Kubricky-Jointa Lime LLC: NYSDOT bid record
Kubricky-Jointa Lime LLC submitted 24 bids on New York State DOT contracts in the data, from 14 SEP 2023 to 15 OCT 2026, and was the low bidder on 7 of them (29%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $53,283,308
- Latest bid
- 15 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 2 | 0 | 0% |
| 2024 | 6 | 2 | 33% |
| 2025 | 10 | 4 | 40% |
| 2026 | 6 | 1 | 17% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 01 | 11 | 4 | 36% |
| Region 07 | 9 | 1 | 11% |
| Region 02 | 4 | 2 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 22 | 22 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Type III Construction Barricades | 619.04 | EACH | 16 | 12 (75%) | $63.25 | $115.00 |
| 691.04000020 | 12 | 12 (100%) | $1.00 | $1.00 | ||
| 404.0001 | TON | 12 | 12 (100%) | $80.00 | $95.00 | |
| 627.50140008 | 20 | 11 (55%) | $6.77 | $6.00 | ||
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 21 | 10 (48%) | $1.20 | $1.00 |
| Performance Concrete Quality Adjustment – Concrete for Structures | 555.9902 | QUALITY UNIT | 10 | 10 (100%) | $11.25 | $10.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rifenburg Construction Inc | 8 | 2 of 8 |
| Luck Brothers Inc | 7 | 6 of 7 |
| Peckham Road Corp | 4 | 1 of 4 |
| Slate Hill Constructors Inc | 4 | 2 of 4 |
| Callanan Industries Inc | 4 | 2 of 4 |
| Ing Civil Inc | 4 | 3 of 4 |
| Vector Construction Corp | 4 | 4 of 4 |
| Barrett Paving Materials Inc | 3 | 2 of 3 |
| Peter Luizzi & Bros Contracting Inc | 3 | 1 of 3 |
| Bette & Cring LLC | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 OCT 2026 | D265834 | Region 02 | Route 5 Pavement Rehabilitation: City of Amsterdam | 5 of 5 | $2,308,323 | +50% |
| 12 MAR 2026 | D265705 | Region 01 | 910F & I-87 Resurfacing | 2 of 2 | $25,280,631 | +11% |
| 12 MAR 2026 | D265716 | Region 01 | PAVEMENT CORRECTIVE MAINTENANCE SFY 26B | 2 of 2 | $15,964,221 | +5.0% |
| 12 MAR 2026 | D265726 | Region 07 | REGION 7 CROSS PIN 6 - BRIDGE RESILIENCY PROJECT. | 3 of 3 | $8,197,940 | +18% |
| 05 FEB 2026 | D265692 | Region 07 | ADA ACCESSIBILITY IMPROVEMENTS - Various Locations | 4 of 4 | $1,984,714 | +81% |
| 05 FEB 2026 | D265704 | Region 01 | PAVEMENT RESURFACING - Route I-87 - Mohawk River to Exit 11 | 1 of 4 | $18,707,797 | Low, 10% under the second |
| 18 DEC 2025 | D265568 | Region 07 | CULVERT RESILIENCY OF STATE SYSTEM - REHABILITATION WITH ROW | 2 of 3 | $3,625,269 | +45% |
| 18 DEC 2025 | D265657 | Region 07 | CULVERT RESILIENCY PROJECT - VARIOUS LOCATIONS | 1 of 2 | $9,137,555 | Low, 38% under the second |
| 04 DEC 2025 | D265597 | Region 07 | BRIDGE REPLACEMENTS (3), US ROUTE 11 | 3 of 3 | $13,797,159 | +38% |
| 23 OCT 2025 | D265570 | Region 02 | BRIDGE REPLACEMENT - Route 28 over Rock River | 1 of 2 | $4,949,335 | Low, 7.0% under the second |
| 11 SEP 2025 | D265544 | Region 02 | REPLACEMENT OF ROUTE 30 CULVERT OVER HATCHERY BROOK | 1 of 2 | $2,095,459 | Low, 15% under the second |
| 21 AUG 2025 | D265545 | Region 01 | BRIDGE DECK REPLACEMENT PROJECT | 4 of 4 | $12,646,500 | +34% |
| 27 FEB 2025 | D265418 | Region 01 | CULVERT REPAIR & REPLACEMENT - Various Locations. | 3 of 3 | $9,806,384 | +32% |
| 27 FEB 2025 | D265437 | Region 01 | Region 1 Pavement Corrective Maintenance | 2 of 3 | $6,926,190 | +8.0% |
| 20 FEB 2025 | D265299 | Region 07 | CULVERT RESILENCY PROJECT - Routes I-87, 374, 12F & 178 | 3 of 3 | $2,744,467 | +42% |
| 09 JAN 2025 | D265358 | Region 01 | NY Route 146 Mobility and Safety Improvements | 1 of 2 | $9,116,840 | Low, 2.0% under the second |
| 19 DEC 2024 | D265368 | Region 01 | I87 NB Exit 32 Ramp/Bridge Replacement over Spruce Mill | 5 of 5 | $5,819,001 | +23% |
| 19 DEC 2024 | D265391 | Region 07 | CULVERT RESILIENCY PROJECT-Various Locations | 3 of 3 | $4,324,347 | +21% |
| 21 NOV 2024 | D265332 | Region 07 | 1 MILE OF HIGHWAY REHABILITATION ALONG NY ROUTE 3 | 2 of 4 | $7,060,531 | +22% |
| 21 NOV 2024 | D265347 | Region 02 | Intersection improvement - RTE 67 AT CLIZBE AVENUE | 5 of 8 | $623,117 | +39% |
| 11 JUL 2024 | D265261 | Region 01 | INTERSECTION SAFETY IMPROVEMENT - NY Rte 29 | 1 of 3 | $3,377,322 | Low, 3.0% under the second |
| 11 JAN 2024 | D265177 | Region 01 | Culvert Repair / Replacement SFY 2024 | 1 of 2 | $5,899,001 | Low, 29% under the second |
| 30 NOV 2023 | D265135 | Region 01 | I-87 Resurfacing: Exit 31 to Clinton County Line | 2 of 4 | $13,868,034 | +1.0% |
| 14 SEP 2023 | D265071 | Region 07 | RECONSTRUCTION OF RAIL & STATION PLATFORMS, Tupper Lake | 3 of 3 | $11,753,776 | +28% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.