Harrison & Burrowes Bridge Constructors Inc: NYSDOT bid record
Harrison & Burrowes Bridge Constructors Inc submitted 33 bids on New York State DOT contracts in the data, from 03 FEB 2022 to 30 JUL 2026, and was the low bidder on 4 of them (12%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $65,603,140
- Latest bid
- 30 JUL 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 9 | 1 | 11% |
| 2023 | 5 | 0 | 0% |
| 2024 | 10 | 1 | 10% |
| 2025 | 5 | 2 | 40% |
| 2026 | 4 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 01 | 13 | 0 | 0% |
| Region 08 | 12 | 4 | 33% |
| Region 09 | 5 | 0 | 0% |
| Region 02 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Office Technology and Supplies | 637.34 | DOL | 30 | 30 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 26 | 26 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 25 | 25 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 25 | 25 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| 691.04000020 | 15 | 15 (100%) | $1.00 | $1.00 | ||
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 14 | 14 (100%) | $92.50 | $90.00 |
| Medical Testing | 570.02 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Personal-Exposure-Monitoring Sample Analysis | 570.03 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs | 557.29 | SY | 15 | 12 (80%) | $0.01 | $0.10 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 12 | 12 (100%) | $75.00 | $85.00 |
| Type III Construction Barricades | 619.04 | EACH | 17 | 10 (59%) | $125.00 | $115.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| D A Collins Construction Co Inc | 11 | 6 of 11 |
| Ecco III Enterprises Inc | 7 | 4 of 7 |
| Bette & Cring LLC | 7 | 5 of 7 |
| Vector Construction Corp | 6 | 5 of 6 |
| Ing Civil Inc | 5 | 3 of 5 |
| McNamee Construction Corp | 5 | 3 of 5 |
| Slate Hill Constructors Inc | 4 | 3 of 4 |
| James H Maloy Inc | 4 | 1 of 4 |
| Winn Construction Services Inc | 4 | 2 of 4 |
| Tioga Construction Company Inc | 4 | 4 of 4 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 JUL 2026 | D265821 | Region 08 | 2027-2028 Structures Where & When | 5 of 6 | $3,196,135 | +3.0% |
| 30 JUL 2026 | D265822 | Region 08 | 2027-2028 Structures Where & When. | 2 of 5 | $3,196,135 | +1.0% |
| 07 MAY 2026 | D265769 | Region 01 | Bridge Repair/Culvert Replacement SFY 27A | 5 of 5 | $18,767,768 | +37% |
| 05 MAR 2026 | D265693 | Region 08 | BRIDGE REPLACEMENTS - Ramp G of I-84 over I-84 & 684 | 4 of 5 | $28,782,288 | +18% |
| 18 DEC 2025 | D265594 | Region 08 | BRIDGE REPLACEMENT - Route 17 over NYS Route 17K | 1 of 6 | $17,047,741 | Low, 7.0% under the second |
| 06 NOV 2025 | D265593 | Region 01 | BRIDGE REHABILITATION - Various Routes | 2 of 4 | $5,396,540 | +43% |
| 26 JUN 2025 | D265514 | Region 01 | BRIDGE WHERE & WHEN SFY 25 | 2 of 2 | $7,919,100 | +20% |
| 26 JUN 2025 | D265519 | Region 01 | BRIDGE REHABILITATION - Water Street Over D&H Railroad | 2 of 3 | $6,405,641 | +20% |
| 27 MAR 2025 | D265445 | Region 08 | BRIDGE REHABILITATION VARIOUS LOCATIONS | 1 of 3 | $16,375,164 | Low, 0.0% under the second |
| 22 AUG 2024 | D265301 | Region 08 | BRIDGE REHABILITATION - I-84, Various Locations | 1 of 4 | $4,712,471 | Low, 19% under the second |
| 22 AUG 2024 | D265323 | Region 01 | Standby Where & When Highway, Region 1, SFY 24 | 2 of 2 | $8,775,950 | +18% |
| 08 AUG 2024 | D265248 | Region 09 | RTE 42/52 over Neversink River Superstructure Replacement | 4 of 4 | $10,913,109 | +17% |
| 08 AUG 2024 | D265265 | Region 09 | Bridge Replacement Route 23 Over Unidilla River | 6 of 6 | $9,993,999 | +27% |
| 25 JUL 2024 | D265281 | Region 08 | STRUCTURES WHERE/WHEN, REGION-WIDE | 2 of 3 | $6,491,250 | +6.0% |
| 25 APR 2024 | D265226 | Region 08 | Replace/rehabilitate the selected culverts | 3 of 3 | $12,365,124 | +42% |
| 25 APR 2024 | D265238 | Region 08 | Route 9D Breakneck Tunnel Lighting Replacement | 2 of 2 | $4,991,199 | +41% |
| 28 MAR 2024 | D265033 | Region 09 | BRIDGE REHABILITATION - Bridge Street over Delaware River | 4 of 6 | $22,316,223 | +25% |
| 14 MAR 2024 | D265160 | Region 08 | BRIDGE REHABILITATIONS - Routes 52 & 304, and Illington Rd | 7 of 8 | $22,538,225 | +30% |
| 25 JAN 2024 | D265161 | Region 01 | PIN 1811.31 Bridge Deck Replacement Project SFY 23 | 2 of 4 | $7,416,742 | +10% |
| 14 DEC 2023 | D265133 | Region 02 | RTE 162 OVER CANYON ROAD AND FLAT CREEK DECK REPLACEMENT | 4 of 7 | $3,882,388 | +37% |
| 15 JUN 2023 | D265049 | Region 01 | Bridge Where and When SFY 23 | 2 of 3 | $8,341,053 | +6.0% |
| 18 MAY 2023 | D265010 | Region 01 | Bridge Preservation SFY 2023 | 2 of 4 | $12,994,049 | +8.0% |
| 23 MAR 2023 | D264867 | Region 02 | ROUTE 28 OVER S. INLET RAQUETTE LAKE - BRIDGE REPLACEMENT | 2 of 2 | $25,407,407 | +56% |
| 19 JAN 2023 | D264951 | Region 01 | Culvert Replacements & REHAB/REPAIRS, SFY22 | 2 of 4 | $8,062,626 | +7.0% |
| 15 DEC 2022 | D264888 | Region 02 | BRIDGE REPLACEMENTS, NYS Routes 5S, 5 & 168. | 4 of 4 | $5,036,631 | +22% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.