Tioga Construction Company Inc: NYSDOT bid record
Tioga Construction Company Inc submitted 31 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 17 SEP 2026, and was the low bidder on 12 of them (39%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $102,817,259
- Latest bid
- 17 SEP 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 7 | 2 | 29% |
| 2023 | 11 | 3 | 27% |
| 2024 | 10 | 5 | 50% |
| 2025 | 2 | 2 | 100% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 02 | 11 | 5 | 45% |
| Region 09 | 10 | 1 | 10% |
| Region 07 | 7 | 5 | 71% |
| Region 03 | 2 | 0 | 0% |
| Region 01 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 29 | 29 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Medical Testing | 570.02 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 15 | 15 (100%) | $75.00 | $85.00 |
| Personal-Exposure-Monitoring Sample Analysis | 570.03 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Protective Sealing of New Structural Concrete | 559.02 | SF | 20 | 14 (70%) | $0.60 | $2.00 |
| Box Beam Guide Railing | 606.10 | LF | 22 | 13 (59%) | $50.00 | $55.00 |
| Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays | 559.01 | SF | 18 | 12 (67%) | $0.50 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Slate Hill Constructors Inc | 23 | 8 of 23 |
| Vector Construction Corp | 23 | 9 of 23 |
| Ing Civil Inc | 10 | 3 of 10 |
| Economy Paving Co Inc | 10 | 6 of 10 |
| Winn Construction Services Inc | 9 | 2 of 9 |
| Bothar Construction LLC | 5 | 2 of 5 |
| Harrison & Burrowes Bridge Constructors Inc | 4 | 0 of 4 |
| R De Vincentis Construction Inc | 4 | 3 of 4 |
| Bette & Cring LLC | 3 | 2 of 3 |
| James H Maloy Inc | 3 | 1 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | D265806 | Region 09 | RT 23 bridge replacement over Canasawacta Creek | 3 of 7 | $4,738,596 | +4.0% |
| 18 DEC 2025 | D265612 | Region 07 | NY Route 410 over the Black River Bridge Replacement | 1 of 2 | $24,193,378 | Low, 47% under the second |
| 07 AUG 2025 | D265535 | Region 07 | BRIDGE AND CULVERT REPLACEMENT - NY Routes 3 and 12E | 1 of 3 | $16,600,479 | Low, 10% under the second |
| 19 DEC 2024 | D265339 | Region 09 | Bridge Replacement-Route 10 over Elk Creek | 3 of 6 | $3,148,782 | +8.0% |
| 19 DEC 2024 | D265384 | Region 07 | PIN 7042.46 - N.Y. ROUTE 26 BRIDGE REHABILITATION | 1 of 6 | $2,491,400 | Low, 1.0% under the second |
| 07 NOV 2024 | D265353 | Region 09 | Bridge Rehabilitation-Bearing Replacement Project 2024 | 5 of 5 | $2,936,270 | +19% |
| 22 AUG 2024 | D265286 | Region 02 | BRIDGE REPLACEMENT - Route 29 over Caroga Creek | 1 of 7 | $2,022,228 | Low, 4.0% under the second |
| 22 AUG 2024 | D265290 | Region 07 | BRIDGE REHABILITATION - NY Route 126 over Black River | 3 of 3 | $3,763,607 | +16% |
| 08 AUG 2024 | D265265 | Region 09 | Bridge Replacement Route 23 Over Unidilla River | 2 of 6 | $7,905,310 | +1.0% |
| 09 MAY 2024 | D265246 | Region 02 | SMALL CULVERT PREVENTATIVE MAINTENANCE PROJECT 22 | 1 of 4 | $2,830,086 | Low, 0.0% under the second |
| 28 MAR 2024 | D265086 | Region 09 | RT 80 Over Hayden Creek, Bridge Replacement, Otsego Co | 1 of 3 | $2,187,028 | Low, 1.0% under the second |
| 28 MAR 2024 | D265181 | Region 02 | CULVERT REPAIR/REPLACEMENT PROJECT 23 | 1 of 4 | $2,186,013 | Low, 12% under the second |
| 14 MAR 2024 | D265190 | Region 03 | US ROUTE 11 OVER ONEIDA RIVER - BRIDGE REPLACEMENT PROJECT | 3 of 4 | $42,984,738 | +28% |
| 14 DEC 2023 | D265133 | Region 02 | RTE 162 OVER CANYON ROAD AND FLAT CREEK DECK REPLACEMENT | 2 of 7 | $3,230,069 | +14% |
| 14 DEC 2023 | D265143 | Region 02 | RTE 46 OVER ONEIDA CREEK BRIDGE REPLACEMENT | 1 of 5 | $4,385,014 | Low, 2.0% under the second |
| 30 NOV 2023 | D265131 | Region 02 | CULVERT REPAIR/REPLACEMENT PROJECT HERKIMER COUNTY | 3 of 9 | $1,041,829 | +6.0% |
| 26 OCT 2023 | D265076 | Region 07 | BRIDGE REPLACEMENT-CONSTRUCTION OF BIN 1080440 | 2 of 5 | $12,417,543 | +4.0% |
| 26 OCT 2023 | D265084 | Region 02 | REGIONAL WHERE AND WHEN 2024 & 2025 | 2 of 3 | $5,032,000 | +1.0% |
| 14 SEP 2023 | D265054 | Region 03 | SLIPLINE - ROUTE 5 OVER NINE MILE CREEK - BIN 1093459 | 3 of 6 | $5,798,277 | +25% |
| 24 AUG 2023 | D265070 | Region 09 | BRIDGE REHAB, I-81 OVER LOUGHLIN ROAD, PILE RETROFIT | 6 of 9 | $7,577,101 | +13% |
| 13 JUL 2023 | D265048 | Region 07 | REPLACEMENT OF BIN N.Y. ROUTE 58 OVER CHIPPEWA CREEK | 1 of 4 | $2,269,415 | Low, 0.0% under the second |
| 01 JUN 2023 | D265036 | Region 09 | I-88 INVERT PAVING | 5 of 7 | $2,945,781 | +18% |
| 23 MAR 2023 | D264867 | Region 02 | ROUTE 28 OVER S. INLET RAQUETTE LAKE - BRIDGE REPLACEMENT | 1 of 2 | $16,248,985 | Low, 56% under the second |
| 23 MAR 2023 | D264920 | Region 09 | RT 11 OVER TIOUGHNIOGA RIVER | 2 of 3 | $22,554,792 | +6.0% |
| 15 DEC 2022 | D264888 | Region 02 | BRIDGE REPLACEMENTS, NYS Routes 5S, 5 & 168. | 2 of 4 | $4,281,525 | +4.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.