D A Collins Construction Co Inc submitted 22 bids on New York State DOT contracts in the data, from 16 JUN 2022 to 07 MAY 2026, and was the low bidder on 8 of them (36%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $55,272,184
- Latest bid
- 07 MAY 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 1 | 25% |
| 2023 | 5 | 4 | 80% |
| 2024 | 3 | 0 | 0% |
| 2025 | 7 | 2 | 29% |
| 2026 | 3 | 1 | 33% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 01 | 13 | 7 | 54% |
| Region 08 | 7 | 1 | 14% |
| Region 09 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Office Technology and Supplies | 637.34 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Field Change Payment (FCP) | 697.03 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 10 | 10 (100%) | $107.50 | $90.00 |
| Type III Construction Barricades | 619.04 | EACH | 12 | 9 (75%) | $80.50 | $115.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 16 | 8 (50%) | $67.00 | $71.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 7 | 7 (100%) | $105.00 | $85.00 |
| 691.04000020 | 6 | 6 (100%) | $1.00 | $1.00 | ||
| 675.99000023 | 6 | 6 (100%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Harrison & Burrowes Bridge Constructors Inc | 11 | 5 of 11 |
| Bette & Cring LLC | 5 | 4 of 5 |
| Argenio Brothers Inc | 5 | 4 of 5 |
| Lancaster Development and Tully Construction Co LLC | 4 | 2 of 4 |
| A Servidone Inc/B Anthony Construction Corp JV | 4 | 0 of 4 |
| Northbrook Contracting Corp | 4 | 2 of 4 |
| James H Maloy Inc | 3 | 0 of 3 |
| Jrcruz Corp | 3 | 1 of 3 |
| Economy Paving Co Inc | 2 | 2 of 2 |
| Vector Construction Corp | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 MAY 2026 | D265769 | Region 01 | Bridge Repair/Culvert Replacement SFY 27A | 3 of 5 | $14,490,892 | +6.0% |
| 26 FEB 2026 | D265662 | Region 01 | Bridge Preservation SFY 25 | 1 of 1 | $15,455,797 | Low |
| 22 JAN 2026 | D265623 | Region 01 | HIGHWAY SIGN REPLACEMENT - Various Routes | 2 of 2 | $4,399,808 | +13% |
| 06 NOV 2025 | D265593 | Region 01 | BRIDGE REHABILITATION - Various Routes | 4 of 4 | $9,979,854 | +164% |
| 26 JUN 2025 | D265514 | Region 01 | BRIDGE WHERE & WHEN SFY 25 | 1 of 2 | $6,607,127 | Low, 20% under the second |
| 26 JUN 2025 | D265519 | Region 01 | BRIDGE REHABILITATION - Water Street Over D&H Railroad | 3 of 3 | $7,350,007 | +37% |
| 27 MAR 2025 | D265440 | Region 08 | Culvert Replacements, Orange and Ulster Counties | 2 of 6 | $5,731,665 | +1.0% |
| 27 MAR 2025 | D265466 | Region 01 | Interstate Overhead Sign Structure Replacemen | 1 of 1 | $4,194,874 | Low |
| 20 FEB 2025 | D265386 | Region 08 | Culvert Replacements and Rehabilitations - Various Locations | 3 of 5 | $11,174,196 | +19% |
| 20 FEB 2025 | D265402 | Region 08 | REHAB/IMPROVEMENTS & CULVERT REPLACEMENTS- NYS Rts 94 & 17A | 2 of 5 | $32,580,233 | +7.0% |
| 28 MAR 2024 | D265033 | Region 09 | BRIDGE REHABILITATION - Bridge Street over Delaware River | 6 of 6 | $22,689,777 | +27% |
| 08 FEB 2024 | D265201 | Region 08 | RT 376 (Raymond Ave) at Hooker Ave Intersection Improvements | 4 of 11 | $13,054,115 | +14% |
| 25 JAN 2024 | D265161 | Region 01 | PIN 1811.31 Bridge Deck Replacement Project SFY 23 | 4 of 4 | $8,207,270 | +21% |
| 15 JUN 2023 | D265049 | Region 01 | Bridge Where and When SFY 23 | 1 of 3 | $7,834,528 | Low, 6.0% under the second |
| 18 MAY 2023 | D265010 | Region 01 | Bridge Preservation SFY 2023 | 1 of 4 | $11,995,270 | Low, 8.0% under the second |
| 18 MAY 2023 | D265035 | Region 08 | SUBSURFACE & PAVEMENT REPAIR, RTE 9W, Town & City Newburgh | 1 of 3 | $3,645,164 | Low, 3.0% under the second |
| 23 MAR 2023 | D264985 | Region 01 | Interstate Overhead Sign Structures Replacement, SFY 23 | 1 of 2 | $3,472,972 | Low, 11% under the second |
| 02 FEB 2023 | D264953 | Region 08 | PMI PAVING & GUIDERAIL, I-84 ROUTE 747 TO ROUTE 32 | 6 of 7 | $16,689,838 | +21% |
| 01 DEC 2022 | D264887 | Region 08 | Culvert Replacement Project, Orange and Ulster Counties | 4 of 10 | $6,425,216 | +15% |
| 01 DEC 2022 | D264902 | Region 01 | Replacement of the bridge on NY Rte 2 over NY Rte 22 | 3 of 3 | $5,148,743 | +15% |
| 20 OCT 2022 | D264882 | Region 09 | 2021 BRIDGE DECK PROGRAM - ROUTE 17 BRIDGES | 7 of 7 | $18,055,000 | +49% |
| 16 JUN 2022 | D264818 | Region 01 | Bridge Where and When SFY 2022, NYSDOT Region-1 | 1 of 3 | $2,066,452 | Low, 4.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.