NYSDOT contract D265358 bid tabulation
NY Route 146 Mobility and Safety Improvements. Let by New York State DOT on January 9, 2025, Saratoga, Region 01. 2 bids received; low bid $9,116,840 by Kubricky-Jointa Lime LLC.
- Owner
- New York State DOT
- Letting
- 09 JAN 2025
- Pay items
- 164
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kubricky-Jointa Lime LLC | $9,116,840 | Low |
| 2 | Rifenburg Construction Inc | $9,291,115 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kubricky-Jointa Lime LLC | 2. Rifenburg Construction Inc |
|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 7,304 | $26.50 | $27.50 |
| 2 | Embankment In Place (203.03) | CY | 2,044 | $10.75 | $26.50 |
| 3 | Select Granular Fill (203.07) | CY | 299 | $31.50 | $23.00 |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 954 | $70.50 | $31.50 |
| 5 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 864 | $42.00 | $55.00 |
| 6 | Test Pit Excavation (206.05) | EACH | 44 | $1,200.00 | $1,100.00 |
| 7 | Geotextile Drainage (207.22) | SY | 796 | $2.45 | $2.25 |
| 8 | Geotextile Stabilization (207.24) | SY | 6,645 | $1.30 | $1.25 |
| 9 | (208.01030022) | 197 | $115.00 | $100.00 | |
| 10 | Mulch – Temporary (209.100101) | SY | 4,995 | $1.00 | $0.94 |
| 11 | Seed and Mulch – Temporary (209.1003) | SY | 4,995 | $1.10 | $0.99 |
| 12 | (209.11010024) | 47 | $290.00 | $200.00 | |
| 13 | Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag – Temporary (209.110201) | EACH | 14 | $1,100.00 | $725.00 |
| 14 | Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602) | EACH | 5 | $1,000.00 | $1,200.00 |
| 15 | Silt Fence - Temporary (209.13) | LF | 6,026 | $4.50 | $4.10 |
| 16 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 1,006 | $6.80 | $6.25 |
| 17 | Stabilized Construction Access (209.22) | SY | 200 | $40.00 | $33.00 |
| 18 | Sediment Filter Log, 12″ (209.2301) | LF | 372 | $16.50 | $14.90 |
| 19 | Subbase Course, Type 2 (304.12) | CY | 2,927 | $97.50 | $133.50 |
| 20 | (404.0001) | TON | 777 | $85.00 | $85.00 |
| 21 | (404.1262) | TON | 9,523 | $100.00 | $122.00 |
| 22 | (404.1989) | TON | 3,533 | $110.00 | $123.50 |
| 23 | (404.3789) | TON | 2,466 | $85.50 | $119.00 |
| 24 | Straight Tack Coat (407.0103) | GAL | 6,375 | $3.50 | $3.00 |
| 25 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 53,031 | $1.25 | $0.50 |
| 26 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 79,067 | $4.50 | $2.75 |
| 27 | Shields and Shoring (552.17) | SF | 3,143 | $1.10 | $0.10 |
| 28 | (603.9812) | LF | 6 | $550.00 | $600.00 |
| 29 | (603.9815) | LF | 352 | $76.00 | $159.00 |
| 30 | (603.9818) | LF | 90 | $125.00 | $120.00 |
| 31 | (604.070101) | EACH | 17 | $1,250.00 | $1,775.00 |
| 32 | (604.301772) | LF | 38 | $850.00 | $735.00 |
| 33 | (604.302122) | LF | 23 | $985.00 | $700.00 |
| 34 | (604.4048) | LF | 14 | $730.00 | $740.00 |
| 35 | Underdrain Filter, Type II (605.1001) | CY | 106 | $62.00 | $65.00 |
| 36 | (605.1701) | LF | 1,426 | $8.80 | $17.50 |
| 37 | (605.1702) | LF | 758 | $8.90 | $5.00 |
| 38 | Box Beam Guide Railing (606.10) | LF | 221 | $48.50 | $44.50 |
| 39 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 31 | $58.50 | $53.75 |
| 40 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,150.00 | $1,980.00 |
| 41 | Resetting Box Beam Guide Railing (606.53) | LF | 94 | $43.50 | $40.00 |
| 42 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 285 | $5.45 | $5.00 |
| 43 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 2 | $110.00 | $100.00 |
| 44 | Concrete Sidewalks and Driveways (608.0101) | CY | 247 | $1,700.00 | $1,200.00 |
| 45 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 35 | $255.00 | $180.00 |
| 46 | (608.21000003) | 41 | $740.00 | $478.50 | |
| 47 | (609.0401) | LF | 2,306 | $92.50 | $103.50 |
| 48 | Compost (610.10) | CY | 758 | $99.00 | $70.50 |
| 49 | (610.15120208) | 1,161 | $1.05 | $2.25 | |
| 50 | Turf Establishment – Performance (610.1605) | SY | 4,991 | $21.50 | $10.50 |
| 51 | (614.060204) | EACH | 1 | $790.00 | $395.00 |
| 52 | (614.060304) | EACH | 6 | $1,650.00 | $885.00 |
| 53 | (614.060404) | EACH | 1 | $2,050.00 | $1,690.00 |
| 54 | (614.060504) | EACH | 1 | $3,250.00 | $2,995.00 |
| 55 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,243,000 | $1,243,250 |
| 56 | Type III Construction Barricades (619.04) | EACH | 90 | $32.00 | $200.00 |
| 57 | (619.0901) | LF | 50,681 | $0.69 | $0.59 |
| 58 | (619.111113) | EACH | 5 | $9,050.00 | $3,500.00 |
| 59 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 13 | $285.00 | $125.00 |
| 60 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $178,000 | $200,000 |
| 61 | Stone Filling (Light) (620.03) | CY | 9 | $310.00 | $139.00 |
| 62 | Bedding Material, Type 1 (620.0801) | CY | 5 | $180.00 | $130.00 |
| 63 | Survey Operations (625.01) | LS | 1 | $47,200 | $75,000 |
| 64 | (625.09010015) | LS | 1 | $8,550.00 | $10,500 |
| 65 | (627.50140008) | 5,062 | $7.45 | $4.50 | |
| 66 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $585.00 | $1,000.00 |
| 67 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $4,350.00 | $3,000.00 |
| 68 | Rain Gauge (637.26) | EACH | 1 | $175.00 | $200.00 |
| 69 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 |
| 70 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 71 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 72 | Anchor Bolts (644.11) | LB | 1,711 | $11.50 | $8.25 |
| 73 | Drilled Shaft for Overhead Sign Structures (644.20) | CY | 64 | $3,500.00 | $2,925.00 |
| 74 | (644.435060) | EACH | 1 | $284,000 | $285,500 |
| 75 | (644.436030) | EACH | 1 | $311,000 | $315,255 |
| 76 | Performance Concrete Quality Adjustment (644.99) | QUALITY UNIT | 1 | $24.00 | $24.00 |
| 77 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 6 | $65.50 | $41.75 |
| 78 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,567 | $39.50 | $42.75 |
| 79 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 757 | $30.50 | $48.00 |
| 80 | Overhead Sign Panels (645.61) | SF | 741 | $49.00 | $58.00 |
| 81 | Type A Sign Posts (645.81) | EACH | 230 | $195.00 | $250.00 |
| 82 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 14 | $1,150.00 | $1,775.00 |
| 83 | Concrete Footing for Type A, or Breakaway Wooden Sign Posts with Steel Tube Inserts (645.8107) | EACH | 15 | $765.00 | $1,250.00 |
| 84 | (645.81090003) | 30 | $49.00 | $90.00 | |
| 85 | (645.830402) | EACH | 6 | $5,250.00 | $6,000.00 |
| 86 | (645.830502) | EACH | 2 | $5,900.00 | $7,800.00 |
| 87 | Reference Marker Panel (646.21) | EACH | 26 | $38.00 | $43.00 |
| 88 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 2 | $22.00 | $25.75 |
| 89 | Steel Post, 1.1 lb/ft (646.31) | EACH | 32 | $60.00 | $66.50 |
| 90 | Steel Post, 2.0 lb/ft (646.32) | EACH | 2 | $82.00 | $86.50 |
| 91 | Removal of Single Span Overhead Sign Panel(s), Structure, and Foundations (647.21) | EACH | 2 | $22,900 | $23,725 |
| 92 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 7 | $240.00 | $250.00 |
| 93 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 157 | $27.50 | $65.00 |
| 94 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 212 | $44.50 | $75.00 |
| 95 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 10 | $160.00 | $1,500.00 |
| 96 | Cast Frame F2, Mountable Curb Box CM2 & Reticuline Grate G2 (655.0702) | EACH | 7 | $2,600.00 | $2,250.00 |
| 97 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 2 | $1,850.00 | $1,250.00 |
| 98 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 4 | $2,200.00 | $1,900.00 |
| 99 | Manhole Frame & Cover (655.1202) | EACH | 2 | $1,650.00 | $1,425.00 |
| 100 | (662.60000108) | 3,000 | $1.00 | $1.00 | |
| 101 | Relocate Existing Hydrant (663.31) | EACH | 2 | $5,600.00 | $8,400.00 |
| 102 | Adjust Existing Valve Box Elevation (663.33) | EACH | 4 | $150.00 | $400.00 |
| 103 | Ground Wire No. 6 AWG. (670.7501) | LF | 1,876 | $7.75 | $3.06 |
| 104 | (680.05010007) | 7 | $22,300 | $20,700 | |
| 105 | (680.05020007) | 6 | $3,800.00 | $3,570.00 | |
| 106 | Pole Excavation and Concrete Foundation (680.5001) | CY | 128 | $1,950.00 | $1,750.00 |
| 107 | (680.51000010) | 1 | $760.00 | $675.00 | |
| 108 | (680.510501) | EACH | 18 | $1,300.00 | $1,215.00 |
| 109 | (680.520103) | LF | 111 | $14.50 | $14.75 |
| 110 | (680.520506) | LF | 200 | $10.50 | $12.00 |
| 111 | (680.520508) | LF | 756 | $16.50 | $20.00 |
| 112 | (680.601034) | EACH | 1 | $20,900 | $22,930 |
| 113 | (680.601334) | EACH | 1 | $24,000 | $27,710 |
| 114 | (680.601433) | EACH | 2 | $22,100 | $27,490 |
| 115 | (680.601434) | EACH | 1 | $24,500 | $28,180 |
| 116 | (680.601436) | EACH | 1 | $24,900 | $29,000 |
| 117 | (680.601437) | EACH | 1 | $25,200 | $29,700 |
| 118 | (680.601438) | EACH | 1 | $25,700 | $29,460 |
| 119 | (680.601534) | EACH | 1 | $27,100 | $27,860 |
| 120 | (680.601540) | EACH | 1 | $27,800 | $33,400 |
| 121 | (680.601938) | EACH | 1 | $28,900 | $35,780 |
| 122 | (680.6708) | EACH | 15 | $1,300.00 | $1,495.00 |
| 123 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 10 | $2,150.00 | $3,380.00 |
| 124 | (680.730514) | LF | 12,942 | $4.00 | $3.75 |
| 125 | (680.731014) | LF | 1,505 | $5.70 | $6.65 |
| 126 | (680.731514) | LF | 131 | $8.75 | $9.70 |
| 127 | (680.79000001) | LS | 1 | $13,300 | $26,700 |
| 128 | (680.80324515) | 7 | $865.00 | $2,100.00 | |
| 129 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 24 | $105.00 | $145.00 |
| 130 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 18 | $115.00 | $150.00 |
| 131 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 24 | $105.00 | $145.00 |
| 132 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 23 | $110.00 | $155.00 |
| 133 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 24 | $105.00 | $150.00 |
| 134 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 25 | $115.00 | $165.00 |
| 135 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 138 | $165.00 | $175.00 |
| 136 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 36 | $485.00 | $635.00 |
| 137 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 3 | $590.00 | $750.00 |
| 138 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 40 | $320.00 | $240.00 |
| 139 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 20 | $380.00 | $255.00 |
| 140 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 15 | $275.00 | $305.00 |
| 141 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 20 | $255.00 | $255.00 |
| 142 | (680.8151) | EACH | 20 | $1,100.00 | $1,325.00 |
| 143 | Backplates for Traffic Signal Heads (680.8199) | EACH | 42 | $355.00 | $345.00 |
| 144 | (680.8210) | EACH | 46 | $495.00 | $775.00 |
| 145 | Breakaway Transformer Base (680.8223) | EACH | 5 | $950.00 | $895.00 |
| 146 | (680.82250601) | 4 | $465.00 | $450.00 | |
| 147 | (680.82250801) | 11 | $460.00 | $460.00 | |
| 148 | (680.90920008) | 3 | $410.00 | $840.00 | |
| 149 | Watertight Disconnect Box (680.9401) | EACH | 7 | $300.00 | $735.00 |
| 150 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 7 | $275.00 | $450.00 |
| 151 | (680.950106) | LF | 1,140 | $7.75 | $3.00 |
| 152 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $6.00 | $6.00 |
| 153 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 28,110 | $1.15 | $1.00 |
| 154 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 24,071 | $1.15 | $1.00 |
| 155 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 25,963 | $3.50 | $3.00 |
| 156 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 29,012 | $3.05 | $2.59 |
| 157 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 248 | $88.00 | $75.00 |
| 158 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 104 | $250.00 | $215.00 |
| 159 | (691.04000020) | 36,000 | $1.00 | $1.00 | |
| 160 | Field Change Payment (FCP) (697.03) | DOL | 546,240 | $1.00 | $1.00 |
| 161 | Asphalt Price Adjustment (698.04) | DOL | 53,000 | $1.00 | $1.00 |
| 162 | Fuel Price Adjustment (698.05) | DOL | 26,900 | $1.00 | $1.00 |
| 163 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 164 | Mobilization (699.040001) | LS | 1 | $350,000 | $357,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.