Northbrook Contracting Corp: NYSDOT bid record

Northbrook Contracting Corp submitted 15 bids on New York State DOT contracts in the data, from 01 DEC 2022 to 05 MAR 2026, and was the low bidder on 4 of them (27%). When it was not low, its total sat a median +14% above the low bid.

Owner
New York State DOT
Low bid volume
$26,909,520
Latest bid
05 MAR 2026
Data through
15 OCT 2026
15Bids
4Low bids
27Win rate, percent
+14%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
2022100%
20233133%
2024200%
20254125%
20265240%
Northbrook Contracting Corp, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 0814429%
Region 09100%
Northbrook Contracting Corp, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL1515 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1515 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1515 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL1414 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1414 (100%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.000013QUALITY UNIT99 (100%)$120.00$90.00
Asphalt Pavement Joint Adhesive418.7603LF156 (40%)$3.00$1.00
Construction Testing supplies – Consumables637.36DOL66 (100%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT66 (100%)$107.50$85.00
Partnering Workshop637.35DOL66 (100%)$1.00$1.00
Silt Fence - Temporary209.13LF75 (71%)$6.00$7.00
Temporary Positive Barrier – Category 6 (Pinning Required)619.1716LF75 (71%)$60.00$50.50
Northbrook Contracting Corp, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Morano Brothers Corp84 of 8
A Servidone Inc/B Anthony Construction Corp JV63 of 6
Jrcruz Corp64 of 6
D A Collins Construction Co Inc42 of 4
Montesano Bros Inc40 of 4
Transit Construction Corp32 of 3
Elq Industries Inc30 of 3
Gianfia Corp32 of 3
A Colarusso & Son Inc31 of 3
Argenio Brothers Inc22 of 2
Northbrook Contracting Corp, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
05 MAR 2026D265730Region 08Rt 52 Retaining Wall Drainage Guide Rail & Shoulder1 of 2$8,933,000Low, 84% under the second
22 JAN 2026D265529Region 08HIGHWAY PEDESTRIAN SAFETY IMPROVEMENTS2 of 4$6,938,000+3.0%
22 JAN 2026D265531Region 08PEDESTRIAN SAFETY IMPROVEMENTS3 of 3$5,325,000+14%
22 JAN 2026D265638Region 08CULVERT REPLACEMENTS & REHABILITATIONS1 of 3$7,221,520Low, 10% under the second
22 JAN 2026D265674Region 09RETAINING WALL IMPROVEMENT - NY Route 525 of 5$4,840,000+40%
27 MAR 2025D265440Region 08Culvert Replacements, Orange and Ulster Counties1 of 6$5,665,000Low, 1.0% under the second
13 MAR 2025D265463Region 08CATCH BASIN REPAIRS - Hutchinson River Parkway, Rt 907W5 of 7$5,997,688+47%
27 FEB 2025D265424Region 08Replacement and Relining of Culverts - Various locations2 of 5$13,775,000+3.0%
20 FEB 2025D265386Region 08Culvert Replacements and Rehabilitations - Various Locations2 of 5$9,923,000+6.0%
28 MAR 2024D265217Region 08Highway Reconstruction US Rt 6 at Annsville Circle3 of 6$26,235,000+9.0%
08 FEB 2024D265201Region 08RT 376 (Raymond Ave) at Hooker Ave Intersection Improvements9 of 11$14,443,080+27%
23 MAR 2023D264989Region 08RT6 & RT125 PAVE/PED IMPROVEMENTS TOWN CORTLANDT/MAMARONECK1 of 5$5,090,000Low, 3.0% under the second
09 MAR 2023D264982Region 08RT 9 CATCH BASIN REPAIRS, RT 9, RT 113 TO WEST DORSEY LN2 of 4$2,110,000+1.0%
19 JAN 2023D264967Region 08TACONIC STATE PARKWAY7 of 8$4,040,000+115%
01 DEC 2022D264887Region 08Culvert Replacement Project, Orange and Ulster Counties7 of 10$7,795,000+40%
Northbrook Contracting Corp: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy