Rifenburg Construction Inc: NYSDOT bid record
Rifenburg Construction Inc submitted 55 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 12 MAR 2026, and was the low bidder on 15 of them (27%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $116,724,725
- Latest bid
- 12 MAR 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 19 | 6 | 32% |
| 2023 | 12 | 4 | 33% |
| 2024 | 12 | 2 | 17% |
| 2025 | 8 | 2 | 25% |
| 2026 | 4 | 1 | 25% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 01 | 28 | 8 | 29% |
| Region 02 | 13 | 5 | 38% |
| Region 03 | 5 | 1 | 20% |
| Region 09 | 4 | 0 | 0% |
| Region 07 | 3 | 0 | 0% |
| Region 08 | 1 | 1 | 100% |
| Region 03, 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 54 | 54 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 54 | 54 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 54 | 54 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 54 | 54 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 53 | 53 (100%) | $1.00 | $1.00 |
| Box Beam Guide Railing | 606.10 | LF | 40 | 37 (93%) | $49.25 | $55.00 |
| Type A Sign Posts | 645.81 | EACH | 46 | 36 (78%) | $225.00 | $250.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 54 | 33 (61%) | $0.50 | $1.00 |
| Steel Post, 2.0 lb/ft | 646.32 | EACH | 40 | 33 (83%) | $79.62 | $85.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 43 | 32 (74%) | $42.00 | $45.44 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 31 | 31 (100%) | $75.00 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Barrett Paving Materials Inc | 17 | 9 of 17 |
| Callanan Industries Inc | 15 | 9 of 15 |
| Bothar Construction LLC | 8 | 7 of 8 |
| Kubricky-Jointa Lime LLC | 8 | 6 of 8 |
| Peckham Road Corp | 7 | 2 of 7 |
| Cci Companies Inc | 6 | 4 of 6 |
| Sealand Contractors Corp. | 6 | 0 of 6 |
| Hanson Aggregates New York LLC | 5 | 3 of 5 |
| Kubricky Construction Corp | 5 | 2 of 5 |
| Slate Hill Constructors Inc | 5 | 3 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 MAR 2026 | D265705 | Region 01 | 910F & I-87 Resurfacing | 1 of 2 | $22,837,115 | Low, 11% under the second |
| 26 FEB 2026 | D265710 | Region 01 | Pavement Setaside & Green Island Bridge Reconfiguration | 2 of 2 | $18,463,115 | +3.0% |
| 05 FEB 2026 | D265704 | Region 01 | PAVEMENT RESURFACING - Route I-87 - Mohawk River to Exit 11 | 2 of 4 | $20,669,115 | +10% |
| 08 JAN 2026 | D265643 | Region 01 | CULVERT REPAIR - NY Routes 385 and 149, Various Locations | 3 of 3 | $2,605,115 | +24% |
| 06 NOV 2025 | D265587 | Region 01 | I-90 Pavement Resurfacing from I-87 to Corporate Woods | 2 of 2 | $11,483,115 | +8.0% |
| 23 OCT 2025 | D265582 | Region 01 | Drainage Repair and Resurfacing - Route 5 (Central Ave) | 3 of 3 | $8,161,115 | +35% |
| 27 MAR 2025 | D265319 | Region 01 | BRIDGE REPLACEMENT - US Route 9W over CSX Railroad | 3 of 3 | $17,173,115 | +5.0% |
| 27 MAR 2025 | D265456 | Region 01 | PAVEMENT RESURFACING - Various Locations | 2 of 3 | $13,521,115 | +7.0% |
| 27 FEB 2025 | D265418 | Region 01 | CULVERT REPAIR & REPLACEMENT - Various Locations. | 1 of 3 | $7,425,115 | Low, 11% under the second |
| 27 FEB 2025 | D265423 | Region 03 | Highway Reconstruction Rt 370 Liverpool | 1 of 5 | $13,885,115 | Low, 4.0% under the second |
| 23 JAN 2025 | D265369 | Region 09 | INTERSECTION RECONSTRUCTION - Routes 7 & 23 | 2 of 6 | $4,274,115 | +5.0% |
| 09 JAN 2025 | D265358 | Region 01 | NY Route 146 Mobility and Safety Improvements | 2 of 2 | $9,291,115 | +2.0% |
| 21 NOV 2024 | D265328 | Region 01 | Culvert Repair / Replacement SFY 25 | 3 of 4 | $4,397,115 | +15% |
| 21 NOV 2024 | D265332 | Region 07 | 1 MILE OF HIGHWAY REHABILITATION ALONG NY ROUTE 3 | 3 of 4 | $8,063,115 | +40% |
| 24 OCT 2024 | D265327 | Region 03 | MAINTENANCE BY CONTRACT, PAVEMENT & SLOPE REPAIR | 3 of 4 | $24,062,115 | +23% |
| 10 OCT 2024 | D265257 | Region 02 | ROUTE 12B & 412 PAVEMENT REHABILATION: VILLAGE OF CLINTON | 5 of 5 | $10,785,115 | +22% |
| 12 SEP 2024 | D265304 | Region 03 | Rt 481 NB Off Ramp at Circle and Rt 481 Safety Improvements | 6 of 9 | $3,712,115 | +25% |
| 08 AUG 2024 | D265271 | Region 02 | PAVEMENT REHABILITATION PROJECT RTE 12D, RTE 46 & RTE 294 | 5 of 5 | $3,973,115 | +32% |
| 11 JUL 2024 | D265261 | Region 01 | INTERSECTION SAFETY IMPROVEMENT - NY Rte 29 | 3 of 3 | $4,215,115 | +25% |
| 23 MAY 2024 | D265263 | Region 01 | I-90 & 378 Resurfacing Corporate Woods to I-787 | 1 of 2 | $5,225,115 | Low, 26% under the second |
| 11 APR 2024 | D265216 | Region 01 | Pavement Corrective Maintenance 24A | 3 of 3 | $20,595,115 | +11% |
| 14 MAR 2024 | D265114 | Region 02 | ROUTE 12 BOONVILLE SAFETY PROJECT | 1 of 2 | $2,373,115 | Low, 14% under the second |
| 11 JAN 2024 | D265166 | Region 03, 04 | RESURFACING - NY Rte. 5 & US Rte. 20 | 5 of 6 | $1,656,115 | +18% |
| 11 JAN 2024 | D265177 | Region 01 | Culvert Repair / Replacement SFY 2024 | 2 of 2 | $7,597,115 | +29% |
| 30 NOV 2023 | D265135 | Region 01 | I-87 Resurfacing: Exit 31 to Clinton County Line | 3 of 4 | $14,497,115 | +5.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.