Suit-Kote Corporation: NYSDOT bid record
Suit-Kote Corporation submitted 18 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 05 MAR 2026, and was the low bidder on 10 of them (56%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $79,435,838
- Latest bid
- 05 MAR 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 2 | 40% |
| 2023 | 7 | 3 | 43% |
| 2024 | 2 | 1 | 50% |
| 2025 | 2 | 2 | 100% |
| 2026 | 2 | 2 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 03 | 9 | 4 | 44% |
| Region 09 | 8 | 6 | 75% |
| Region 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 9 | 9 (100%) | $1.00 | $1.00 |
| Steel Post, 2.0 lb/ft | 646.32 | EACH | 9 | 8 (89%) | $80.00 | $85.00 |
| Box Beam Guide Railing | 606.10 | LF | 8 | 8 (100%) | $48.70 | $55.00 |
| 627.50140008 | 11 | 7 (64%) | $4.20 | $6.00 | ||
| Subbase Course, Optional Type | 304.15 | CY | 11 | 7 (64%) | $67.00 | $90.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 7 | 7 (100%) | $75.00 | $85.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 8 | 6 (75%) | $38.00 | $45.44 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Bothar Construction LLC | 11 | 4 of 11 |
| Slate Hill Constructors Inc | 11 | 4 of 11 |
| Lancaster Development and Tully Construction Co LLC | 6 | 1 of 6 |
| Economy Paving Co Inc | 6 | 3 of 6 |
| Vector Construction Corp | 6 | 2 of 6 |
| Barrett Paving Materials Inc | 5 | 1 of 5 |
| Sealand Contractors Corp. | 4 | 1 of 4 |
| Seneca Stone Corp | 3 | 1 of 3 |
| Rifenburg Construction Inc | 3 | 1 of 3 |
| Maple Ridge Organics LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 MAR 2026 | D265745 | Region 03 | PAVEMENT RESURFACING - Route 13 | 1 of 3 | $13,822,789 | Low, 8.0% under the second |
| 05 FEB 2026 | D265682 | Region 09 | HIGHWAY MILL & FILL - I-81 Exit 13B to 21 | 1 of 4 | $18,621,020 | Low, 14% under the second |
| 06 NOV 2025 | D265607 | Region 09 | Where & When Highway 2026/27, Regionwide | 1 of 2 | $6,761,013 | Low, 7.0% under the second |
| 10 APR 2025 | D265438 | Region 03 | WHERE AND WHEN HIGHWAY STANDBY CONTRACT | 1 of 2 | $2,954,094 | Low, 23% under the second |
| 19 DEC 2024 | D265359 | Region 09 | BRIDGE REHAB/ENVIRO IMPROVEMENT-Various Locations | 1 of 9 | $1,103,932 | Low, 8.0% under the second |
| 12 SEP 2024 | D265304 | Region 03 | Rt 481 NB Off Ramp at Circle and Rt 481 Safety Improvements | 9 of 9 | $4,668,855 | +57% |
| 26 OCT 2023 | D265083 | Region 03 | SMALL CULVERT REHAB/REPLACE, I81-Tully Town Line to Rt11 | 2 of 3 | $1,342,501 | +1.0% |
| 26 OCT 2023 | D265120 | Region 09 | STANDBY WHERE & WHEN HIGHWAY 2023/24, REGION-WIDE | 1 of 2 | $4,665,878 | Low, 1.0% under the second |
| 29 JUN 2023 | D265023 | Region 03 | INTERSECTION IMPROVEMENTS, Route 31, Town Of Cicero. | 2 of 10 | $9,225,338 | +10% |
| 20 APR 2023 | D264939 | Region 09 | CULVERT REPLACEMENT, BROOME, CHENANGO & SULLIVAN CO. | 3 of 5 | $4,865,589 | +7.0% |
| 23 MAR 2023 | D264866 | Region 09 | CULVERT REPAIR PROJECT FFY22 | 1 of 5 | $4,605,663 | Low, 8.0% under the second |
| 23 MAR 2023 | D265006 | Region 03 | WHERE AND WHEN HIGHWAY STANDBY CONTRACT | 1 of 3 | $2,790,524 | Low, 23% under the second |
| 09 MAR 2023 | D264947 | Region 09 | SCOUR PROJECT 2022 | 4 of 4 | $1,353,178 | +84% |
| 01 DEC 2022 | D264557 | Region 03 | Region 3 Bridge NY Culvert Repair and Replacement Project | 5 of 6 | $4,496,066 | +25% |
| 15 SEP 2022 | D264849 | Region 03 | NY ROUTE 38 & 38A PEDESTRIAN SAFETY IMPROVEMENT PROJECT | 2 of 4 | $660,939 | +4.0% |
| 10 MAR 2022 | D264715 | Region 03 | MBC - ROUTE 366, EAST OF HOY RD. TO RTE. 13/366 INTERCHANGE | 1 of 5 | $4,362,375 | Low, 14% under the second |
| 03 FEB 2022 | D264702 | Region 09 | I81, EXIT 7 TO CORTLAND COUNTY LINE, MILLING AND RESURFACING | 1 of 3 | $19,748,551 | Low, 24% under the second |
| 20 JAN 2022 | D264701 | Region 04 | Pavement Resurfacing and Signal Improvements: Route 104. | 5 of 7 | $8,929,098 | +15% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.