NYSDOT contract D265638 bid tabulation

CULVERT REPLACEMENTS & REHABILITATIONS. Let by New York State DOT on January 22, 2026, Ulster, Region 08. 3 bids received; low bid $7,221,520 by Northbrook Contracting Corp.

Owner
New York State DOT
Letting
22 JAN 2026
Pay items
129
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northbrook Contracting Corp$7,221,520Low
2A Colarusso & Son Inc$7,949,949+10%
3Ben Ciccone Inc$9,789,045+36%
NYSDOT contract D265638: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northbrook Contracting Corp2. A Colarusso & Son Inc3. Ben Ciccone Inc
1Clearing and Grubbing (201.06)LS1$22,378$170,000$100,000
2 (203.01920007)22$60.00$527.00$145.00
3Unclassified Excavation and Disposal (203.02)CY1,920$80.00$55.00$148.00
4Embankment In Place (203.03)CY1,533$65.00$54.00$98.00
5Select Granular Fill (203.07)CY33$65.00$144.00$65.00
6Select Structural Fill (203.21)CY604$90.00$113.00$145.00
7 (203.24010017)47$80.00$201.00$150.00
8 (203.98080015)5,000$4.00$12.00$4.80
9 (205.0201)LS1$11,000$4,000.00$29,000
10Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR48$200.00$241.00$211.00
11Petroleum Contamination Parameter Analysis (205.0401)EACH10$650.00$553.00$525.00
12 (205.050201)TON600$50.00$130.00$190.00
13Structure Excavation (206.01)CY3,491$68.00$39.00$58.00
14Trench and Culvert Excavation (206.0201)CY89$80.00$103.00$100.00
15Geotextile Bedding (207.20)SY529$9.00$4.50$3.50
16Seed and Mulch – Temporary (209.1003)SY113$7.00$12.00$15.00
17Silt Fence - Temporary (209.13)LF1,327$6.00$12.00$15.00
18Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY137$3.00$59.00$16.00
19Stabilized Construction Access (209.22)SY825$20.00$58.00$40.00
20Sediment Filter Log, 12″ (209.2301)LF22$22.00$72.00$25.00
21 (304.11000008)1,124$98.00$112.00$123.00
22 (404.0189)TON58$175.00$263.00$284.00
23 (404.1281)TON515$280.00$215.00$227.00
24 (404.1989)TON449$209.00$156.00$245.00
25 (404.3789)TON1,392$210.00$152.00$170.00
26 (404.4289)TON4$800.00$1,000.00$437.00
27 (404.4389)TON5$800.00$950.00$376.00
28 (404.4589)TON14$800.00$899.00$239.00
29Straight Tack Coat (407.0103)GAL256$40.00$48.00$56.00
30Asphalt Pavement Joint Adhesive (418.7603)LF2,270$7.00$1.75$8.00
31Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,280$40.00$28.00$70.00
32 (552.2001)LF114$209.00$344.00$452.00
33 (552.2002)LF121$209.00$375.00$442.00
34 (552.2003)LF475$209.00$265.00$320.00
35 (552.2101)LF30$1,600.00$1,650.00$1,567.00
36 (552.2102)LF30$1,600.00$1,650.00$1,567.00
37 (552.2201)LF152$330.00$389.00$446.00
38 (552.2202)LF156$330.00$389.00$448.00
39 (552.2203)LF475$330.00$350.00$395.00
40 (552.230201)SF396$28.00$65.00$29.00
41 (552.230202)SF508$22.00$60.00$29.00
42 (552.230203)SF2,023$14.00$53.00$23.00
43 (553.030001)EACH1$228,000$275,000$494,400
44 (553.030002)EACH1$293,000$240,000$783,700
45 (553.030003)EACH1$160,000$160,000$425,100
46 (553.030004)EACH1$183,000$67,000$288,200
47 (553.030005)EACH1$208,000$90,000$400,600
48 (554.3001)SF1,619$48.00$75.00$77.00
49Concrete for Structures, Performance (555.0021)CY3$2,500.00$7,350.00$2,700.00
50Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$18.42$18.42$18.42
51Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB534$5.00$6.50$1.00
52 (583.05000008)2,561$117.00$102.00$115.00
53 (595.50000018)1,808$15.00$11.00$9.00
54 (603.6013)LF126$550.00$735.00$790.00
55 (603.63070815)114$3,100.00$2,600.00$2,700.00
56 (603.63080615)97$3,250.00$2,900.00$3,100.00
57 (603.7313)EACH2$20,000$34,000$10,000
58Concrete Collars (603.77)EACH1$4,000.00$23,000$5,000.00
59 (603.9815)LF8$300.00$485.00$75.00
60 (603.9848)LF11$450.00$600.00$650.00
61 (604.302122)LF7$1,500.00$1,000.00$440.00
62Box Beam Guide Railing (606.10)LF219$80.00$79.00$104.00
63Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF41$130.00$121.00$140.00
64Box Beam Guide Railing With Extra Long Posts (606.1001)LF6$500.00$471.00$120.00
65Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102)LF6$500.00$471.00$150.00
66Box Beam End Piece (606.120101)EACH3$3,000.00$2,200.00$990.00
67Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH3$3,800.00$3,300.00$4,800.00
68HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts (606.2702)LF144$72.00$68.00$79.00
69Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH1$5,000.00$3,348.00$6,390.00
70Resetting Box Beam Guide Railing (606.53)LF305$50.00$38.00$62.00
71Removing and Storing Box Beam Guide Railing End Assembly (606.6920)EACH2$800.00$868.00$2,000.00
72Removing and Disposing Corrugated Beam Guide Railing (606.71)LF131$10.00$14.00$15.00
73Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT2$140.00$140.00$140.00
74Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON33$300.00$355.00$455.00
75 (609.0401)LF104$125.00$174.00$125.00
76 (609.06000008)113$30.00$29.00$10.00
77Turf Establishment – Performance (610.1605)SY946$30.00$30.00$45.00
78 (613.04000001)36$70.00$302.00$235.00
79 (614.060103)EACH5$400.00$1,500.00$355.00
80 (614.060203)EACH5$900.00$2,200.00$630.00
81 (614.060303)EACH5$1,200.00$3,500.00$950.00
82 (615.01010108)142$350.00$352.00$335.00
83 (617.11000024)LS1$2,500.00$3,700.00$10,000
84Basic Work Zone Traffic Control (619.01)LS1$375,000$780,000$850,000
85Type III Construction Barricades (619.04)EACH33$300.00$266.00$210.00
86 (619.080102)LF35,007$1.70$2.00$0.90
87 (619.080202)EACH6$240.00$110.00$135.00
88Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF4,536$4.00$7.00$0.65
89 (619.100101)LF5,390$1.00$0.35$0.65
90 (619.100102)LF59,430$2.00$1.10$0.65
91 (619.100202)EACH5$300.00$221.00$150.00
92 (619.110513)EACH13$6,000.00$5,800.00$6,000.00
93 (619.130201)EACH8$16,000$23,500$35,000
94Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714)LF1,170$45.00$53.00$50.00
95Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF1,434$46.00$65.00$53.00
96Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802)EACH14$4,500.00$6,100.00$5,000.00
97Mailboxes (619.27)EACH1$700.00$1,600.00$350.00
98 (619.99230103)16$5,000.00$11,000$6,400.00
99Stone Filling (Light) (620.03)CY81$120.00$183.00$190.00
100Stone Filling (Medium) (620.04)CY44$160.00$290.00$210.00
101Bedding Material, Type 1 (620.0801)CY27$140.00$216.00$200.00
102Clean, Grade and Shape Existing Roadside Section (621.05)LF656$11.00$19.00$18.00
103 (621.51010010)110$25.00$27.00$20.00
104 (623.12000008)195$180.00$190.00$49.00
105Survey Operations (625.01)LS1$120,000$150,000$110,000
106Concrete Right of Way Markers Type L (Low) (625.04)EACH12$1,500.00$2,000.00$410.00
107 (627.50140008)1,024$10.00$12.00$28.00
108Cleaning Existing Pavement and/or Shoulder (633.11)SY2,887$1.00$10.00$1.30
109Cleaning and Preparation of Pavement Surfaces-Lines (635.0103)LF30,920$1.00$2.00$0.80
110Concrete Cylinder Curing Equipment (637.04)EACH1$3,000.00$2,100.00$8,000.00
111Engineer’s Field Office – Type 3 (637.13)MONTH24$3,800.00$3,800.00$5,000.00
112Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00
113Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00
114Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH10$90.00$83.00$200.00
115Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24)EACH1$90.00$81.00$525.00
116Steel Post, 1.1 lb/ft (646.31)EACH10$150.00$138.00$550.00
117 (647.18010108)1$1,500.00$5,500.00$2,500.00
118Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH2$300.00$166.00$1,250.00
119Welded Frame & Rectangular Grate 22 (655.1022)EACH1$2,500.00$4,200.00$2,235.00
120White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF6,250$2.00$2.25$1.50
121Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF6,704$2.00$2.25$0.73
122White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH4$100.00$83.00$110.00
123White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH7$300.00$249.00$150.00
124Field Change Payment (FCP) (697.03)DOL264,000$1.00$1.00$1.00
125Asphalt Price Adjustment (698.04)DOL420$1.00$1.00$1.00
126Fuel Price Adjustment (698.05)DOL700$1.00$1.00$1.00
127Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
128 (698.93940008)LS1$760,000$760,000$760,000
129Mobilization (699.040001)LS1$270,000$300,000$367,250
NYSDOT contract D265638: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 22, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy