Bothar Construction LLC: NYSDOT bid record

Bothar Construction LLC submitted 107 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 17 SEP 2026, and was the low bidder on 39 of them (36%). When it was not low, its total sat a median +14% above the low bid.

Owner
New York State DOT
Low bid volume
$147,975,785
Latest bid
17 SEP 2026
Data through
15 OCT 2026
107Bids
39Low bids
36Win rate, percent
+14%Median gap to the low bid when not low, 68 bids

By year

YearBidsLow bidsWin rate
2022251248%
202316531%
202427622%
202522836%
202617847%
Bothar Construction LLC, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 09482246%
Region 0616319%
Region 0216319%
Region 0310220%
Region 077229%
Region 085360%
Region 0433100%
Region 01, 072150%
Bothar Construction LLC, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL9797 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL9797 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL9595 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL8888 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL8585 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL4444 (100%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT2929 (100%)$75.00$85.00
Asphalt Pavement Joint Adhesive418.7603LF7326 (36%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.000013QUALITY UNIT2626 (100%)$80.00$90.00
Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.020102TON5224 (46%)$240.47$307.93
404.0001TON2424 (100%)$80.00$95.00
Miscellaneous Cold Milling of Bituminous Concrete490.30SY4623 (50%)$12.68$16.00
Bothar Construction LLC, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Bothar Construction LLC, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
17 SEP 2026D265829Region 09NYS Rte 51 (BIN 1026410) over Dunderberg Creek1 of 5$1,167,158Low, 5.0% under the second
27 AUG 2026D265794Region 09Large Culvert Replacement.1 of 6$9,323,525Low, 4.0% under the second
27 AUG 2026D265810Region 09NY 201 Pavement Resurfacing, Flyover to Harry L. Drive1 of 3$9,897,897Low, 2.0% under the second
30 JUL 2026D265807Region 022025 Paving Contract (West) Route 5A, 12B & 261 of 4$2,580,581Low, 7.0% under the second
16 JUL 2026D265790Region 08CRACK SEAL & MASTIC REGION WIDE1 of 3$1,618,801Low, 3.0% under the second
07 MAY 2026D265753Region 09HIGHWAY/BRIDGE BINGHAMTON GATEWAY PROJECT -NY 3632 of 2$49,522,770+6.0%
07 MAY 2026D265792Region 06NY 14, NY 962E, NY 962F MbC; Miracle Mile1 of 2$5,607,608Low, 7.0% under the second
12 MAR 2026D265700Region 09Rehabilitation of I-86 Bridges over ICRR4 of 4$8,845,220+31%
12 MAR 2026D265720Region 09Oneonta Rt. 23 & 28 safety & mobility improvements.1 of 1$7,807,046Low
12 MAR 2026D265752Region 06I-86 Paving Horseheads to Elmira2 of 2$7,067,768+19%
05 MAR 2026D265745Region 03PAVEMENT RESURFACING - Route 133 of 3$15,797,708+14%
05 FEB 2026D265667Region 09JOC Highway/Drainage Combined, Chenango and Otsego Counties3 of 3$1,278,357+50%
05 FEB 2026D265669Region 09JOC Highway/Drainage Combined, Broome and Tioga Counties1 of 1$964,072Low
05 FEB 2026D265692Region 07ADA ACCESSIBILITY IMPROVEMENTS - Various Locations2 of 4$1,479,480+35%
05 FEB 2026D265696Region 01, 07CRACK SEALING - Filling & Sealing Pavement & Shoulders2 of 3$1,187,977+2.0%
22 JAN 2026D265629Region 09BRIDGE DECK REPLACEMENT - NYS Route 434 Over Choconut Creek4 of 5$5,000,000+14%
22 JAN 2026D265674Region 09RETAINING WALL IMPROVEMENT - NY Route 524 of 5$4,000,000+16%
18 DEC 2025D265595Region 09LARGE CULVERT AND BRIDGE REPLACEMENT - NY Route 12 (SH 505)1 of 3$4,876,877Low, 7.0% under the second
04 DEC 2025D265604Region 04Crack Sealing Regionwide 20261 of 3$877,878Low, 6.0% under the second
06 NOV 2025D265607Region 09Where & When Highway 2026/27, Regionwide2 of 2$7,204,816+7.0%
11 SEP 2025D265517Region 09BRIDGE REPLACEMENT- NY Route 34 over Dry Run Creek2 of 5$4,477,778+11%
11 SEP 2025D265518Region 06CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo5 of 5$7,612,593+25%
11 SEP 2025D265553Region 02LARGE CULVERT REPLACEMENTS4 of 5$5,415,622+13%
11 SEP 2025D265554Region 02REPLACEMENT OF ROUTE 51 CULVERT OVER STEELE CREEK4 of 5$2,824,242+7.0%
07 AUG 2025D265493Region 03Route 221 Over Big Brook Bridge Replacement4 of 6$2,899,900+12%
Bothar Construction LLC: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy