Bothar Construction LLC: NYSDOT bid record
Bothar Construction LLC submitted 107 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 17 SEP 2026, and was the low bidder on 39 of them (36%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $147,975,785
- Latest bid
- 17 SEP 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 25 | 12 | 48% |
| 2023 | 16 | 5 | 31% |
| 2024 | 27 | 6 | 22% |
| 2025 | 22 | 8 | 36% |
| 2026 | 17 | 8 | 47% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 09 | 48 | 22 | 46% |
| Region 06 | 16 | 3 | 19% |
| Region 02 | 16 | 3 | 19% |
| Region 03 | 10 | 2 | 20% |
| Region 07 | 7 | 2 | 29% |
| Region 08 | 5 | 3 | 60% |
| Region 04 | 3 | 3 | 100% |
| Region 01, 07 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 97 | 97 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 97 | 97 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 95 | 95 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 88 | 88 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 85 | 85 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 44 | 44 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 29 | 29 (100%) | $75.00 | $85.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 73 | 26 (36%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 26 | 26 (100%) | $80.00 | $90.00 |
| Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.020102 | TON | 52 | 24 (46%) | $240.47 | $307.93 |
| 404.0001 | TON | 24 | 24 (100%) | $80.00 | $95.00 | |
| Miscellaneous Cold Milling of Bituminous Concrete | 490.30 | SY | 46 | 23 (50%) | $12.68 | $16.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Slate Hill Constructors Inc | 35 | 20 of 35 |
| Economy Paving Co Inc | 32 | 13 of 32 |
| Vector Construction Corp | 28 | 14 of 28 |
| Lancaster Development and Tully Construction Co LLC | 21 | 4 of 21 |
| R De Vincentis Construction Inc | 14 | 7 of 14 |
| Barrett Paving Materials Inc | 12 | 4 of 12 |
| Annseal Inc | 11 | 2 of 11 |
| Suit-Kote Corporation | 11 | 7 of 11 |
| Sealand Contractors Corp. | 10 | 2 of 10 |
| Dalrymple Gravel & Contracting Co Inc | 9 | 5 of 9 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | D265829 | Region 09 | NYS Rte 51 (BIN 1026410) over Dunderberg Creek | 1 of 5 | $1,167,158 | Low, 5.0% under the second |
| 27 AUG 2026 | D265794 | Region 09 | Large Culvert Replacement. | 1 of 6 | $9,323,525 | Low, 4.0% under the second |
| 27 AUG 2026 | D265810 | Region 09 | NY 201 Pavement Resurfacing, Flyover to Harry L. Drive | 1 of 3 | $9,897,897 | Low, 2.0% under the second |
| 30 JUL 2026 | D265807 | Region 02 | 2025 Paving Contract (West) Route 5A, 12B & 26 | 1 of 4 | $2,580,581 | Low, 7.0% under the second |
| 16 JUL 2026 | D265790 | Region 08 | CRACK SEAL & MASTIC REGION WIDE | 1 of 3 | $1,618,801 | Low, 3.0% under the second |
| 07 MAY 2026 | D265753 | Region 09 | HIGHWAY/BRIDGE BINGHAMTON GATEWAY PROJECT -NY 363 | 2 of 2 | $49,522,770 | +6.0% |
| 07 MAY 2026 | D265792 | Region 06 | NY 14, NY 962E, NY 962F MbC; Miracle Mile | 1 of 2 | $5,607,608 | Low, 7.0% under the second |
| 12 MAR 2026 | D265700 | Region 09 | Rehabilitation of I-86 Bridges over ICRR | 4 of 4 | $8,845,220 | +31% |
| 12 MAR 2026 | D265720 | Region 09 | Oneonta Rt. 23 & 28 safety & mobility improvements. | 1 of 1 | $7,807,046 | Low |
| 12 MAR 2026 | D265752 | Region 06 | I-86 Paving Horseheads to Elmira | 2 of 2 | $7,067,768 | +19% |
| 05 MAR 2026 | D265745 | Region 03 | PAVEMENT RESURFACING - Route 13 | 3 of 3 | $15,797,708 | +14% |
| 05 FEB 2026 | D265667 | Region 09 | JOC Highway/Drainage Combined, Chenango and Otsego Counties | 3 of 3 | $1,278,357 | +50% |
| 05 FEB 2026 | D265669 | Region 09 | JOC Highway/Drainage Combined, Broome and Tioga Counties | 1 of 1 | $964,072 | Low |
| 05 FEB 2026 | D265692 | Region 07 | ADA ACCESSIBILITY IMPROVEMENTS - Various Locations | 2 of 4 | $1,479,480 | +35% |
| 05 FEB 2026 | D265696 | Region 01, 07 | CRACK SEALING - Filling & Sealing Pavement & Shoulders | 2 of 3 | $1,187,977 | +2.0% |
| 22 JAN 2026 | D265629 | Region 09 | BRIDGE DECK REPLACEMENT - NYS Route 434 Over Choconut Creek | 4 of 5 | $5,000,000 | +14% |
| 22 JAN 2026 | D265674 | Region 09 | RETAINING WALL IMPROVEMENT - NY Route 52 | 4 of 5 | $4,000,000 | +16% |
| 18 DEC 2025 | D265595 | Region 09 | LARGE CULVERT AND BRIDGE REPLACEMENT - NY Route 12 (SH 505) | 1 of 3 | $4,876,877 | Low, 7.0% under the second |
| 04 DEC 2025 | D265604 | Region 04 | Crack Sealing Regionwide 2026 | 1 of 3 | $877,878 | Low, 6.0% under the second |
| 06 NOV 2025 | D265607 | Region 09 | Where & When Highway 2026/27, Regionwide | 2 of 2 | $7,204,816 | +7.0% |
| 11 SEP 2025 | D265517 | Region 09 | BRIDGE REPLACEMENT- NY Route 34 over Dry Run Creek | 2 of 5 | $4,477,778 | +11% |
| 11 SEP 2025 | D265518 | Region 06 | CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo | 5 of 5 | $7,612,593 | +25% |
| 11 SEP 2025 | D265553 | Region 02 | LARGE CULVERT REPLACEMENTS | 4 of 5 | $5,415,622 | +13% |
| 11 SEP 2025 | D265554 | Region 02 | REPLACEMENT OF ROUTE 51 CULVERT OVER STEELE CREEK | 4 of 5 | $2,824,242 | +7.0% |
| 07 AUG 2025 | D265493 | Region 03 | Route 221 Over Big Brook Bridge Replacement | 4 of 6 | $2,899,900 | +12% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.