Sealand Contractors Corp.: NYSDOT bid record
Sealand Contractors Corp. submitted 70 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 13 AUG 2026, and was the low bidder on 4 of them (6%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $22,998,002
- Latest bid
- 13 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 19 | 0 | 0% |
| 2023 | 19 | 2 | 11% |
| 2024 | 9 | 0 | 0% |
| 2025 | 15 | 2 | 13% |
| 2026 | 8 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 04 | 34 | 3 | 9% |
| Region 03 | 15 | 1 | 7% |
| Region 06 | 11 | 0 | 0% |
| Region 05 | 4 | 0 | 0% |
| Region 02 | 4 | 0 | 0% |
| Region 09 | 1 | 0 | 0% |
| Region 03, 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 70 | 70 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 70 | 70 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 70 | 70 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 69 | 69 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 63 | 63 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 56 | 56 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 41 | 41 (100%) | $85.00 | $90.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 38 | 38 (100%) | $85.00 | $85.00 |
| 691.04000020 | 34 | 34 (100%) | $1.00 | $1.00 | ||
| Engineer’s Field Office – Type 2 | 637.12 | MONTH | 46 | 31 (67%) | $2,000.00 | $2,500.00 |
| 662.60010004 | 22 | 22 (100%) | $1.00 | $1.00 | ||
| Pavement Patching (Force Acount) | 619.2601 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cold Spring Construction Company | 44 | 26 of 44 |
| Villager Construction Inc | 21 | 11 of 21 |
| Ramsey Constructors Inc | 17 | 13 of 17 |
| Slate Hill Constructors Inc | 13 | 12 of 13 |
| Keeler Construction Co Inc | 13 | 10 of 13 |
| Seneca Stone Corp | 11 | 7 of 11 |
| Barrett Paving Materials Inc | 11 | 8 of 11 |
| Bothar Construction LLC | 10 | 8 of 10 |
| The L C Whitford Co Inc | 8 | 8 of 8 |
| Economy Paving Co Inc | 8 | 8 of 8 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | D265689 | Region 04 | Replacement of Six Culverts | 7 of 8 | $10,817,001 | +49% |
| 25 JUN 2026 | D265768 | Region 02 | BRIDGE PROJECT - North Genesee Street Gateway, City of Utica | 4 of 4 | $84,390,001 | +35% |
| 04 JUN 2026 | D265779 | Region 03 | PAVEMENT REHABILITATION - Routes NY-5 & US-20 | 5 of 5 | $28,783,001 | +42% |
| 09 APR 2026 | D265755 | Region 04 | Route 14 from Route 31 to Former Village of Lyons North Line | 2 of 3 | $6,123,000 | +30% |
| 05 MAR 2026 | D265747 | Region 03 | PAVEMENT RESURFACING - Route 5 Bypass | 3 of 3 | $12,790,000 | +76% |
| 08 JAN 2026 | D265627 | Region 04 | PAVEMENT RESURFACING - NYS Route 286 | 2 of 3 | $11,662,001 | +6.0% |
| 08 JAN 2026 | D265634 | Region 04 | PAVEMENT RESURFACING & SIGNAL IMPROVEMENTS - Route 15 | 2 of 4 | $7,142,000 | +24% |
| 08 JAN 2026 | D265636 | Region 04 | RESURFACING - I-390, Towns of Brighton | 2 of 2 | $22,528,000 | +2.0% |
| 23 OCT 2025 | D265512 | Region 04 | Bridge Replacement Project NY-33A Over The Erie Canal | 2 of 2 | $22,130,000 | +4.0% |
| 23 OCT 2025 | D265561 | Region 04 | Large Culvert Resiliency Replacement | 1 of 7 | $4,541,001 | Low, 2.0% under the second |
| 23 OCT 2025 | D265580 | Region 03 | HIGHWAY MILL & FILL - Rts I-81, SH 54-3, SH 57-6 & SH 57-8 | 1 of 3 | $11,203,001 | Low, 3.0% under the second |
| 25 SEP 2025 | D265549 | Region 04 | Replacement/Repair of 7 Culverts in Ontario County. | 3 of 5 | $9,061,000 | +13% |
| 11 SEP 2025 | D265518 | Region 06 | CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo | 4 of 5 | $7,269,001 | +19% |
| 21 AUG 2025 | D265520 | Region 06 | Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1 | 4 of 8 | $40,451,000 | +11% |
| 10 JUL 2025 | D265492 | Region 06 | Mill & Fill Paving on I-86 | 3 of 4 | $4,718,001 | +30% |
| 10 JUL 2025 | D265530 | Region 02 | PAVEMENT REHABILITATION - Rte 46, Lansingkill to Holmes Rd | 2 of 3 | $9,504,000 | +30% |
| 26 JUN 2025 | D265474 | Region 03 | Large Culvert Rehabilitation Project | 4 of 4 | $6,014,001 | +51% |
| 05 JUN 2025 | D265489 | Region 03 | MBC Rt 13/34/96, Rt 79, Rt 89, and Safety Improvements | 2 of 2 | $32,447,001 | +18% |
| 24 APR 2025 | D265481 | Region 06 | NY14A Paving and Safety System Improvements | 5 of 5 | $6,504,000 | +18% |
| 10 APR 2025 | D265439 | Region 04 | Replacement of 7 Culverts | 5 of 5 | $7,373,001 | +6.0% |
| 27 FEB 2025 | D265423 | Region 03 | Highway Reconstruction Rt 370 Liverpool | 4 of 5 | $16,252,000 | +17% |
| 27 FEB 2025 | D265425 | Region 04 | Pavement Resurfacing and Drainage Rehabilitation I-490 | 3 of 3 | $28,574,000 | +19% |
| 09 JAN 2025 | D265381 | Region 04 | Intersection Safety Enhancements Rte 33A/Rte 259 | 2 of 3 | $5,339,001 | +29% |
| 19 DEC 2024 | D265336 | Region 04 | BRIDGE & ROAD DECK REPLACEMENTS | 3 of 3 | $63,353,000 | +24% |
| 24 OCT 2024 | D265302 | Region 04 | PAVEMENT REHABILITATION - Route 204 | 3 of 4 | $11,212,000 | +16% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.