NYSDOT contract D265638 bid tabulation
CULVERT REPLACEMENTS & REHABILITATIONS. Let by New York State DOT on January 22, 2026, Ulster, Region 08. 3 bids received; low bid $7,221,520 by Northbrook Contracting Corp.
- Owner
- New York State DOT
- Letting
- 22 JAN 2026
- Pay items
- 129
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northbrook Contracting Corp | $7,221,520 | Low |
| 2 | A Colarusso & Son Inc | $7,949,949 | +10% |
| 3 | Ben Ciccone Inc | $9,789,045 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northbrook Contracting Corp | 2. A Colarusso & Son Inc | 3. Ben Ciccone Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $22,378 | $170,000 | $100,000 |
| 2 | (203.01920007) | 22 | $60.00 | $527.00 | $145.00 | |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 1,920 | $80.00 | $55.00 | $148.00 |
| 4 | Embankment In Place (203.03) | CY | 1,533 | $65.00 | $54.00 | $98.00 |
| 5 | Select Granular Fill (203.07) | CY | 33 | $65.00 | $144.00 | $65.00 |
| 6 | Select Structural Fill (203.21) | CY | 604 | $90.00 | $113.00 | $145.00 |
| 7 | (203.24010017) | 47 | $80.00 | $201.00 | $150.00 | |
| 8 | (203.98080015) | 5,000 | $4.00 | $12.00 | $4.80 | |
| 9 | (205.0201) | LS | 1 | $11,000 | $4,000.00 | $29,000 |
| 10 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 48 | $200.00 | $241.00 | $211.00 |
| 11 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 10 | $650.00 | $553.00 | $525.00 |
| 12 | (205.050201) | TON | 600 | $50.00 | $130.00 | $190.00 |
| 13 | Structure Excavation (206.01) | CY | 3,491 | $68.00 | $39.00 | $58.00 |
| 14 | Trench and Culvert Excavation (206.0201) | CY | 89 | $80.00 | $103.00 | $100.00 |
| 15 | Geotextile Bedding (207.20) | SY | 529 | $9.00 | $4.50 | $3.50 |
| 16 | Seed and Mulch – Temporary (209.1003) | SY | 113 | $7.00 | $12.00 | $15.00 |
| 17 | Silt Fence - Temporary (209.13) | LF | 1,327 | $6.00 | $12.00 | $15.00 |
| 18 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 137 | $3.00 | $59.00 | $16.00 |
| 19 | Stabilized Construction Access (209.22) | SY | 825 | $20.00 | $58.00 | $40.00 |
| 20 | Sediment Filter Log, 12″ (209.2301) | LF | 22 | $22.00 | $72.00 | $25.00 |
| 21 | (304.11000008) | 1,124 | $98.00 | $112.00 | $123.00 | |
| 22 | (404.0189) | TON | 58 | $175.00 | $263.00 | $284.00 |
| 23 | (404.1281) | TON | 515 | $280.00 | $215.00 | $227.00 |
| 24 | (404.1989) | TON | 449 | $209.00 | $156.00 | $245.00 |
| 25 | (404.3789) | TON | 1,392 | $210.00 | $152.00 | $170.00 |
| 26 | (404.4289) | TON | 4 | $800.00 | $1,000.00 | $437.00 |
| 27 | (404.4389) | TON | 5 | $800.00 | $950.00 | $376.00 |
| 28 | (404.4589) | TON | 14 | $800.00 | $899.00 | $239.00 |
| 29 | Straight Tack Coat (407.0103) | GAL | 256 | $40.00 | $48.00 | $56.00 |
| 30 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 2,270 | $7.00 | $1.75 | $8.00 |
| 31 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,280 | $40.00 | $28.00 | $70.00 |
| 32 | (552.2001) | LF | 114 | $209.00 | $344.00 | $452.00 |
| 33 | (552.2002) | LF | 121 | $209.00 | $375.00 | $442.00 |
| 34 | (552.2003) | LF | 475 | $209.00 | $265.00 | $320.00 |
| 35 | (552.2101) | LF | 30 | $1,600.00 | $1,650.00 | $1,567.00 |
| 36 | (552.2102) | LF | 30 | $1,600.00 | $1,650.00 | $1,567.00 |
| 37 | (552.2201) | LF | 152 | $330.00 | $389.00 | $446.00 |
| 38 | (552.2202) | LF | 156 | $330.00 | $389.00 | $448.00 |
| 39 | (552.2203) | LF | 475 | $330.00 | $350.00 | $395.00 |
| 40 | (552.230201) | SF | 396 | $28.00 | $65.00 | $29.00 |
| 41 | (552.230202) | SF | 508 | $22.00 | $60.00 | $29.00 |
| 42 | (552.230203) | SF | 2,023 | $14.00 | $53.00 | $23.00 |
| 43 | (553.030001) | EACH | 1 | $228,000 | $275,000 | $494,400 |
| 44 | (553.030002) | EACH | 1 | $293,000 | $240,000 | $783,700 |
| 45 | (553.030003) | EACH | 1 | $160,000 | $160,000 | $425,100 |
| 46 | (553.030004) | EACH | 1 | $183,000 | $67,000 | $288,200 |
| 47 | (553.030005) | EACH | 1 | $208,000 | $90,000 | $400,600 |
| 48 | (554.3001) | SF | 1,619 | $48.00 | $75.00 | $77.00 |
| 49 | Concrete for Structures, Performance (555.0021) | CY | 3 | $2,500.00 | $7,350.00 | $2,700.00 |
| 50 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $18.42 | $18.42 | $18.42 |
| 51 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 534 | $5.00 | $6.50 | $1.00 |
| 52 | (583.05000008) | 2,561 | $117.00 | $102.00 | $115.00 | |
| 53 | (595.50000018) | 1,808 | $15.00 | $11.00 | $9.00 | |
| 54 | (603.6013) | LF | 126 | $550.00 | $735.00 | $790.00 |
| 55 | (603.63070815) | 114 | $3,100.00 | $2,600.00 | $2,700.00 | |
| 56 | (603.63080615) | 97 | $3,250.00 | $2,900.00 | $3,100.00 | |
| 57 | (603.7313) | EACH | 2 | $20,000 | $34,000 | $10,000 |
| 58 | Concrete Collars (603.77) | EACH | 1 | $4,000.00 | $23,000 | $5,000.00 |
| 59 | (603.9815) | LF | 8 | $300.00 | $485.00 | $75.00 |
| 60 | (603.9848) | LF | 11 | $450.00 | $600.00 | $650.00 |
| 61 | (604.302122) | LF | 7 | $1,500.00 | $1,000.00 | $440.00 |
| 62 | Box Beam Guide Railing (606.10) | LF | 219 | $80.00 | $79.00 | $104.00 |
| 63 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 41 | $130.00 | $121.00 | $140.00 |
| 64 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 6 | $500.00 | $471.00 | $120.00 |
| 65 | Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102) | LF | 6 | $500.00 | $471.00 | $150.00 |
| 66 | Box Beam End Piece (606.120101) | EACH | 3 | $3,000.00 | $2,200.00 | $990.00 |
| 67 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 3 | $3,800.00 | $3,300.00 | $4,800.00 |
| 68 | HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts (606.2702) | LF | 144 | $72.00 | $68.00 | $79.00 |
| 69 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 1 | $5,000.00 | $3,348.00 | $6,390.00 |
| 70 | Resetting Box Beam Guide Railing (606.53) | LF | 305 | $50.00 | $38.00 | $62.00 |
| 71 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 2 | $800.00 | $868.00 | $2,000.00 |
| 72 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 131 | $10.00 | $14.00 | $15.00 |
| 73 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 2 | $140.00 | $140.00 | $140.00 |
| 74 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 33 | $300.00 | $355.00 | $455.00 |
| 75 | (609.0401) | LF | 104 | $125.00 | $174.00 | $125.00 |
| 76 | (609.06000008) | 113 | $30.00 | $29.00 | $10.00 | |
| 77 | Turf Establishment – Performance (610.1605) | SY | 946 | $30.00 | $30.00 | $45.00 |
| 78 | (613.04000001) | 36 | $70.00 | $302.00 | $235.00 | |
| 79 | (614.060103) | EACH | 5 | $400.00 | $1,500.00 | $355.00 |
| 80 | (614.060203) | EACH | 5 | $900.00 | $2,200.00 | $630.00 |
| 81 | (614.060303) | EACH | 5 | $1,200.00 | $3,500.00 | $950.00 |
| 82 | (615.01010108) | 142 | $350.00 | $352.00 | $335.00 | |
| 83 | (617.11000024) | LS | 1 | $2,500.00 | $3,700.00 | $10,000 |
| 84 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $375,000 | $780,000 | $850,000 |
| 85 | Type III Construction Barricades (619.04) | EACH | 33 | $300.00 | $266.00 | $210.00 |
| 86 | (619.080102) | LF | 35,007 | $1.70 | $2.00 | $0.90 |
| 87 | (619.080202) | EACH | 6 | $240.00 | $110.00 | $135.00 |
| 88 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 4,536 | $4.00 | $7.00 | $0.65 |
| 89 | (619.100101) | LF | 5,390 | $1.00 | $0.35 | $0.65 |
| 90 | (619.100102) | LF | 59,430 | $2.00 | $1.10 | $0.65 |
| 91 | (619.100202) | EACH | 5 | $300.00 | $221.00 | $150.00 |
| 92 | (619.110513) | EACH | 13 | $6,000.00 | $5,800.00 | $6,000.00 |
| 93 | (619.130201) | EACH | 8 | $16,000 | $23,500 | $35,000 |
| 94 | Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714) | LF | 1,170 | $45.00 | $53.00 | $50.00 |
| 95 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 1,434 | $46.00 | $65.00 | $53.00 |
| 96 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 14 | $4,500.00 | $6,100.00 | $5,000.00 |
| 97 | Mailboxes (619.27) | EACH | 1 | $700.00 | $1,600.00 | $350.00 |
| 98 | (619.99230103) | 16 | $5,000.00 | $11,000 | $6,400.00 | |
| 99 | Stone Filling (Light) (620.03) | CY | 81 | $120.00 | $183.00 | $190.00 |
| 100 | Stone Filling (Medium) (620.04) | CY | 44 | $160.00 | $290.00 | $210.00 |
| 101 | Bedding Material, Type 1 (620.0801) | CY | 27 | $140.00 | $216.00 | $200.00 |
| 102 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 656 | $11.00 | $19.00 | $18.00 |
| 103 | (621.51010010) | 110 | $25.00 | $27.00 | $20.00 | |
| 104 | (623.12000008) | 195 | $180.00 | $190.00 | $49.00 | |
| 105 | Survey Operations (625.01) | LS | 1 | $120,000 | $150,000 | $110,000 |
| 106 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 12 | $1,500.00 | $2,000.00 | $410.00 |
| 107 | (627.50140008) | 1,024 | $10.00 | $12.00 | $28.00 | |
| 108 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 2,887 | $1.00 | $10.00 | $1.30 |
| 109 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 30,920 | $1.00 | $2.00 | $0.80 |
| 110 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,000.00 | $2,100.00 | $8,000.00 |
| 111 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 24 | $3,800.00 | $3,800.00 | $5,000.00 |
| 112 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 113 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 114 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 10 | $90.00 | $83.00 | $200.00 |
| 115 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 1 | $90.00 | $81.00 | $525.00 |
| 116 | Steel Post, 1.1 lb/ft (646.31) | EACH | 10 | $150.00 | $138.00 | $550.00 |
| 117 | (647.18010108) | 1 | $1,500.00 | $5,500.00 | $2,500.00 | |
| 118 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $300.00 | $166.00 | $1,250.00 |
| 119 | Welded Frame & Rectangular Grate 22 (655.1022) | EACH | 1 | $2,500.00 | $4,200.00 | $2,235.00 |
| 120 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 6,250 | $2.00 | $2.25 | $1.50 |
| 121 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 6,704 | $2.00 | $2.25 | $0.73 |
| 122 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 4 | $100.00 | $83.00 | $110.00 |
| 123 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 7 | $300.00 | $249.00 | $150.00 |
| 124 | Field Change Payment (FCP) (697.03) | DOL | 264,000 | $1.00 | $1.00 | $1.00 |
| 125 | Asphalt Price Adjustment (698.04) | DOL | 420 | $1.00 | $1.00 | $1.00 |
| 126 | Fuel Price Adjustment (698.05) | DOL | 700 | $1.00 | $1.00 | $1.00 |
| 127 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 128 | (698.93940008) | LS | 1 | $760,000 | $760,000 | $760,000 |
| 129 | Mobilization (699.040001) | LS | 1 | $270,000 | $300,000 | $367,250 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.