.60$35.00$35.00$40.00
63Removing and Storing Box Beam Guide Railing (606.63)LF312$7.00$15.45$10.00$12.00$5.00
64Removing and Storing Box Beam Guide Railing End Assembly (606.6920)EACH8$525.00$751.20$1,500.00$730.00$364.00
65Removing and Disposing Corrugated Beam Guide Railing (606.71)LF480$5.00$12.54$10.00$9.25$3.00
66Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH6$650.00$1,465.25$1,500.00$732.00$100.00
67Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Single Slope Concrete Half Section Barrier (606.8903)EACH1$5,100.00$4,865.88$11,000$17,000$13,354
68Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT6$100.00$100.00$100.00$100.00$100.00
69Concrete Sidewalks and Driveways (608.0101)CY7$1,450.00$1,155.25$2,000.00$1,700.00$1,540.00
70 (608.01060415)3,754$35.00$36.63$42.00$30.00$38.00
71 (608.01060615)277$60.00$54.50$65.00$40.00$44.00
72 (608.01070415)11,519$55.00$38.86$42.00$45.00$46.00
73 (608.01070615)371$70.00$47.71$65.00$60.00$50.00
74Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON189$300.00$309.94$225.00$225.00$234.00
75 (608.10080008)846$45.00$13.57$55.00$40.00$10.00
76 (608.21000003)18$670.00$496.74$400.00$600.00$636.00
77 (609.0401)LF209$148.00$124.29$120.00$140.00$120.00
78 (609.0407)LF123$146.00$142.05$120.00$140.00$124.00
79 (609.10010109)981$156.00$191.87$120.00$135.00$154.00
80 (609.15000008)12$220.00$206.50$80.00$100.00$95.00
81 (609.15100002)40$30.00$63.05$30.00$45.00$22.00
82Compost (610.10)CY17$165.00$219.21$200.00$220.00$60.00
83Topsoil - Roadside (610.1402)CY222$85.00$160.54$150.00$145.00$75.00
84Turf Establishment -Lawns (610.1602)SY1,963$4.50$4.54$4.25$4.50$0.01
85Watering Vegetation (610.19)1,000 GALLONS32$1.00$135.07$125.00$100.00$10.00
86 (611.0151)EACH18$1,300.00$1,478.03$1,400.00$1,500.00$1,150.00
87 (611.0291)EACH12$1,300.00$1,367.31$1,300.00$1,400.00$1,100.00
88 (611.0351)EACH3$750.00$1,135.92$1,050.00$1,150.00$765.00
89Portable Drip Irrigation System (611.17)EACH33$82.00$79.71$75.00$80.00$110.00
90 (611.19010024)18$60.00$354.28$325.00$357.00$100.00
91 (611.19020024)12$60.00$321.07$300.00$323.00$100.00
92 (611.19030024)3$60.00$243.57$225.00$245.00$100.00
93 (613.04000001)47$340.00$132.03$50.00$125.00$74.00
94 (614.060102)EACH12$425.00$553.57$500.00$600.00$435.00
95 (614.060104)EACH6$475.00$553.57$650.00$800.00$488.00
96 (614.060202)EACH7$700.00$1,107.14$750.00$1,200.00$650.00
97 (614.060204)EACH4$750.00$1,107.14$1,000.00$1,200.00$702.00
98 (614.060302)EACH10$750.00$1,328.57$1,200.00$1,700.00$760.00
99 (614.060402)EACH2$800.00$1,771.42$1,600.00$2,200.00$812.00
100 (614.060602)EACH4$2,200.00$2,767.84$3,750.00$2,400.00$2,170.00
101 (614.060704)EACH1$3,200.00$4,428.55$6,000.00$4,500.00$3,258.00
102 (617.10000024)25$80.00$47.03$25.00$115.00$25.00
103 (617.11000024)LS1$600.00$308.41$250.00$2,500.00$100.00
104Basic Work Zone Traffic Control (619.01)LS1$92,000$221,998$110,000$310,000$400,539
105Type III Construction Barricades (619.04)EACH9$75.00$365.98$125.00$250.00$200.00
106Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF2,240$9.00$5.54$4.25$8.75$1.00
107 (619.0901)LF41,650$0.35$0.32$0.30$0.33$0.32
108 (619.0903)LF6,270$9.00$5.54$4.25$0.01$1.00
109 (619.111113)EACH6$9,500.00$10,629$8,000.00$10,000$10,000
110 (619.130101)EACH1$26,000$54,250$65,000$50,000$70,000
111 (619.130102)EACH1$31,000$45,393$65,000$40,000$70,000
112Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH12$175.00$166.07$250.00$400.00$50.00
113Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF1,700$50.00$58.71$35.00$40.00$22.00
114Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH1$9,000.00$15,785$5,000.00$10,500$7,500.00
115Pavement Patching (Tonnage) (619.2602)TON22$1,250.00$357.23$450.00$1,500.00$250.00
116Stone Filling (Medium) (620.04)CY110$185.00$288.28$230.00$240.00$110.00
117Bedding Material, Type 1 (620.0801)CY51$170.00$293.74$150.00$100.00$110.00
118Cleaning Culverts with Span of 50 in. or Less (621.01)LF91$40.00$21.05$35.00$33.50$32.00
119Cleaning Closed Drainage Systems (621.03)LF14,720$2.00$3.54$4.00$4.00$4.00
120Cleaning Drainage Structures (621.04)EACH98$150.00$354.88$200.00$200.00$270.00
121 (621.51000015)690$12.00$10.00$8.00$15.00$12.00
122Crushed Gravel (In-Place Measure) (623.11)CY102$135.00$217.28$125.00$140.00$110.00
123Survey Operations (625.01)LS1$100,065$89,580$35,000$65,000$75,000
124Concrete Right of Way Markers Type L (Low) (625.04)EACH12$1,150.00$553.57$500.00$600.00$1,100.00
125Steel Pin and Cap Right of Way Markers (625.05)EACH31$275.00$221.43$175.00$400.00$240.00
126Permanent Survey Markers (625.06)EACH14$1,150.00$442.86$600.00$2,000.00$1,500.00
127 (627.50140008)1,941$7.50$0.25$6.00$7.00$5.00
128Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401)SY363$90.00$123.83$100.00$90.00$1.00
129Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402)SY182$82.00$98.73$85.00$70.00$1.00
130Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403)SY182$75.00$97.54$65.00$50.00$1.00
131Concrete Cylinder Curing Equipment (637.04)EACH1$1,250.00$3,021.68$1,000.00$3,500.00$250.00
132Engineer’s Field Office – Type 2 (637.12)MONTH19$2,100.00$3,829.07$2,500.00$2,500.00$2,100.00
133Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00$1.00$1.00
134White Paint Reflectorized Pavement Stripes – 15 mils (640.10)LF33,440$0.34$0.31$0.30$0.31$0.32
135Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11)LF34,310$0.34$0.31$0.30$0.31$0.32
136 (640.12020004)220$3.00$2.77$2.75$2.75$3.00
137White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF35,536$0.35$0.32$0.30$0.32$0.32
138Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF35,560$0.35$0.32$0.30$0.32$0.32
139Ground-Mounted Sign Panels without Z-bars (645.5101)SF285$40.00$38.75$32.00$39.00$33.00
140Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF2,011$50.00$48.72$34.00$49.00$34.00
141Type A Sign Posts (645.81)EACH478$200.00$188.22$175.00$190.00$179.00
142High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH12$1,150.00$1,124.85$1,050.00$1,135.00$1,065.00
143 (645.81090003)102$81.00$78.60$80.00$80.00$82.00
144Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH10$200.00$188.22$160.00$152.00$163.00
145Reference Marker Panel (646.21)EACH35$38.00$36.54$27.00$37.00$27.00
146Steel Post, 2.0 lb/ft (646.32)EACH35$105.00$99.64$100.00$100.50$103.00
147Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH285$42.00$40.97$50.00$41.00$44.00
148Remove and Store Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.42)EACH4$62.00$59.79$70.00$62.00$70.00
149 (647.83001002)35$13.00$12.18$30.00$12.50$27.00
150Centerline Audible Roadway Delineators (CARDs) (649.11)LF4,111$1.40$1.33$1.50$1.20$1.35
151 (662.60000108)2,500$1.00$1.00$1.00$1.00$1.00
152Adjust Existing Valve Box Elevation (663.33)EACH36$380.00$192.03$400.00$300.00$520.00
153 (680.05010007)1$25,000$24,025$20,000$25,000$23,100
154 (680.05020007)1$5,000.00$4,871.41$3,500.00$5,000.00$4,000.00
155 (680.11131014)8$7,200.00$7,982.48$20,000$6,800.00$4,265.00
156Pole Excavation and Concrete Foundation (680.5001)CY10$0.01$0.01$0.01$3,600.00$0.01
157Concrete Base for Controller Cabinet (680.5002)EACH1$6,700.00$6,532.12$3,500.00$4,000.00$4,382.00
158 (680.50500005)2$575.00$553.57$400.00$1,000.00$100.00
159 (680.510201)EACH2$2,100.00$1,992.85$2,500.00$2,400.00$2,450.00
160 (680.510301)EACH4$2,500.00$2,380.34$3,500.00$2,600.00$2,720.00
161 (680.520105)LF28$25.00$24.36$20.00$50.00$34.00
162 (680.520506)LF92$17.00$16.61$25.00$30.00$14.00
163 (680.520508)LF153$24.00$23.25$15.00$21.00$13.00
164Single Span Wire Assembly (680.7001)EACH1$3,000.00$2,878.56$3,500.00$3,750.00$3,720.00
165Riser Assembly, 1-inch Diameter (680.700603)EACH1$1,600.00$1,550.00$1,000.00$1,100.00$1,740.00
166 (680.730514)LF1,691$5.75$5.54$10.00$5.10$2.58
167 (680.77000105)1$5,000.00$5,424.98$3,500.00$2,000.00$2,400.00
168 (680.79000105)1$5,500.00$5,867.74$6,500.00$3,500.00$2,820.00
169 (680.80324515)1$3,250.00$3,432.13$1,500.00$4,000.00$1,997.00
170 (680.80324708)1$2,000.00$1,992.85$1,500.00$1,500.00$1,304.00
171Traffic Signal Module - 12-inch, Red Ball, LED (680.810101)EACH8$140.00$132.86$200.00$170.00$79.00
172Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103)EACH8$145.00$138.39$200.00$170.00$79.00
173Traffic Signal Module - 12-inch, Green Ball, LED (680.810105)EACH8$150.00$143.93$200.00$170.00$79.00
174Traffic Signal Section - Aluminum Type I, 12-inch (680.810107)EACH24$240.00$232.50$200.00$210.00$113.00
175Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH8$520.00$509.28$600.00$390.00$139.00
176Traffic Signal Disconnect Hanger (680.8120)EACH8$510.00$498.21$750.00$600.00$1,232.00
177 (680.82250801)4$510.00$498.21$500.00$750.00$899.00
178 (680.83010005)134$4.50$4.43$4.00$10.00$10.00
179Meter Pan (680.9402)EACH1$2,000.00$1,937.49$1,000.00$1,100.00$1,034.00
180Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH1$1,550.00$1,494.63$1,000.00$650.00$1,034.00
181 (680.950106)LF112$4.50$4.43$12.50$8.00$8.00
182Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$10.00$10.00$10.00$10.00$10.00
183White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF7,370$4.25$4.15$4.00$4.15$4.10
184White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH17$340.00$326.60$325.00$330.00$320.00
185 (688.02010006)1,700$2.50$14.55$0.50$3.00$2.00
186Field Change Payment (FCP) (697.03)DOL237,000$1.00$1.00$1.00$1.00$1.00
187Asphalt Price Adjustment (698.04)DOL12,975$1.00$1.00$1.00$1.00$1.00
188Fuel Price Adjustment (698.05)DOL4,699$1.00$1.00$1.00$1.00$1.00
189Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
190Mobilization (699.040001)LS1$212,000$72,850$208,352$225,000$232,000
NYSDOT contract D265547: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of August 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy