Suit-Kote Corporation: NYSDOT bid record

Suit-Kote Corporation submitted 18 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 05 MAR 2026, and was the low bidder on 10 of them (56%). When it was not low, its total sat a median +13% above the low bid.

Owner
New York State DOT
Low bid volume
$79,435,838
Latest bid
05 MAR 2026
Data through
15 OCT 2026
18Bids
10Low bids
56Win rate, percent
+13%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20225240%
20237343%
20242150%
202522100%
202622100%
Suit-Kote Corporation, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 039444%
Region 098675%
Region 04100%
Suit-Kote Corporation, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL1414 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1414 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1414 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1414 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL1313 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL99 (100%)$1.00$1.00
Steel Post, 2.0 lb/ft646.32EACH98 (89%)$80.00$85.00
Box Beam Guide Railing606.10LF88 (100%)$48.70$55.00
627.50140008117 (64%)$4.20$6.00
Subbase Course, Optional Type304.15CY117 (64%)$67.00$90.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT77 (100%)$75.00$85.00
Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars645.5102SF86 (75%)$38.00$45.44
Suit-Kote Corporation, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Suit-Kote Corporation, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
05 MAR 2026D265745Region 03PAVEMENT RESURFACING - Route 131 of 3$13,822,789Low, 8.0% under the second
05 FEB 2026D265682Region 09HIGHWAY MILL & FILL - I-81 Exit 13B to 211 of 4$18,621,020Low, 14% under the second
06 NOV 2025D265607Region 09Where & When Highway 2026/27, Regionwide1 of 2$6,761,013Low, 7.0% under the second
10 APR 2025D265438Region 03WHERE AND WHEN HIGHWAY STANDBY CONTRACT1 of 2$2,954,094Low, 23% under the second
19 DEC 2024D265359Region 09BRIDGE REHAB/ENVIRO IMPROVEMENT-Various Locations1 of 9$1,103,932Low, 8.0% under the second
12 SEP 2024D265304Region 03Rt 481 NB Off Ramp at Circle and Rt 481 Safety Improvements9 of 9$4,668,855+57%
26 OCT 2023D265083Region 03SMALL CULVERT REHAB/REPLACE, I81-Tully Town Line to Rt112 of 3$1,342,501+1.0%
26 OCT 2023D265120Region 09STANDBY WHERE & WHEN HIGHWAY 2023/24, REGION-WIDE1 of 2$4,665,878Low, 1.0% under the second
29 JUN 2023D265023Region 03INTERSECTION IMPROVEMENTS, Route 31, Town Of Cicero.2 of 10$9,225,338+10%
20 APR 2023D264939Region 09CULVERT REPLACEMENT, BROOME, CHENANGO & SULLIVAN CO.3 of 5$4,865,589+7.0%
23 MAR 2023D264866Region 09CULVERT REPAIR PROJECT FFY221 of 5$4,605,663Low, 8.0% under the second
23 MAR 2023D265006Region 03WHERE AND WHEN HIGHWAY STANDBY CONTRACT1 of 3$2,790,524Low, 23% under the second
09 MAR 2023D264947Region 09SCOUR PROJECT 20224 of 4$1,353,178+84%
01 DEC 2022D264557Region 03Region 3 Bridge NY Culvert Repair and Replacement Project5 of 6$4,496,066+25%
15 SEP 2022D264849Region 03NY ROUTE 38 & 38A PEDESTRIAN SAFETY IMPROVEMENT PROJECT2 of 4$660,939+4.0%
10 MAR 2022D264715Region 03MBC - ROUTE 366, EAST OF HOY RD. TO RTE. 13/366 INTERCHANGE1 of 5$4,362,375Low, 14% under the second
03 FEB 2022D264702Region 09I81, EXIT 7 TO CORTLAND COUNTY LINE, MILLING AND RESURFACING1 of 3$19,748,551Low, 24% under the second
20 JAN 2022D264701Region 04Pavement Resurfacing and Signal Improvements: Route 104.5 of 7$8,929,098+15%
Suit-Kote Corporation: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.