Luck Brothers Inc: NYSDOT bid record
Luck Brothers Inc submitted 23 bids on New York State DOT contracts in the data, from 04 AUG 2022 to 05 FEB 2026, and was the low bidder on 9 of them (39%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $46,157,239
- Latest bid
- 05 FEB 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 0 | 0% |
| 2023 | 7 | 3 | 43% |
| 2024 | 6 | 3 | 50% |
| 2025 | 5 | 3 | 60% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 07 | 18 | 8 | 44% |
| Region 01 | 4 | 1 | 25% |
| Region 03 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 22 | 22 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 22 | 22 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 22 | 22 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 14 | 14 (100%) | $80.00 | $90.00 |
| Bedding Material, Type 1 | 620.0801 | CY | 17 | 12 (71%) | $76.67 | $120.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 22 | 10 (45%) | $24.14 | $71.00 |
| Structure Excavation | 206.01 | CY | 19 | 9 (47%) | $27.98 | $38.00 |
| 404.0001 | TON | 9 | 9 (100%) | $80.00 | $95.00 | |
| Trench and Culvert Excavation | 206.0201 | CY | 18 | 8 (44%) | $43.73 | $55.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vector Construction Corp | 11 | 7 of 11 |
| Kubricky-Jointa Lime LLC | 7 | 1 of 7 |
| Ing Civil Inc | 5 | 2 of 5 |
| Winn Construction Services Inc | 4 | 3 of 4 |
| Slate Hill Constructors Inc | 4 | 2 of 4 |
| Tuscarora Construction Co Inc | 3 | 2 of 3 |
| Rifenburg Construction Inc | 3 | 1 of 3 |
| Tioga Construction Company Inc | 3 | 2 of 3 |
| Barrett Paving Materials Inc | 3 | 0 of 3 |
| Reale Construction Co Inc | 3 | 1 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 FEB 2026 | D265692 | Region 07 | ADA ACCESSIBILITY IMPROVEMENTS - Various Locations | 3 of 4 | $1,600,000 | +46% |
| 18 DEC 2025 | D265657 | Region 07 | CULVERT RESILIENCY PROJECT - VARIOUS LOCATIONS | 2 of 2 | $12,601,601 | +38% |
| 04 DEC 2025 | D265597 | Region 07 | BRIDGE REPLACEMENTS (3), US ROUTE 11 | 1 of 3 | $9,996,791 | Low, 34% under the second |
| 06 NOV 2025 | D265592 | Region 07 | BRIDGE REPLACEMENT - NY Route 3, Town of Hounsfield | 1 of 4 | $2,230,559 | Low, 10% under the second |
| 13 MAR 2025 | D265458 | Region 07 | INTERSECTION IMPROVEMENTS | 1 of 1 | $1,927,627 | Low |
| 20 FEB 2025 | D265299 | Region 07 | CULVERT RESILENCY PROJECT - Routes I-87, 374, 12F & 178 | 2 of 3 | $2,522,220 | +30% |
| 19 DEC 2024 | D265368 | Region 01 | I87 NB Exit 32 Ramp/Bridge Replacement over Spruce Mill | 1 of 5 | $4,732,927 | Low, 1.0% under the second |
| 19 DEC 2024 | D265384 | Region 07 | PIN 7042.46 - N.Y. ROUTE 26 BRIDGE REHABILITATION | 6 of 6 | $4,094,720 | +64% |
| 19 DEC 2024 | D265391 | Region 07 | CULVERT RESILIENCY PROJECT-Various Locations | 2 of 3 | $3,775,425 | +6.0% |
| 21 NOV 2024 | D265332 | Region 07 | 1 MILE OF HIGHWAY REHABILITATION ALONG NY ROUTE 3 | 1 of 4 | $5,770,770 | Low, 22% under the second |
| 26 SEP 2024 | D265305 | Region 01 | Route 9N over Styles Brook | 5 of 6 | $2,453,597 | +10% |
| 08 FEB 2024 | D265208 | Region 07 | CARDIN RD OVER BEAVER CREEK CULVERT REPLACEMENT | 1 of 3 | $914,539 | Low, 17% under the second |
| 30 NOV 2023 | D265146 | Region 07 | BRIDGE REPLACEMENT RT 30 DEER RIVER FLOW TOWN OF DUANE | 2 of 4 | $2,999,379 | 0.0% |
| 26 OCT 2023 | D265076 | Region 07 | BRIDGE REPLACEMENT-CONSTRUCTION OF BIN 1080440 | 1 of 5 | $11,962,222 | Low, 4.0% under the second |
| 14 SEP 2023 | D265063 | Region 01 | Bridge Replacement, Route 22 over Boquet River | 2 of 2 | $3,653,829 | +6.0% |
| 13 JUL 2023 | D265048 | Region 07 | REPLACEMENT OF BIN N.Y. ROUTE 58 OVER CHIPPEWA CREEK | 4 of 4 | $2,599,126 | +15% |
| 06 APR 2023 | D264988 | Region 07 | BRIDGE REHAB, US Rt 9 , BIN 1005950, Towns OF Ausable & Peru | 1 of 2 | $6,248,654 | Low, 14% under the second |
| 06 APR 2023 | D265008 | Region 07 | BRIDGE MAINTENANCE BY CONTRACT (BMBC) 2023 | 1 of 2 | $2,373,150 | Low, 21% under the second |
| 16 FEB 2023 | D264974 | Region 07 | ADA ACCESSIBLITY IMPROVEMENTS PROJECT 2023 | 2 of 5 | $1,043,446 | +32% |
| 20 OCT 2022 | D264877 | Region 07 | CULVERT REPLACEMENTS, U.S, Hwy 11,Towns Moira & Bangor. | 3 of 4 | $4,749,022 | +20% |
| 06 OCT 2022 | D264898 | Region 07 | CULVERT REPLACEMENT Rte 458 Over Tributary Of St Regis River | 3 of 5 | $1,944,684 | +10% |
| 15 SEP 2022 | D264856 | Region 01 | Rt. 915P over I-87 Exit 24, Bridge Replacement, BIN 1053680 | 3 of 4 | $4,696,759 | +16% |
| 04 AUG 2022 | D264741 | Region 03 | CR 5 (Lake Street) Retaining Wall Improvement Project | 4 of 4 | $887,566 | +46% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.