Heidelberg Materials Northeast-Ny LLC: NYSDOT bid record
Heidelberg Materials Northeast-Ny LLC submitted 10 bids on New York State DOT contracts in the data, from 16 FEB 2023 to 27 MAR 2025, and was the low bidder on 5 of them (50%). When it was not low, its total sat a median +3.0% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $31,430,200
- Latest bid
- 27 MAR 2025
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 1 | 1 | 100% |
| 2024 | 6 | 3 | 50% |
| 2025 | 3 | 1 | 33% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 02 | 7 | 5 | 71% |
| Region 09 | 2 | 0 | 0% |
| Region 03, 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Reference Marker Panel | 646.21 | EACH | 10 | 9 (90%) | $42.62 | $45.00 |
| Type A Sign Posts | 645.81 | EACH | 10 | 8 (80%) | $222.50 | $250.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 9 | 8 (89%) | $40.00 | $45.44 |
| Steel Post, 2.0 lb/ft | 646.32 | EACH | 9 | 8 (89%) | $79.25 | $85.00 |
| Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) | 647.61 | EACH | 10 | 7 (70%) | $36.50 | $50.00 |
| Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel | 646.23 | EACH | 8 | 7 (88%) | $25.88 | $25.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 10 | 6 (60%) | $26.75 | $71.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Barrett Paving Materials Inc | 6 | 0 of 6 |
| Rifenburg Construction Inc | 4 | 0 of 4 |
| Cobleskill Stone Products Inc. | 4 | 2 of 4 |
| Dolomite Products Co Inc/DBA A L Blades | 3 | 1 of 3 |
| Bothar Construction LLC | 3 | 0 of 3 |
| Sealand Contractors Corp. | 2 | 0 of 2 |
| Lancaster Development and Tully Construction Co LLC | 2 | 0 of 2 |
| Seneca Stone Corp | 1 | 1 of 1 |
| Villager Construction Inc | 1 | 0 of 1 |
| Central Paving Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 MAR 2025 | D265446 | Region 09 | I88 RESURFACING AND JOINT REPAIRS | 2 of 3 | $14,489,851 | +9.0% |
| 27 MAR 2025 | D265469 | Region 02 | MULTI-SITE PAVEMENT PROJECT 24 - Various Locations | 2 of 3 | $5,709,987 | +2.0% |
| 27 FEB 2025 | D265417 | Region 02 | PAVEMENT REHABILITATION - Rt 67: Rt. 5 to Rt. 10 | 1 of 2 | $4,969,621 | Low, 22% under the second |
| 10 OCT 2024 | D265257 | Region 02 | ROUTE 12B & 412 PAVEMENT REHABILATION: VILLAGE OF CLINTON | 1 of 5 | $8,813,475 | Low, 11% under the second |
| 08 AUG 2024 | D265271 | Region 02 | PAVEMENT REHABILITATION PROJECT RTE 12D, RTE 46 & RTE 294 | 1 of 5 | $3,006,471 | Low, 1.0% under the second |
| 23 MAY 2024 | D265260 | Region 02 | ROUTES 5S AND 920T PAVEMENT REHABILITATION PROJECT | 2 of 3 | $1,004,153 | +2.0% |
| 28 MAR 2024 | D265230 | Region 02 | REGION 2 MULTI SITE PAVEMENT REHABILITATION | 1 of 6 | $2,503,667 | Low, 10% under the second |
| 08 FEB 2024 | D265154 | Region 09 | I-88 Crack and Seat, Exit 18 to 19, Otsego County | 2 of 3 | $24,603,681 | +13% |
| 11 JAN 2024 | D265166 | Region 03, 04 | RESURFACING - NY Rte. 5 & US Rte. 20 | 2 of 6 | $1,444,567 | +3.0% |
| 16 FEB 2023 | D264956 | Region 02 | RT 8 PAVEMENT REHABILITATION | 1 of 3 | $12,136,966 | Low, 3.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.