Cold Spring Construction Company: NYSDOT bid record
Cold Spring Construction Company submitted 123 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 01 OCT 2026, and was the low bidder on 22 of them (18%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $205,415,220
- Latest bid
- 01 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 20 | 5 | 25% |
| 2023 | 31 | 5 | 16% |
| 2024 | 17 | 2 | 12% |
| 2025 | 35 | 6 | 17% |
| 2026 | 20 | 4 | 20% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 05 | 51 | 7 | 14% |
| Region 04 | 41 | 10 | 24% |
| Region 06 | 20 | 4 | 20% |
| Region 03 | 7 | 0 | 0% |
| Region 09 | 2 | 1 | 50% |
| Region 01, 02, 03, 04, 05, 06, 07, 08, 09, 10 | 1 | 0 | 0% |
| Region 02 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel Price Adjustment | 698.05 | DOL | 118 | 118 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 118 | 118 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 117 | 117 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 117 | 117 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 111 | 111 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 85 | 85 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 49 | 49 (100%) | $90.00 | $90.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 46 | 46 (100%) | $85.00 | $85.00 |
| 691.04000020 | 42 | 42 (100%) | $1.00 | $1.00 | ||
| Concrete Cylinder Curing Equipment | 637.04 | EACH | 47 | 41 (87%) | $300.00 | $2,800.00 |
| Type A Sign Posts | 645.81 | EACH | 85 | 38 (45%) | $225.00 | $250.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 80 | 38 (48%) | $41.75 | $45.44 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sealand Contractors Corp. | 44 | 18 of 44 |
| Concrete Applied Technologies Corp/DBA:Catco | 41 | 30 of 41 |
| McLaughlin Construction Corp/DBA Edbauer Construction | 30 | 24 of 30 |
| Oakgrove Construction Inc | 25 | 20 of 25 |
| The L C Whitford Co Inc | 22 | 18 of 22 |
| Villager Construction Inc | 21 | 8 of 21 |
| Union Concrete & Construction Corp | 20 | 17 of 20 |
| Keeler Construction Co Inc | 17 | 13 of 17 |
| Slate Hill Constructors Inc | 16 | 10 of 16 |
| Ramsey Constructors Inc | 16 | 9 of 16 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | D265839 | Region 06 | BRIDGE JOINT REPAIRS 2026/27 | 1 of 3 | $1,189,981 | Low, 47% under the second |
| 17 SEP 2026 | D265830 | Region 04 | O'Rorke Lift Bridge Repair | 1 of 1 | $9,972,715 | Low |
| 17 SEP 2026 | D265847 | Region 05 | Signal Requirements; SFY 26/27, 27/28, 28/29 | 5 of 5 | $3,049,410 | +60% |
| 13 AUG 2026 | D265689 | Region 04 | Replacement of Six Culverts | 3 of 8 | $8,949,980 | +23% |
| 30 JUL 2026 | D265702 | Region 03 | I-81 VIADUCT (COMMUNITY GRID) - CONTRACT 6A | 3 of 3 | $203,888,129 | +42% |
| 16 JUL 2026 | D265796 | Region 03 | I-81 OVER RT 11 NEDROW BRIDGE REPLACEMENT | 3 of 6 | $19,706,636 | +7.0% |
| 25 JUN 2026 | D265768 | Region 02 | BRIDGE PROJECT - North Genesee Street Gateway, City of Utica | 3 of 4 | $80,095,185 | +28% |
| 25 JUN 2026 | D265801 | Region 05 | SMALL CULVERT MAINTENANCE; SFY 26/27 | 3 of 3 | $1,716,617 | +28% |
| 04 JUN 2026 | D265766 | Region 05 | Pavement PM - Single Course Mill & Overlay- NY Rte 417 | 2 of 3 | $5,332,764 | +14% |
| 04 JUN 2026 | D265779 | Region 03 | PAVEMENT REHABILITATION - Routes NY-5 & US-20 | 3 of 5 | $22,830,663 | +12% |
| 04 JUN 2026 | D265793 | Region 05 | Replacement of Overhead Sign & Ground Mounted Signs | 2 of 3 | $1,350,127 | +8.0% |
| 21 MAY 2026 | D265772 | Region 05 | Culvert Replacement & Signal Rehabilitation - I-990 & NY-263 | 4 of 4 | $4,454,550 | +23% |
| 07 MAY 2026 | D265770 | Region 05 | US 219 Crack & Seat & C540082 Rehabilitation | 4 of 4 | $13,858,997 | +35% |
| 16 APR 2026 | D265773 | Region 05 | HIGHWAY RESURFACING- Route NY 198, Scajaquada Expressway | 1 of 2 | $7,757,794 | Low, 8.0% under the second |
| 12 MAR 2026 | D265690 | Region 05 | BRIDGE & CULVERT REPLACE; NY RT 5 & US RT 20, Twn of Evans | 4 of 4 | $30,039,000 | +26% |
| 12 MAR 2026 | D265758 | Region 05 | Maintenance Paving Contract; I-190 & NY-951A; Niagara County | 3 of 3 | $11,989,232 | +38% |
| 26 FEB 2026 | D265737 | Region 05 | TRAFFIC SIGNAL VEHICLE DETECTION | 4 of 4 | $897,630 | +26% |
| 08 JAN 2026 | D265627 | Region 04 | PAVEMENT RESURFACING - NYS Route 286 | 3 of 3 | $12,868,503 | +17% |
| 08 JAN 2026 | D265634 | Region 04 | PAVEMENT RESURFACING & SIGNAL IMPROVEMENTS - Route 15 | 4 of 4 | $7,674,140 | +33% |
| 08 JAN 2026 | D265636 | Region 04 | RESURFACING - I-390, Towns of Brighton | 1 of 2 | $22,189,673 | Low, 2.0% under the second |
| 04 DEC 2025 | D265590 | Region 05 | STRUCTURE REPLACEMENT - NY Route 5 (S.H. 62-20) | 1 of 4 | $8,325,000 | Low, 1.0% under the second |
| 04 DEC 2025 | D265625 | Region 06 | BRIDGE REPLACEMENT - NY 371 over Kirkwood Creek | 3 of 5 | $4,531,038 | +18% |
| 20 NOV 2025 | D265577 | Region 04 | BRIDGE REPLACEMENT - NY Rt 19 over Black Creek Overflow | 2 of 2 | $3,083,460 | +24% |
| 20 NOV 2025 | D265603 | Region 05 | HIGHWAY RESURFACING; I-86, Southern Tier Expressway; SNI | 6 of 6 | $7,201,799 | +29% |
| 06 NOV 2025 | D265598 | Region 05 | ITS REHABILITATION - I-290, I-990, & NY 198 | 2 of 3 | $4,496,685 | +3.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.