Barrett Paving Materials Inc: NYSDOT bid record
Barrett Paving Materials Inc submitted 45 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 27 AUG 2026, and was the low bidder on 11 of them (24%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $71,967,405
- Latest bid
- 27 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 2 | 25% |
| 2023 | 7 | 1 | 14% |
| 2024 | 11 | 3 | 27% |
| 2025 | 8 | 2 | 25% |
| 2026 | 11 | 3 | 27% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 02 | 19 | 1 | 5% |
| Region 03 | 12 | 5 | 42% |
| Region 09 | 6 | 1 | 17% |
| Region 07 | 6 | 3 | 50% |
| Region 01 | 1 | 1 | 100% |
| Region 03, 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 41 | 41 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 41 | 41 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 41 | 41 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 41 | 41 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 40 | 40 (100%) | $1.00 | $1.00 |
| Reference Marker Panel | 646.21 | EACH | 32 | 26 (81%) | $40.00 | $45.00 |
| Type A Sign Posts | 645.81 | EACH | 36 | 25 (69%) | $215.00 | $250.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 35 | 24 (69%) | $41.00 | $45.44 |
| 691.04000020 | 22 | 22 (100%) | $1.00 | $1.00 | ||
| 619.0901 | LF | 33 | 21 (64%) | $0.28 | $0.40 | |
| Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) | 647.61 | EACH | 32 | 20 (63%) | $37.50 | $50.00 |
| Steel Post, 2.0 lb/ft | 646.32 | EACH | 30 | 20 (67%) | $76.25 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rifenburg Construction Inc | 17 | 8 of 17 |
| Bothar Construction LLC | 12 | 8 of 12 |
| Sealand Contractors Corp. | 11 | 3 of 11 |
| Cci Companies Inc | 7 | 7 of 7 |
| Lancaster Development and Tully Construction Co LLC | 7 | 3 of 7 |
| Seneca Stone Corp | 7 | 2 of 7 |
| Heidelberg Materials Northeast-Ny LLC | 6 | 6 of 6 |
| Slate Hill Constructors Inc | 6 | 4 of 6 |
| Suit-Kote Corporation | 5 | 4 of 5 |
| Dolomite Products Co Inc | 5 | 3 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | D265810 | Region 09 | NY 201 Pavement Resurfacing, Flyover to Harry L. Drive | 2 of 3 | $10,117,768 | +2.0% |
| 30 JUL 2026 | D265807 | Region 02 | 2025 Paving Contract (West) Route 5A, 12B & 26 | 3 of 4 | $2,899,330 | +12% |
| 04 JUN 2026 | D265779 | Region 03 | PAVEMENT REHABILITATION - Routes NY-5 & US-20 | 2 of 5 | $22,188,551 | +9.0% |
| 07 MAY 2026 | D265767 | Region 03 | RESURFACING - Route 931G & Route 370 | 1 of 2 | $3,838,235 | Low, 57% under the second |
| 26 MAR 2026 | D265660 | Region 02 | Route 20 Pavement Rehabilitation: Sangerfield to Bridgewater | 1 of 2 | $5,362,822 | Low, 7.0% under the second |
| 05 MAR 2026 | D265745 | Region 03 | PAVEMENT RESURFACING - Route 13 | 2 of 3 | $14,978,834 | +8.0% |
| 05 MAR 2026 | D265747 | Region 03 | PAVEMENT RESURFACING - Route 5 Bypass | 2 of 3 | $8,020,460 | +10% |
| 26 FEB 2026 | D265658 | Region 02 | RTE 5 TO DOLGEVILLE VILLAGE LANE PAVING PROJECT | 2 of 2 | $4,992,614 | +4.0% |
| 05 FEB 2026 | D265659 | Region 02 | PAVEMENT PREVENTATIVE MAINTENANCE - Route 46 | 3 of 3 | $5,799,800 | +27% |
| 05 FEB 2026 | D265682 | Region 09 | HIGHWAY MILL & FILL - I-81 Exit 13B to 21 | 4 of 4 | $27,512,506 | +48% |
| 05 FEB 2026 | D265738 | Region 07 | STANDBY WHERE & WHEN HIGHWAY 2025 | 1 of 2 | $663,367 | Low, 6.0% under the second |
| 18 DEC 2025 | D265568 | Region 07 | CULVERT RESILIENCY OF STATE SYSTEM - REHABILITATION WITH ROW | 1 of 3 | $2,492,000 | Low, 45% under the second |
| 04 DEC 2025 | D265579 | Region 02 | INTERSECTION IMPROVEMENT PROJECT-Rt 46/Wright Settlement Rd | 3 of 3 | $2,660,976 | +40% |
| 23 OCT 2025 | D265580 | Region 03 | HIGHWAY MILL & FILL - Rts I-81, SH 54-3, SH 57-6 & SH 57-8 | 2 of 3 | $11,500,000 | +3.0% |
| 10 JUL 2025 | D265530 | Region 02 | PAVEMENT REHABILITATION - Rte 46, Lansingkill to Holmes Rd | 3 of 3 | $9,727,626 | +33% |
| 10 JUL 2025 | D265537 | Region 03 | INTERSECTIONS IMPROVEMENT REQUIREMENTS | 1 of 1 | $7,615,268 | Low |
| 27 MAR 2025 | D265465 | Region 02 | PAVEMENT PREVENTATIVE MAINTENANCE - RT 30 | 2 of 2 | $8,732,547 | +8.0% |
| 27 MAR 2025 | D265469 | Region 02 | MULTI-SITE PAVEMENT PROJECT 24 - Various Locations | 3 of 3 | $6,896,117 | +23% |
| 27 FEB 2025 | D265423 | Region 03 | Highway Reconstruction Rt 370 Liverpool | 5 of 5 | $19,898,990 | +43% |
| 21 NOV 2024 | D265332 | Region 07 | 1 MILE OF HIGHWAY REHABILITATION ALONG NY ROUTE 3 | 4 of 4 | $8,178,270 | +42% |
| 24 OCT 2024 | D265327 | Region 03 | MAINTENANCE BY CONTRACT, PAVEMENT & SLOPE REPAIR | 1 of 4 | $19,524,208 | Low, 19% under the second |
| 10 OCT 2024 | D265257 | Region 02 | ROUTE 12B & 412 PAVEMENT REHABILATION: VILLAGE OF CLINTON | 4 of 5 | $10,756,355 | +22% |
| 12 SEP 2024 | D265304 | Region 03 | Rt 481 NB Off Ramp at Circle and Rt 481 Safety Improvements | 4 of 9 | $3,208,976 | +8.0% |
| 08 AUG 2024 | D265271 | Region 02 | PAVEMENT REHABILITATION PROJECT RTE 12D, RTE 46 & RTE 294 | 3 of 5 | $3,169,683 | +5.0% |
| 11 JUL 2024 | D265237 | Region 02 | INTERSECTION SAFETY PROJECT - ROUTE 921W BURRSTONE RD. | 2 of 3 | $3,478,281 | +5.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.